A one-day sports tournament will be arranged for P & L Pvt. Ltd. Being the project manager in-charge of this arrangement, the most important duty is to make proper planning and organisation so that the one-day sports tournament can be arranged successfully. As the company does not have any common room or any arrangement of indoor games, therefore it is decided that outdoor games will be played (Reid & Ritchie, 2011). Now keeping the mind on the work pressure and health of the employees of the company Cricket is chosen as the outdoor sport. The tournament will be played in the nearby ground which is known as the field of sports. It will take place 20th August 2016. Four teams can take part in this tournament. It will be a 10-10 over match. Each team will contain eleven players. A lottery system will be made for selecting the teams for grouping. There will be two groups – group A and group B. Each group will contain 2 teams. First, in the group stage, the teams of the same group will play against each other. The winners from the two groups will play the final match. The tournament will start 7 o’ clock in the morning. At 7 o’ clock, the Managing director and CEO of the company will provide a short speech. The first match will start on 8 A.M. after fifteen minutes of the completion of the first group match; the second group match will start. The arrangement of meals and beverages will be provided (Mikkelsen, 2010). The final match will take place 2 P.M. The prize distribution will be done from 6 P.M. the prizes will be distributed to the winning team by the CEO of the company. The four teams will be provided different dresses in order distinguish them. The balls, bat, wickets, and all the protective equipment and materials will be provided by the company. The match referee and the umpires will be selected from outside and only experts will be considered.
The project scope statement contains the following checklists:
The main and primary objective of this project is to organise a successful one-day sports tournament for P & L Pvt. Ltd.
The deliverables of this project are given below:
There are several milestones of this project and these are given below:
The technical requirements of this project are given below:
For observing and monitoring the lights, fans, and other electronics and electrical devices few technicians will be kept.
There are several limitations of this project. The permit for playing in the ground can be obtained till 7 P.M. of the day of the tournament. Therefore, the matches and the prize giving ceremony must be completed by 6.30 P.M. of that day so that the ground can be evacuated with 7 o’ clock in the evening of that day (Lawton, 2011). The crickets will be taken as rent from a retailer and those must also be returned within 8 P.M. of the same day. The technicians will start to pack their items including lights, fans and other electrical and electronic items from 7 o’ clock in the evening of the day of the tournament (Patel, 2008). Therefore at any cost, the tournament must be started on time so that it can be finished within the specified time duration.
The project plans and the schedule must be checked from the management of P & L Pvt. Ltd and the feedback and review of the management must be obtained (Kerzner, 2001). According to the management’s feedback, if any planning needs to be changed then it has to be now.
The project priorities can be understood with the help of the following matrix and it is known as the project priority matrix (Maylor, 2010):
Time |
Scope or performance |
Cost |
|
Constrain |
o |
||
Enhance |
o |
||
Accept |
o |
Here, in this project, time is fixed. The arrangement must be done within 20th August 2016 and the duration of the tournament is also fixed because the ground has to be evacuated after certain duration (Lawton, 2011). The scope or performance of the project can be enhanced. All the arrangements can be made of high quality. In order to enhance the performance and also to conduct the tournament within such specified time limit, the management must accept the costs that are required for accomplishing such things.
This one-day cricket tournament contains lots of activities. In order to make them easy and properly done they are broken down into several simpler works or activities (Deeprose, 2012). First of planning is done. In this stage, a time schedule is prepared. Then a budget is prepared according to the expected costs of the cricket kits, rent of the ground, costs for preparing shades and podium, wages of the technicians, rent of the electrical and electronic items, and the costs of the foods and beverages. The rents of the jersey are also included in this budget. It also includes the fees of the match referee and the two umpires. After this, a team is to be prepared for observing and reporting all the activities. Now a final confirmation notice is given to all the employees of the office and they are asked to participate in this tournament (Hyväri, 2016). They are also asked to make a team and enlist the name of the team. Names will only be taken as a team but not as individuals. The numbers of total persons including and excluding the players are calculated. Now the application for the approval of organising the tournament on 20th august is to be done and sent to the in- charge of the club ground. The technicians and the persons for preparing shades and podium are to be informed. Then the jersey and the food and beverages are to be ordered. The cricket kit is also to be rented. The match referee and two umpires are selected (Hyväri, 2016). The prizes are to be bought. While doing these activities proper coordination must be met and this is to be monitored and reported by the assigned team members to the project manager.
Figure: Work Breakdown Structure
Source: (Harris, 2014)
Cost estimation is needed in any project management and in this case it also required (Heerkens, 2012). The cost estimation of the project has been presented herein below:
Rent of cricket kit = 200 SGD
Rent of the ground = 800 SGD
Technicians wage = 10 SGD/hour per person
There will be two technicians and therefore total technicians wage = 2 x 10 x 15 = 300 SGD
Total time is taken 15 hours. It includes the duration of the tournament and the time for setting the instruments before the match (Pernecky, 2015). They will have three assistants and their wage is 5 SGD/hour per person.
