Project Quality Management And Environmental Impact Assessment – Case Study Of Perth Stadium

Description of the case study: Perth Stadium development

Describe about the Project Quality Management And Environmental Impact Assessment?

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

Most of the construction projects fail to generate expected deliverables due to presence of   problems related with poor quality of work, cost overrun and delays (AboMoslim and Russell, 2014). According to Boton, Kubicki and Halin, (2013) increased number of reworks and material wastage reduces the overall efficiency of projects management techniques for developing large constructions. Douglas, (2013) opined that need of implementing quality management tools is increasing for large construction projects as the complexity of designs are increasing. Gatti, (2013) states that quality management techniques require being implemented in all phases of construction projects. It is required in order to improve overall quality of the   deliverables. As the consciousness on environmental degradation is increasing, the need of assessing environmental impacts of construction projects is also increasing. Delaney, (2014) stated that developments of large construction may degrade quality of air of an area. However, according to Chen, Li and Tu, (2013) dumping of wastes in large projects can lead to degradation of soil and water also. As the countries are implementing stricter policies for reducing environmental degradation, importance of evaluating environmental impacts is being more evident. The current report contains discussion on the implementation plan of quality management and environmental assessment techniques in construction of new stadium in Perth.

Perth stadium redevelopment is one of the largest projects in Western Australia (Perthstadium.com.au, 2015).The new stadium in Perth is being developed not only for improving sports infrastructure of the country; it will be responsible for economic growth of Western Australia also. The Government of Western Australia took the initiative for developing new stadium in Perth. Famous constructor Brookfield Multiplex is appointed as the project manager. Scope  of  the  project includes  development  of a multipurpose  stadium  with   about 60000 seats,  transportation facility  including such as foot bridges,  railway station ,bus terminus,  food   courts, entertainment  zones and car parking facility. The scope also includes development play grounds for children, amphitheatre and picnic areas. However the construction is not completed. It is expected that the new stadium will be   open by 2018.

As the stadium requires being completed within short time, implementation of quality management techniques is important for completing the project successfully. As the new stadium development in Perth includes several   construction activities,   undertaking of the project can cause environmental degradation   in Western Australia. As the Government of Western Australia follows strict standards about environmental quality, implementation of environmental assessment techniques is important for uninterrupted execution of construction activities.

Ghaffari, (2013) states that absence of proper quality management techniques leads to wastage of both   financial and human resources. Awange, (2012) opines that identification of parameters on which   quality of the construction related activities depends are important to develop quality management   techniques inn projects. However, parameters for determining quality vary for different projects due to presence of differences among locations and designs (Goetsch and Davis, 2013).

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

Factors   for defining quality: Guichard, (2013) suggested some common parameter for managing quality on a construction project. These parameters include developing any construction according to the design and meeting the requirements of customers. Quality of a construction also depends on fulfilling the specifications of any regulatory bodies associated with the project.

Quality management in Perth stadium reconstruction

The Government of Australia is undertaking the Perth Stadium reconstruction project as a part of    Western Australia development activities (Halwatura and Ranasinghe, 2013).  The new stadium will be used for arranging several national and international sports events (Kuntjoro, Jumahat and Salleh, 2013). Apart from this, local people will also   use    this stadium as an entertainment center.  Design of the stadium is prepared in such way so that the seating capacity can be increased in future. The stadium not only possess advanced infrastructure of   arranging sports events, it also   includes restaurants and transportation facility for visitors.  Analysis on the   design of proposed stadium indicates that quality of the project will depend on meeting the designing specifications, meeting the requirements of Australian Government. Quality of the project will also depend on fulfilling the specifications of Australian Government on environmental standards. As common people are one of the main stakeholders of this project, meeting their expectations will also determine quality of the new stadium.

