In order to resolve the issues of traditional data management Swaggies has developed new EDI software for interchanging the confidential information without any kind of error. The overall time and budget needed for the development of EDI system, proper time, key stakeholder and communication plan is required to be adopted by the project executive of the company. In order to install the EDI software for the company, the necessary steps those are needed to be followed are as follows:

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper
  • Understanding the project scope and value of the project plan
  • Extensive research is conducted by the project manager and project team member
  • Tough set of questions should be asked to make the project requirements clearer
  • Gathering software, hardware, physical and security requirements
  • Analyzing the gathered requirements
  • The project plan is outlined by the project manager
  • Discussion among the project manager and project team members
  • The entire project plan should be documented
  • The plan is executed in the teamGantt
  • The final plan is published officially 

In order to accomplish the project successfully, different strategies are required to be adopted. For this particular project the strategies those have been undertaken are as follows:

Accurate project planning: In this phase the project manager should ensure the total budget and time needed to successfully complete the project. With the help of project feasibility study the manager will get to know about the total expenditure and investment needed to be done for the successful implementation of the project. Not only this but also, the other elements those are adopted by the project manager include project objective, scope, assumptions, risk management, approaches and duration as well.

Project work-plan: In this phase the project planning that has been done, are outlined in such way so that project definition can be prepared. In order to manage the project accurately the project manager should provide a work plan to the project manager with step by step instruction. An accurate Work Breakdown Structure (WBS) and Network Diagram (ND) are also developed for creating planning horizon.

Comparison between different EDI software systems: In the initiation phase Swaggies has traditional data management system which is not that much compatible according to the business and project requirements. In order to enhance the level of consumer services for the clients different available EDI systems are compared by the project manager. It is found that with the help of the comparison resultant the effectiveness and efficiency of the system can be measured. In order to gain competitive advantages and high level economic success installation of accurate EDIS software is very much necessary.   

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

In order to accomplish the project both human and physical resources are necessary to be adopted by the project manager. For this particular project the required resources are as follows:

Human resource

Project sponsor

Project administrator

Technical team member

Quality assurance tem member

Finance team member

Physical resource

Equipments

Facility

Expenditure and total funding

Equipments

Gantt chart 

WBS

Task Name

Duration

Start

Finish

Predecessors

Resource Names

Cost

0

Schedule for EDI software adoption

131 days

Sat 9/1/18

Fri 3/1/19

$93,682.00

1

   Project initiation phase

56 days

Sat 9/1/18

Fri 11/16/18

$51,942.00

1.1

      Preparing project proposal

5 days

Sat 9/1/18

Thu 9/6/18

Project manager ,software [1],others [1]

$3,402.00

1.2

      Project proposal for approval

10 days

Fri 9/7/18

Thu 9/20/18

2

quality assurance team ,hardware[1],software [1],technical team

$9,002.00

1.3

      Project team formation and meeting plan development

15 days

Fri 9/21/18

Thu 10/11/18

3

Project manager ,technical team ,software [1]

$16,912.00

1.4

      Software purchase

9 days

Fri 9/21/18

Wed 10/3/18

3

finance team ,project sponsor, software [1]

$7,312.00

1.5

      Research on required hardware

9 days

Fri 10/12/18

Wed 10/24/18

4,5

project sponsor, quality assurance team ,others [1]

$8,010.00

1.6

      Meeting with IT company and development of discussion plan

8 days

Thu 10/25/18

Mon 11/5/18

6,5

others [1],technical team ,hardware[1],software [1]

$4,132.00

1.7

      Project budget planning

9 days

Tue 11/6/18

Fri 11/16/18

7

finance team ,hardware[1],software [1],others [1]

$3,172.00

2

   Milestone 1: Completion of project initiation phase

0 days

Fri 11/16/18

Fri 11/16/18

8

others [0]

$0.00

3

   Project planning phase

43 days

Mon 11/19/18

Wed 1/16/19

$25,412.00

3.1

      Installation of networking throughout warehouse department

6 days

Mon 11/19/18

Mon 11/26/18

9

Project manager ,project sponsor

$6,720.00

3.2

      Software fixing and hardware problem identification

15 days

Tue 11/27/18

Mon 12/17/18

11

technical team

$7,200.00

3.3

      Removing old system and installing new system

12 days

Tue 12/18/18

Wed 1/2/19

11,12

quality assurance team ,hardware[1],others [1],software [1]