Therefore, total wage = 5 x 15 x 3 = 225 SGD
Costs of foods and beverages
Basic lunch time menu with a drink = 12 SGD
Breakfast = 6 SGD
1litre of milk = 4 SGD
Total number of players = 13 (11 + 2) x 4 = 52
Total employees = 120
It is estimated that everyone will come, hence breakfast and meal will be provided for 120 persons. The milk will only be given to the players. The match referee and the umpires are to be given the same meal as the players (Field & Keller, 2008). The CEO and MD and other important members are also to be given all the meals. The technicians and the assistants will also be given the meal that is kept for the non–players. The project manager and the project management team will also get the same meal as the other non–players. Now the total number of people has become 135.
Therefore cost for meal of 135 people = 135 x (6 + 12) = 135 x 18 = 2430 SGD
The cost of milk for the players (including match referee and umpires) and the important members = (52 + 5 + 3) x 4 = 60 x 4 = 240 SGD
The arrangement of water will be done. 410 litres of water will be arranged. The cost of one litre of water is 3.78 SGD.
Therefore, cost of water = 410 x 3.78 = 1549.8 SGD
Therefore, total cost = (200 + 800 + 300 + 225 + 2430 + 240 + 1549.8) = 5744.8 SGD
References
Deeprose, D. (2012). Project management. Oxford, U.K.: Capstone Pub.
Field, M. & Keller, L. (2008). Project management. London: International Thomson Business Press.
Harris, V. (2014). Management Practice Event Management: A New Profession?. Event Management, 9(1), 103-109. https://dx.doi.org/10.3727/1525995042781039
Heerkens, G. (2012). Project management. New York: McGraw-Hill.
Hyväri, I. (2016). Project management effectiveness in project-oriented business organizations. International Journal Of Project Management, 24(3), 216-225. https://dx.doi.org/10.1016/j.ijproman.2005.09.001
Kerzner, H. (2011). Project management. New York: John Wiley.
Lawton, L. (2011). Introduction: Special Issue on Sustainability in the Event Management Sector. Event Management, 15(4), 313-314. https://dx.doi.org/10.3727/152599511×13175676722447
Maylor, H. (2010). Project management. Harlow, England: Financial Times Prentice Hall.
Mikkelsen, H. (2010). Quality of project work and project management. International Journal Of Project Management, 8(3), 138-143. https://dx.doi.org/10.1016/0263-7863(90)90014-3
Patel, V. (2008). Project management. Jaipur, India: Oxford Book Co.
Pernecky, T. (2015). Sustainable Leadership in Event Management. Event Management,19(1), 109-121. https://dx.doi.org/10.3727/152599515×14229071393188
Reid, S. & Ritchie, B. (2011). Risk Management: Event Managers’ Attitudes, Beliefs, and Perceived Constraints. Event Management, 15(4), 329-341. https://dx.doi.org/10.3727/152599511×13175676722528
We provide professional writing services to help you score straight A’s by submitting custom written assignments that mirror your guidelines.
Get result-oriented writing and never worry about grades anymore. We follow the highest quality standards to make sure that you get perfect assignments.
Our writers have experience in dealing with papers of every educational level. You can surely rely on the expertise of our qualified professionals.
Your deadline is our threshold for success and we take it very seriously. We make sure you receive your papers before your predefined time.
Someone from our customer support team is always here to respond to your questions. So, hit us up if you have got any ambiguity or concern.
Sit back and relax while we help you out with writing your papers. We have an ultimate policy for keeping your personal and order-related details a secret.
We assure you that your document will be thoroughly checked for plagiarism and grammatical errors as we use highly authentic and licit sources.
Still reluctant about placing an order? Our 100% Moneyback Guarantee backs you up on rare occasions where you aren’t satisfied with the writing.
You don’t have to wait for an update for hours; you can track the progress of your order any time you want. We share the status after each step.
Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.
Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.
From brainstorming your paper's outline to perfecting its grammar, we perform every step carefully to make your paper worthy of A grade.
Hire your preferred writer anytime. Simply specify if you want your preferred expert to write your paper and we’ll make that happen.
Get an elaborate and authentic grammar check report with your work to have the grammar goodness sealed in your document.
You can purchase this feature if you want our writers to sum up your paper in the form of a concise and well-articulated summary.
You don’t have to worry about plagiarism anymore. Get a plagiarism report to certify the uniqueness of your work.
Join us for the best experience while seeking writing assistance in your college life. A good grade is all you need to boost up your academic excellence and we are all about it.
We create perfect papers according to the guidelines.
We seamlessly edit out errors from your papers.
We thoroughly read your final draft to identify errors.
Work with ultimate peace of mind because we ensure that your academic work is our responsibility and your grades are a top concern for us!
Dedication. Quality. Commitment. Punctuality
Here is what we have achieved so far. These numbers are evidence that we go the extra mile to make your college journey successful.
We have the most intuitive and minimalistic process so that you can easily place an order. Just follow a few steps to unlock success.
We understand your guidelines first before delivering any writing service. You can discuss your writing needs and we will have them evaluated by our dedicated team.
We write your papers in a standardized way. We complete your work in such a way that it turns out to be a perfect description of your guidelines.
We promise you excellent grades and academic excellence that you always longed for. Our writers stay in touch with you via email.