Need for using quality control techniques in Stadium Development project:   Use   of quality management techniques for executing a project ensures that the tasks needed for fulfilling requirements of customers are being conducted efficiently (Leydecker, 2013). Li and Zhang, (2013) suggests that use of quality management techniques enable the project team to develop policies related with the project   efficiently. The tasks related with   implementation of quality assurance techniques also include setting of standards and developing guidelines. According to Lingard and Wakefield, (2013) quality of a construction project depends on the efficiency of the staffs. Training of members in a project team is required for imp roving efficiency of the whole team. According to Makuch and Pereira, (2012) quality assurance techniques deal with   identification of the need of training in project team. However the tasks related with setting guidelines and monitoring project activities are also conducted as a part of quality assurance technique implementation in project.

The stadium in Perth will be developed on large area. As the size of project is larger than normal   construction projects, several activities will be conducted simultaneously. It indicates that the     project team will face difficulties while monitoring. High complexity of the design  ,  also  indicates  that every activities related with  construction  required  being monitored  closely in order to  meeting requirements of the Government of Australia. The project manager, Brookfield Multiplex is not only responsible for developing the stadium and other secondary construction, the organization is also responsible for maintenance of the stadium in future.  As development of such   large constructions can cause environmental degradation in Perth and surrounding cities, implementation of quality management tools is important for meeting the requirements of the Government and environmental regulatory bodies.

Factors affecting quality: According to McEwen, (2013) a construction project can be segmented into three main phases – designing and planning phase, phase of construction, operation and maintenance phase. As the quality of project deliverables depend on   activities in every stage, identification of factors that can affect the quality of deliverables is important for implementing quality management techniques. According to Millar, Oliner and Sichel, (2013) quality of a construction project depends on the raw material. Muturi and Sagwe, (2013) states that lack of supplier’s involvement with project activities can impact on the overall quality.  Lack of skilled members on project team can also reduce quality of the    constructions. Planning and scheduling different tasks in project influences on the successful execution of the tasks. Quality of the project can also be hampered due to lack of proper planning and scheduling.

Factors for defining quality

As new stadium development will be used for arranging different supported and entertainment activities, quality of raw material is important for fulfilling its purpose. Although Brookfield multiplex, a famous constructor is appointed as the project manager, local citizens require being hired for timely completion of the   project. Lack of training among casual staffs can affect    quality of the stadium. Quality of the Air and land can be degraded while undertaking the project. Development of inefficient project policies can affect the quality. Analysis on the   stadium development project indicates that the quality can be affected due to lack of supplier involvement, lack of collaboration among teams, inefficient project policies, lack of   budget,   and absence of quality standards.

According to Pries and Quigley, (2013) use of TQM techniques enables a project team to control quality standards at every stage of project cycle. Randolph, (2014)  states  that implementation of TQM is  effective   for maintaining quality of  construction projects as it ensures that  all stakeholder  are   involved  with the project management  process. Thus fulfilling requirements of customers become easier for the project team.

Figure 1: Elements of TQM in construction projects

TQM implementation process in new stadium development project includes development of policies regarding supplier, training of employees, and communication among teams and deciding methods required for quality measurement. 

Modifying role of management: Scott Howe, (2000) states that effectiveness of TQM techniques depend on the management policies for executing a project.  Quality of the project depends on meeting criteria   of its   stakeholders. Development of project charter can enable the project manager to   understand   scope of the   project (Sherratt, 2014). Development of project charter will also be effective for identifying the risks associated with project. Prediction of the potential risks leads to development of more effective management policies. As the project of developing new stadium in Perth consists of several construction works, the managers can identify subtasks within large construction works.  Use of Work breakdown structure will be effective for identifying the subtasks (Shrestha, Burns and Shields, 2013). As several tasks require being completed within estimated time, the managers of project team can develop milestones for scheduling tasks. Although different teams will be working in the project, communication among members of a project team is an important factor for improving quality of the tasks (Smiley, Fernie and Dainty, 2014). Management of the project can develop communication plans for maintaining collaboration among teams. The project managers also can develop proper reporting structure for monitoring activities related with construction work.

Need for training: Smith, Merna and Jobling, (2013) opined that effectiveness of management policies depends on the process of implementing it. As the proposed design of new stadium is highly complex, skilled   workforce is required for meeting all specifications   of design.  However, the project manager, Brookfield Multiplex requires recruiting temporary staffs for completion of the   project.   The organization can provide training to these staffs to assist them for developing new skills. Stahl, (2013) stated that each construction project is unique as the designs of   different constructions are different.  According to Tao and Tam, (2013) technological requirements for undertaking a construction project varies highly on the design. As   different technologies are used for executing different tasks within a project, training of employees is important for improving their skills.