$5,092.00

3.4

      Meeting with stakeholders

10 days

Thu 1/3/19

Wed 1/16/19

13,11

Project manager

$6,400.00

4

   Milestone 2: Completion of project planning phase

0 days

Wed 1/16/19

Wed 1/16/19

14

Project manager

$0.00

5

   Project execution phase

23 days

Thu 1/17/19

Mon 2/18/19

$12,676.00

5.1

      Comparison between EDI system

5 days

Thu 1/17/19

Wed 1/23/19

15

technical team ,others [1],software [1]

$2,602.00

5.2

      project outline execution

4 days

Thu 1/24/19

Tue 1/29/19

17

Project manager ,project sponsor

$4,480.00

5.3

      prototype unit testing

2 days

Wed 1/30/19

Thu 1/31/19

18

technical team ,software [1]

$1,072.00

5.4

      prototype integrated testing

3 days

Fri 2/1/19

Tue 2/5/19

19

technical team ,others [1]

$1,530.00

5.5

      Affordability testing of EDI system

9 days

Wed 2/6/19

Mon 2/18/19

20

finance team ,software [1]

$2,992.00

6

   Milestone 3: Completion of project execution phase

0 days

Mon 2/18/19

Mon 2/18/19

21

Project manager

$0.00

7

   Project closure phase

9 days

Tue 2/19/19

Fri 3/1/19

$3,652.00

7.1

      Stakeholder signoff

3 days

Tue 2/19/19

Thu 2/21/19

22

project sponsor

$1,440.00

7.2

      Project documentation

3 days

Fri 2/22/19

Tue 2/26/19

24

Project manager ,others [1],software [1]

$2,122.00

7.3

      Post project maintenance plan

3 days

Wed 2/27/19

Fri 3/1/19

24,25

others [1]

$90.00

8

   Milestone 4: Completion of project closure phase

0 days

Fri 3/1/19

Fri 3/1/19

26

Project manager

$0.00

9

   Milestone 1: Completion of project initiation phase

0 days

Fri 11/16/18

Fri 11/16/18

8

others [0]

$0.00

10

   Milestone 3: Completion of project planning phase

0 days

Wed 1/16/19

Wed 1/16/19

14

Project manager

$0.00

11

   Milestone 3: Completion of project execution phase

0 days

Mon 2/18/19

Mon 2/18/19

21

Project manager

$0.00

12

   Milestone 4: Completion of project closure phase

0 days

Fri 3/1/19

Fri 3/1/19

26

Project manager

$0.00

Development of communication plan

Purpose

Report to

Frequency

Medium

Time duration

Discussion between the project administrator and project team members about the details of software  

Project administrator

Weekly

Face to face meeting., email and PPPT

2 hours

QA team will be reporting to the project manager about the project quality that has to be implemented

Project manager

Daily

Face to face meeting, PPT and emails

1 hour

Technical team members will make discussion about the software details and its implementation plan

Project manager

Daily

Meeting, conferences and PPT, email

2 hour

Project administrator provided the details of EDI software their features and other requirements accurately in the organized meeting

General manager  

Weekly

Meeting, PPT, conferences

1 hour

 Detailed budget plan  

WBS

Task Name

Resource Names

Cost

0

Schedule for EDI software adoption

$93,682.00

1

   Project initiation phase

$51,942.00

1.1

      Preparing project proposal

Project manager ,software [1],others [1]

$3,402.00

1.2

      Project proposal for approval

quality assurance team ,hardware[1],software [1],technical team

$9,002.00

1.3

      Project team formation and meeting plan development

Project manager ,technical team ,software [1]

$16,912.00

1.4

      Software purchase

finance team ,project sponsor, software [1]

$7,312.00

1.5

      Research on required hardware

project sponsor, quality assurance team ,others [1]

$8,010.00

1.6

      Meeting with IT company and development of discussion plan

others [1],technical team ,hardware[1],software [1]

$4,132.00

1.7

      Project budget planning

finance team ,hardware[1],software [1],others [1]

$3,172.00

2

   Milestone 1: Completion of project initiation phase

others [0]

$0.00

3

   Project planning phase

$25,412.00

3.1

      Installation of networking throughout warehouse department

Project manager ,project sponsor

$6,720.00

3.2

      Software fixing and hardware problem identification

technical team

$7,200.00

3.3

      Removing old system and installing new system

quality assurance team ,hardware[1],others [1],software [1]

$5,092.00

3.4

      Meeting with stakeholders

Project manager

$6,400.00

4

   Milestone 2: Completion of project planning phase

Project manager

$0.00

5

   Project execution phase

$12,676.00

5.1

      Comparison between EDI system

technical team ,others [1],software [1]

$2,602.00

5.2

      project outline execution

Project manager ,project sponsor

$4,480.00

5.3

      prototype unit testing

technical team ,software [1]

$1,072.00

5.4

      prototype integrated testing

technical team ,others [1]