Need for using quality control techniques in Stadium Development project

Emphasizing on teamwork:  As the time for completing project is short, the project manager can develop separate teams for executing tasks. These teams will be responsible for developing their own goals. Scheduling all tasks of large project can be difficult for a single team (Taylor, 2010). If different teams take the responsibility of scheduling their own duties, chances of completing the project on time will increase (Walter and Styhre, 2013). However the teams require communicating with each other for developing more effective project plans. Engaging different teams to make final plan, enables the project manager to revise these plans (Shrestha, Burns and Shields, 2013). As a result of revising plans for several times, number of flaws reduces. Communication among teams plays an important role for successful completion of the project (Watts, 2013).  The project manager can use reporting structures for supervising the construction activities and monitoring progress in project.

 Although team work   at the first phase of project cycle leads to development of effective plan, it is also required in construction phase also. Lingard and Wakefield (2013) states that construction projects require professionals of different fields for being completed. Collaboration among the teams of different professionals is essential   for fulfilling the requirements of Western Australia Government.

Use of statistical method: According to Kuntjoro, Jumahat and Salleh, (2013) the teams handling large projects may face several difficulties   for   completing the project within time and budget. Analysis on the project of new stadium development in Perth indicates that the tasks relayed with the project are highly complex . In this project statistical methods can be used for solving the problems which are faced by project team while executing the tasks. As stated  by identification  of the  problems  which are  affecting quality  of  a project is necessary  for  developing  quality management  strategies.  Use of statistical methods for identification of the factors which are impacting on the overall quality is more effective than any other methods (Walter and Styhre, 2013). Shrestha, Burns and Shields, (2013) suggest that   use of data   for making decisions  results development of   efficient    decisions.  Lingard and Wakefield, (2013)  also opines that    making decisions on basis of view of   members of the project team can increase risks. Analysis on the project of new Perth Stadium development indicates that the teams can use cause and effect diagrams, histograms and graphs for   identifying the   factors influencing quality of the project. However, use of   statistical methods dose not reduce the importance of contribution of the members in planning and decision making   process.

Feasibility analysis:  Effectiveness of quality management techniques depends on the cost require for implementing the strategy. Goetsch and Davis, (2013) considered that the cost of quality management tools   as the primary parameters for measuring quality of a project. Although  implementation of  quality management  strategies is  important  for meeting customer  requirements,  it also requires being ensured  that  use of these tools are  not  affecting   profitability  of the  project (Shrestha, Burns and Shields, 2013).

Involving supplier with quality management: Relationship among the stakeholders of a project influences quality of the deliverables (Walter and Styhre, 2013). Goetsch and Davis, (2013) state that successful execution of the project depends on involvements of the stakeholders .According to Kuntjoro, Jumahat and Salleh, (2013)    the quality of project delivered by a constructor depends on the   quality of material   and equipments   provided by supplier.()  opines that maintenance of close relationship with suppliers  is  required  for receiving  raw materials  of  high quality at affordable cost. As stated by Lingard and Wakefield (2013) maintaining long term relationship with suppliers enables the constructor to reduce the number of suppliers for getting raw materials. As such relationships are based on mutual trust between the suppliers and constructors; chances for getting materials of lower quality reduce.  Quality of material will impact on the new stadium in Perth also. In this case the  suppliers  which have long term  relationships  with  Brookfield Multiplex  can be  engaged  with the supply  chain  process of the project.  Engaging long term   suppliers of Brookfield can   improve quality of the material. Apart from building close relation with the suppliers, constructors also can request them for implementing TQM processes.

Factors affecting quality

Using ISO standards for quality control: Randolph, (2014) states that the primary objective of implementing quality management techniques in a project to attain satisfaction of all stakeholders. Use of ISO   standards can enable organizations to implement TQM (Lingard and Wakefield, 2013). Engaging ISO registered organizations will also enable the manager of new stadium development project to get materials of high quality.

Involving clients with the project: As stated by Kuntjoro, Jumahat and Salleh, (2013) the trend of engaging clients with TQM processes is becoming more popular. Shrestha, Burns and Shields, (2013) opined that successful implementation of TQM processes requires contribution of all parties associated with it. Involving both internal and external customers with the TQM process enables the project management team to meet their requirements more efficiently (Walter and Styhre, 2013). The government of Western Australia is the final customer of this project. The Government can be engaged with policy development tasks, quality checking process of construction works and raw materials. Involving the Government for quality checking and policy development tasks leads to better fulfillments of client’s requirements.

According to Lingard and Wakefield, (2013) necessity of environmental impact assessments is high for large construction projects as undertaking of these projects impacts severely on the environment. Goetsch and Davis, (2013) stated  that development of large constructions not only  degrades the quality of  land or air these projects also impacts  negatively on the   public health also .   As the   consciousness on environmental degradation is increasing, undertaking project in sustainable manner enables the project manager to attain satisfaction of all customers.   However it is important to implement EIA techniques at all stages of project cycle to minimize the negative impacts of activities  related with project on environment (Kuntjoro, Jumahat and Salleh, 2013). Implementation of EIA can be done in few stages in a project. The project of new stadium development in Perth will be undertaken for long time. Scope of the project includes several construction works. It indicates that development of the new stadium will impact on the land and air quality of the area. As the construction works will take long time   for being completed, undertaking of the project may impact on public heath also.  The construction works may be interrupted at any stage of project if the environmental standards are not   maintained. Implementation of EIA techniques is important to develop proper mitigation strategies (Walter and Styhre, 2013).  Once the impacts are identified, it is important to develop strategies for mitigating the identified impacts of  project.

Figure 2: EIA processes for construction   project

Pre EIA implementation stages:  The pre implementation stages of EIA techniques deals    with screening and scoping of the project (Randolph, 2014). At the screening phase the decision regarding    requirements of EIA is taken. Screening phase of the EIA implementation process in new stadium development will also deal with identification of the approaches used for EIA implementation in the project.  Second stage of the EIA implementation process in new stadium development project in Perth deals with identification of the scopes of the project. The    potential impacts of   a   construction development project can be predicted from the findings of scope analysis (Kuntjoro, Jumahat and Salleh, 2013). Scope analysis of the stadium development project indicates that after  successful, completion, the  project will be able to deliver  a multipurpose stadium,  restaurants ,  entertainment centers  and  transportation  facility .  As the number of construction works is high level of environmental degradation will also be high.  At this stage, the current policies of project development will be revised. According to Randolph, (2014) development identification of alternative project strategies is done on basis of   scope analysis of the project.

Main EIA stages: On completion of tasks related with pre EIA implementation stages, asks       for main phase of EIA implementation process will start.  The main phase of EIA implementation includes development of policies, execution of administration related tasks and development of project description (Walter and Styhre, 2013).  In case of Perth stadium development project, the environmental policies of Australian Government will be revised.  Often the constructors need to obtain permits from Government for undertaking a project.  Perth stadium construction may affect health condition of the area. In the next stages of EIA implementation process, base line data about the   residents of surrounding area   will be   established. Establishment of baseline data is important for analysis the potential impacts   on heath   of local people (Walter and Styhre, 2013). Sixth stage of the EIA implementation in Perth stadium development deals with evaluation of   potential impacts of the project on environment of Perth and other cities.

Post EIA implementation stages: The post EIA implementation stages deal   with   monitoring   the effects   of   project on environment. In this stage the effectiveness   of revised strategies are   analyzed on basis of the results. In case of stadium development project in Perth the effects of the   project will be monitored during construction of the stadium. However the effects will also be monitored while executing the tasks related with secondary construction works.  In main   phase of construction process some parameters regarding environmental impacts of the development project will be set. At post EIA implementation phase these parameters will be periodically measured and will also be compared with the environmental standards. On basis of the findings of this analysis, the strategies of stadium development will be revised.