$1,530.00

5.5

      Affordability testing of EDI system

finance team ,software [1]

$2,992.00

6

   Milestone 3: Completion of project execution phase

Project manager

$0.00

7

   Project closure phase

$3,652.00

7.1

      Stakeholder signoff

project sponsor

$1,440.00

7.2

      Project documentation

Project manager ,others [1],software [1]

$2,122.00

7.3

      Post project maintenance plan

others [1]

$90.00

8

   Milestone 4: Completion of project closure phase

Project manager

$0.00

9

   Milestone 1: Completion of project initiation phase

others [0]

$0.00

10

   Milestone 3: Completion of project planning phase

Project manager

$0.00

11

   Milestone 3: Completion of project execution phase

Project manager

$0.00

12

   Milestone 4: Completion of project closure phase

Project manager

$0.00

Training and development program: In order to make the project manager familiar to the project details, proper training and development program is needed to be arranged by the project manager for the project team members. It is expected that with the help of the organized training program, the project team member will get to know more about the project requirements and project goal.

Answer

Development of encryption program:  In order to mitigate the issues of data loss it is necessary for the project manager to implement proper security aspects in terms of encryption, firewall and string password. While transferring data, it is necessary for the project manager to keep it within the boundary to avoid data hijacking. In order to maintain data security proper encryption algorithm is required to be adopted.  

Risk transfer strategy: For mitigating the risks fours different strategies are there those are required to be adopted such as accept the risk, avoid the risk, transfer the risk and exploit the risk. However, among these four aspects based on the requirement and project goal proper risk mitigation strategy is needed to be adopted by the project manager and project team members.

Software and hardware testing: In order to ensure that, all the adopted hardware and software are accurate for the EDI system. It is necessary for the project manager to go through both unit and integrated hardware and software testing session. It will help the project manager and project team member about the necessary additional components those should be adopted to get successful revenue.   

The reached milestones those have been recorded in the Gant chart are as follows:

Task Name

Duration

Start

Finish

Resource Names

Milestone 1: Completion of project initiation phase

0 days

Fri 11/16/18

Fri 11/16/18

others [0]