Tools used for identification, prediction and evaluation of environmental impacts:

Identification

Prediction

Evaluation

Checklists

Checklists

Modeling and simulation

GIS

Impact matrices

Cost  benefit analysis

Impact matrices

Impact networks

Multiple criteria analysis

Impact networks

GIS

GIS

Multiple criteria analysis

Modeling and simulation

Table 1: Tools   used for   identification, prediction and evaluation of environmental impacts

Phases

Steps

Tools

Planning  and identification of impacts

Setting indicators

Developing  aims

GIS

Data base

Expert systems

Prediction and measurement of environmental  impacts

 Assessing  impacts

Analyzing data

Estimation of standards

Data analysis  models

Evaluation of strategies

Normalization of data

Providing rankings

 Analysis of sensitivity

GIS

 

Table 2: Software Tools   used for   identification, prediction and evaluation of environmental impacts

 

Table 1 and 2 reflects the tools used for  measuring environmental  parameters.  The manager of new Stadium project in Perth can use various tools for indentifying the potential impacts of the construction works. The management can use   tools such as impact networks, checklists and impact matrices for forecasting the negative impacts on environment.   The management also can use multiple criteria analysis and statistical tools for measuring the    level of environmental degradation for undertaking the project. The tools  such as impact networks, checklists and impact matrices can also be used for identifying the current   environmental impacts   due to project activities (Randolph, 2014). Prediction of potential impacts of   environmental degradation can also be done using modeling and simulation. Evaluation of the EIA activities is conducted using impact networks, checklists and impact matrices. Cost benefit analysis, multiple criteria analysis and GIS techniques are also used for this purpose (Walter and Styhre, 2013).

Conclusion:

Analysis made in this report indicates that implementation of quality management techniques is essential for new stadium development project in Perth.   The analysis reflects that quality of the deliverables of this project depends on quality of raw material, quality of available equipments and skill of workers. Apart from this, effectiveness of the management policies can be considered as one of the most important factors for improving quality of the deliverables. However, in this project, TQM can be used for improving   quality of the   construction works. Use of TQM  will enable  the project  manager  to conduct  the  tasks  of   each  stage  in the  project life cycle efficiently. Thus the quality of overall project will improve.   The suggested ways of TQM implementation in this project are making project policies by different groups in the   management team, developing project charter for scope identification and development of WBS for identifying subtasks. In this project preparation of communication plan is suggested for improving collaboration among the teams .Analysis made in the project also  reflects that  the  analysis of  risk and factors affecting quality of  deliverables can be  done  by  using  cause and effect matrix. Statistical data can be used for improving the quality of decisions made by managers. However, use of quality management techniques can increase requirements of budget for a project. The cost effectiveness of any TQM strategy requires being analyzed before     implementing within the project. The report also contains discussion on EIA techniques which can be used for   measuring the negative impacts of undertaking construction projects on environment. Discussion made on the EIA techniques in this report indicates that the environmental impacts require being assessed at every stage of project cycle. Environmental standards of Australian Government can be followed to monitor level of environmental degradation due to project activities. Implementation of EIA can be done in few stages in Perth New stadium development project.  The stages are Screening of project, Scoping, Identification of policies and regulation applicable to the project, identification of permits obtained by project Considering EIA laws. The EIA implementation process also deals with providing background information and identification of potential impacts, establishing baseline standards for public health, identification of potential impacts and identification of strategies for   reducing   impacts .The tasks related with  identification , evaluation and prediction of   environmental impacts of  project  activities can be measured  by impact networks, checklists and impact matrices, modeling and simulation, cost benefit analysis, multiple criteria analysis and GIS techniques.

References:

AboMoslim, S. and Russell, A. (2014). Screening design and construction technologies of skyscrapers. Construction Innovation: Information, Process, Management, 14(3), pp.307-345.

Awange, J. (2012). Environmental monitoring using GNSS. New York: Springer.

Boton, C., Kubicki, S. and Halin, G. (2013). Designing adapted visualization for collaborative 4D applications. Automation in Construction, 36, pp.152-167.

Chen, M., Li, Y. and Tu, W. (2013). The Platform Designing of Resources Construction Based on Virtual Synergistic Technology. AMR, 765-767, pp.841-844.

Delaney, J. (2014). Construction program management. Boca Raton, FL: CRC Press.

Douglas, A. (2013). The TQM Journal. Bradford: Emerald Group Publishing Limited.

Gatti, S. (2013). Project finance in theory and practice. [S.l.]: Academic Press.

Ghaffari, A. (2013). Concepts of Risk in Construction Projects. AMR, 684, pp.644-649.

Goetsch, D. and Davis, S. (2013). Quality management for organizational excellence. Boston: Pearson.

Guichard, J. (2013). Une comparaison des apports des modèles de la construction de la carrière et de la construction de soi au life designing counseling. Psychologie Française.

Halwatura, R. and Ranasinghe, N. (2013). Causes of Variation Orders in Road Construction Projects in Sri Lanka. ISRN Construction Engineering, 2013, pp.1-7.

Kuntjoro, W., Jumahat, A. and Salleh, F. (2013). Advances in Manufacturing and Mechanical Engineering. Zurich: Trans Tech Publishers.

Leydecker, S. (2013). Designing Interior Architecture. Basel: De Gruyter.

Li, Y. and Zhang, X. (2013). Web-based construction waste estimation system for building construction projects. Automation in Construction, 35, pp.142-156.

Lingard, H. and Wakefield, R. (2013). A voluntary approach to designing for safer construction. Proceedings of the ICE – Management, Procurement and Law, 166(5), pp.249-259.

Makuch, K. and Pereira, R. (2012). Environmental and energy law. Chichester, U.K.: Wiley Blackwell.

McEwen, A. (2013). Designing the Internet of Things. Wiley.

Millar, J., Oliner, S. and Sichel, D. (2013). Time-to-plan lags for commercial construction projects. Cambridge, Mass.: National Bureau of Economic Research.

Muturi, D. and Sagwe, J. (2013). The TQM Journal. Bradford: Emerald Group Publishing Limited.

Perthstadium.com.au, (2015). The new Perth Stadium. [online] Available at: https://www.perthstadium.com.au/ [Accessed 24 Mar. 2015].

Pries, K. and Quigley, J. (2013). Total quality management for project management. Boca Raton, FL: CRC Press.

Randolph, S. (2014). Maximizing Project Value: A Project Manager’s Guide. Project Management Journal, 45(2), pp.e2-e2.

Scott Howe, A. (2000). Designing for automated construction. Automation in Construction, 9(3), pp.259-276.

Sherratt, F. (2014). Exploring ‘Zero Target’ safety programmes in the UK construction industry. Construction Management and Economics, 32(7-8), pp.737-748.

Shrestha, P., Burns, L. and Shields, D. (2013). Magnitude of Construction Cost and Schedule Overruns in Public Work Projects. Journal of Construction Engineering, 2013, pp.1-9.

Smiley, J., Fernie, S. and Dainty, A. (2014). Understanding construction reform discourses. Construction Management and Economics, 32(7-8), pp.804-815.

Smith, N., Merna, T. and Jobling, P. (2013). Managing Risk in Construction Projects. Hoboken: Wiley.

Stahl, G. (2013). Translating Euclid. [San Rafael, Calif.]: Morgan & Claypool.

Tao, R. and Tam, C. (2013). System reliability theory based multiple-objective optimization model for construction projects. Automation in Construction, 31, pp.54-64.

Taylor, P. (2010). Moodle 1.9 for design and technology. Birmingham, UK: Packt Pub.

Walter, L. and Styhre, A. (2013). The role of organizational objects in construction projects: the case of the collapse and restoration of the Tjörn Bridge. Construction Management and Economics, 31(12), pp.1172-1185.

Watts, A. (2013). Modern Construction Handbook. Berlin: Ambra.

References:

What Will You Get?

We provide professional writing services to help you score straight A’s by submitting custom written assignments that mirror your guidelines.

Premium Quality

Get result-oriented writing and never worry about grades anymore. We follow the highest quality standards to make sure that you get perfect assignments.