Milestone 3: Completion of project planning phase

0 days

Wed 1/16/19

Wed 1/16/19

Project manager

Milestone 3: Completion of project execution phase

0 days

Mon 2/18/19

Mon 2/18/19

Project manager

Milestone 4: Completion of project closure phase

0 days

Fri 3/1/19

Fri 3/1/19

Project manager

 Actual Vs Budget expenditure to date 

Task Name

Duration

Start

Finish

Cost

Actual Cost

% Work Complete

Schedule for EDI software adoption

131 days

Sat 9/1/18

Fri 3/1/19

$93,682.00

$52,084.19

56%

   Milestone 1: Completion of project initiation phase

0 days

Fri 11/16/18

Fri 11/16/18

$0.00

$0.00

0%

   Milestone 2: Completion of project planning phase

0 days

Wed 1/16/19

Wed 1/16/19

$0.00

$0.00

0%

   Milestone 3: Completion of project execution phase

0 days

Mon 2/18/19

Mon 2/18/19

$0.00

$0.00

0%

   Milestone 1: Completion of project initiation phase

0 days

Fri 11/16/18

Fri 11/16/18

$0.00

$0.00

0%

   Milestone 3: Completion of project planning phase

0 days

Wed 1/16/19

Wed 1/16/19

$0.00

$0.00

0%

   Milestone 3: Completion of project execution phase

0 days

Mon 2/18/19

Mon 2/18/19

$0.00

$0.00

0%

   Milestone 4: Completion of project closure phase

0 days

Fri 3/1/19

Fri 3/1/19

$0.00

$0.00

0%

   Milestone 4: Completion of project closure phase

0 days

Fri 3/1/19

Fri 3/1/19

$0.00

$0.00

20%

   Project closure phase

9 days

Tue 2/19/19

Fri 3/1/19

$3,652.00

$1,061.00

25%

      Stakeholder signoff

3 days

Tue 2/19/19

Thu 2/21/19

$1,440.00

$0.00

0%

      Post project maintenance plan

3 days

Wed 2/27/19

Fri 3/1/19

$90.00

$0.00

0%

      Project documentation

3 days

Fri 2/22/19

Tue 2/26/19

$2,122.00

$1,061.00

50%

   Project execution phase

23 days

Thu 1/17/19

Mon 2/18/19

$12,676.00

$5,184.39

40%

      Comparison between EDI system

5 days

Thu 1/17/19

Wed 1/23/19

$2,602.00

$780.60

30%

      Affordability testing of EDI system

9 days

Wed 2/6/19

Mon 2/18/19

$2,992.00

$897.60

30%

      project outline execution

4 days

Thu 1/24/19

Tue 1/29/19

$4,480.00

$1,792.00

40%

      prototype unit testing

2 days

Wed 1/30/19

Thu 1/31/19

$1,072.00

$643.20

60%

      prototype integrated testing

3 days

Fri 2/1/19

Tue 2/5/19

$1,530.00

$1,070.99

70%

   Project planning phase

43 days

Mon 11/19/18

Wed 1/16/19

$25,412.00

$12,543.20

50%

      Installation of networking throughout warehouse department

6 days

Mon 11/19/18

Mon 11/26/18

$6,720.00

$2,688.00

40%

      Software fixing and hardware problem identification

15 days

Tue 11/27/18

Mon 12/17/18

$7,200.00

$3,600.00

50%

      Meeting with stakeholders

10 days

Thu 1/3/19

Wed 1/16/19

$6,400.00

$3,200.00

50%

      Removing old system and installing new system

12 days

Tue 12/18/18

Wed 1/2/19

$5,092.00

$3,055.20

60%

   Project initiation phase

56 days

Sat 9/1/18

Fri 11/16/18

$51,942.00

$33,295.60

64%

      Project proposal for approval

10 days

Fri 9/7/18

Thu 9/20/18

$9,002.00

$4,501.00

50%

      Meeting with IT company and development of discussion plan

8 days

Thu 10/25/18

Mon 11/5/18

$4,132.00

$2,066.00

50%

      Preparing project proposal

5 days

Sat 9/1/18

Thu 9/6/18

$3,402.00

$2,041.20

60%

      Software purchase

9 days

Fri 9/21/18

Wed 10/3/18

$7,312.00

$4,387.20

60%

      Project team formation and meeting plan development

15 days

Fri 9/21/18

Thu 10/11/18

$16,912.00

$11,838.40

70%

      Research on required hardware

9 days

Fri 10/12/18

Wed 10/24/18

$8,010.00

$5,607.00

70%

      Project budget planning

9 days

Tue 11/6/18

Fri 11/16/18

$3,172.00

$2,854.80

90%

Different reasons are defined for which the project manager has to undertake different action plan. In order to accomplish the project the project managers are require to make certain action plan in the project initiation phase and even after the execution of the project. For this particular project an action plan that has been undertaken is as follows:

  • Identification of tasks
  • Analysis and delegate the tasks
  • Considering standard schemes double checking

On the other hand, there are certain reasons for which during the implementation of the EDI software in Swaggies the project head to take the action plan. The respective reasons for the action plans are as follows:

  • Bring clarity to the vision
  • The ideas should be turned to the reality
  • The project team members were failing to meet their responsibilities rather job roles
  • The project manager failed to track the contribution of the project members properly 

After the identification of the reasons for which the project manager has undertaken certain action plan, the executives have developed an advanced communication plan. It is expected that with the help of this accurate action plan the stakeholders and the project manager will be able to understand about the project goal objectives properly. The purpose of communication and the set of topic those have been discussed in these meetings are as follows:

  • Current status of the project report
  • The basic security aspects to be undertaken to keep the EDI system secured from external attacks
  • The difference between the estimated cost and the actual expenditure
  • The expenditure budget and the actual cost of the project elements
  • Additional time might be required or successful completion of the project

The aim of the project is to install and implement Electronic Data Interchange (EDI) software for Swaggies. The warehouse department of Swaggies does not have proper managerial aspects and due to this reason the company was continuously failing to meet the requirements. In order to resolve this issue, they have thought of installing advanced software to improve their existing customer service. It is expected that with the successful implementation of the project, the company will be able to gain a team of professionally trained staffs. Swaggies will also get economic support and with the time management the rate of staff efficiency will also increase accordingly. In addition to this, Swaggies can gain competitive advantages from the market place with an enhanced customer service management system.

Project Plan

The problems those have been identified by the project manager during the existing data warehouse application are as follows:

  • Failure of the software system
  • Negative response from the staffs
  • The system fails to deliver service to the consumers on time
  • Budget over allocation
  • Inappropriate backup process used by the project manager 

This is one of the most vital parts in project management that helps the project manager to ensure about the project requirements and current status of the project as well. Based on the requirement of the project it has been found that, 6 months are needed to complete the project however, after 3 months the status of the project is also defines that total 60% as to be completed.   

From the detail study of the project it has been learned that only identification of the resources are not enough rather after that both the human resources and physical resources should be analyzed. In addition to this, before initiating the project the feasibility study must be done accordingly so that the project manager get to know about the total expenditure to be achieved. Apart from this, during the project development phase, appropriate time to time progress report is also needed to be developed.