Experienced Writers

Our writers have experience in dealing with papers of every educational level. You can surely rely on the expertise of our qualified professionals.

On-Time Delivery

Your deadline is our threshold for success and we take it very seriously. We make sure you receive your papers before your predefined time.

24/7 Customer Support

Someone from our customer support team is always here to respond to your questions. So, hit us up if you have got any ambiguity or concern.

Complete Confidentiality

Sit back and relax while we help you out with writing your papers. We have an ultimate policy for keeping your personal and order-related details a secret.

Authentic Sources

We assure you that your document will be thoroughly checked for plagiarism and grammatical errors as we use highly authentic and licit sources.

Moneyback Guarantee

Still reluctant about placing an order? Our 100% Moneyback Guarantee backs you up on rare occasions where you aren’t satisfied with the writing.

Order Tracking

You don’t have to wait for an update for hours; you can track the progress of your order any time you want. We share the status after each step.

image

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

image

Trusted Partner of 9650+ Students for Writing

From brainstorming your paper's outline to perfecting its grammar, we perform every step carefully to make your paper worthy of A grade.

Preferred Writer

Hire your preferred writer anytime. Simply specify if you want your preferred expert to write your paper and we’ll make that happen.

Grammar Check Report

Get an elaborate and authentic grammar check report with your work to have the grammar goodness sealed in your document.

One Page Summary

You can purchase this feature if you want our writers to sum up your paper in the form of a concise and well-articulated summary.

Plagiarism Report

You don’t have to worry about plagiarism anymore. Get a plagiarism report to certify the uniqueness of your work.

Free Features $66FREE

  • Most Qualified Writer $10FREE
  • Plagiarism Scan Report $10FREE
  • Unlimited Revisions $08FREE
  • Paper Formatting $05FREE
  • Cover Page $05FREE
  • Referencing & Bibliography $10FREE
  • Dedicated User Area $08FREE
  • 24/7 Order Tracking $05FREE
  • Periodic Email Alerts $05FREE
image

Services offered

Join us for the best experience while seeking writing assistance in your college life. A good grade is all you need to boost up your academic excellence and we are all about it.

  • On-time Delivery
  • 24/7 Order Tracking
  • Access to Authentic Sources
Academic Writing

We create perfect papers according to the guidelines.

Professional Editing

We seamlessly edit out errors from your papers.

Thorough Proofreading

We thoroughly read your final draft to identify errors.

image

Delegate Your Challenging Writing Tasks to Experienced Professionals

Work with ultimate peace of mind because we ensure that your academic work is our responsibility and your grades are a top concern for us!

Check Out Our Sample Work

Dedication. Quality. Commitment. Punctuality

Categories
All samples
Essay (any type)
Essay (any type)
The Value of a Nursing Degree
Undergrad. (yrs 3-4)
Nursing
2
View this sample

It May Not Be Much, but It’s Honest Work!

Here is what we have achieved so far. These numbers are evidence that we go the extra mile to make your college journey successful.

0+

Happy Clients

0+

Words Written This Week

0+

Ongoing Orders

0%

Customer Satisfaction Rate
image

Process as Fine as Brewed Coffee

We have the most intuitive and minimalistic process so that you can easily place an order. Just follow a few steps to unlock success.

See How We Helped 9000+ Students Achieve Success

image

We Analyze Your Problem and Offer Customized Writing

We understand your guidelines first before delivering any writing service. You can discuss your writing needs and we will have them evaluated by our dedicated team.

  • Clear elicitation of your requirements.
  • Customized writing as per your needs.

We Mirror Your Guidelines to Deliver Quality Services

We write your papers in a standardized way. We complete your work in such a way that it turns out to be a perfect description of your guidelines.

  • Proactive analysis of your writing.
  • Active communication to understand requirements.
image
image

We Handle Your Writing Tasks to Ensure Excellent Grades

We promise you excellent grades and academic excellence that you always longed for. Our writers stay in touch with you via email.

  • Thorough research and analysis for every order.
  • Deliverance of reliable writing service to improve your grades.
Place an Order Start Chat Now
image

Order your essay today and save 30% with the discount code ESSAYHELP