If all the identified steps are maintained accurately then, it can be assumed that the project manager will be able to meet the requirements accordingly. The identified risks will be minimized, the productivity of Swaggies will increase and the other features that the company would be able to get include the following:

  • Data backup, disaster recovery and application resilience are the features those the company will be able to achieve
  • The stock level of the warehouse will enhance to meet the requirements of the consumers
  • In addition to this, with secured on time service the level of customer satisfaction will also increase 

References 

Bresnen, M., 2016. Institutional development, divergence and change in the discipline of project management. International journal of project management, 34(2), pp.328-338.

Fleming, Q.W. and Koppelman, J.M., 2016, December. Earned value project management. Project Management Institute.

Guo, F., Chang-Richards, Y., Wilkinson, S. and Li, T.C., 2014. Effects of project governance structures on the management of risks in major infrastructure projects: A comparative analysis. International Journal of Project Management, 32(5), pp.815-826.

Heldman, K., 2015. PMP project management professional exam deluxe study guide: updated for the 2015 Exam. John Wiley & Sons.

Kerzner, H., 2017. Project management metrics, KPIs, and dashboards: a guide to measuring and monitoring project performance. John Wiley & Sons.

Leach, L.P., 2014. Critical chain project management. Artech House.

Lock, M.D., 2014. The essentials of project management. Ashgate Publishing, Ltd.. Lock, M.D., 2014. The essentials of project management. Ashgate Publishing, Ltd..

Martinelli, R.J. and Milosevic, D.Z., 2016. Project management toolbox: tools and techniques for the practicing project manager. John Wiley & Sons.

Mir, F.A. and Pinnington, A.H., 2014. Exploring the value of project management: linking project management performance and project success. International journal of project management, 32(2), pp.202-217.

Nelson, R.R. and Morris, M.G., 2014. IT Project Estimation: Contemporary Practices and Management Guidelines. MIS Quarterly Executive, 13(1).

Schwalbe, K., 2015. Information technology project management. Cengage Learning.

Snyder, C.S., 2014. A Guide to the Project Management Body of Knowledge: PMBOK (®) Guide. Project Management Institute.

Svejvig, P. and Andersen, P., 2015. Rethinking project management: A structured literature review with a critical look at the brave new world. International Journal of Project Management, 33(2), pp.278-290.

Todorovic, M.L., Petrovic, D.?., Mihic, M.M., Obradovic, V.L. and Bushuyev, S.D., 2015. Project success analysis framework: A knowledge-based approach in project management. International Journal of Project Management, 33(4), pp.772-783.

Too, E.G. and Weaver, P., 2014. The management of project management: A conceptual framework for project governance. International Journal of Project Management, 32(8), pp.1382-1394.

Verzuh, E., 2015. The fast forward MBA in project management. John Wiley & Sons.

Walker, A., 2015. Project management in construction. John Wiley & Sons.

Weiss, J., Newell, S. and Swan, J., 2017, January. Introduction to IT and project management minitrack. In Proceedings of the 50th Hawaii International Conference on System Sciences.

What Will You Get?

We provide professional writing services to help you score straight A’s by submitting custom written assignments that mirror your guidelines.

Premium Quality

Get result-oriented writing and never worry about grades anymore. We follow the highest quality standards to make sure that you get perfect assignments.

Experienced Writers

Our writers have experience in dealing with papers of every educational level. You can surely rely on the expertise of our qualified professionals.

On-Time Delivery

Your deadline is our threshold for success and we take it very seriously. We make sure you receive your papers before your predefined time.

24/7 Customer Support

Someone from our customer support team is always here to respond to your questions. So, hit us up if you have got any ambiguity or concern.

Complete Confidentiality

Sit back and relax while we help you out with writing your papers. We have an ultimate policy for keeping your personal and order-related details a secret.

Authentic Sources

We assure you that your document will be thoroughly checked for plagiarism and grammatical errors as we use highly authentic and licit sources.

Moneyback Guarantee

Still reluctant about placing an order? Our 100% Moneyback Guarantee backs you up on rare occasions where you aren’t satisfied with the writing.

Order Tracking

You don’t have to wait for an update for hours; you can track the progress of your order any time you want. We share the status after each step.

image

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

image

Trusted Partner of 9650+ Students for Writing

From brainstorming your paper's outline to perfecting its grammar, we perform every step carefully to make your paper worthy of A grade.

Preferred Writer

Hire your preferred writer anytime. Simply specify if you want your preferred expert to write your paper and we’ll make that happen.

Grammar Check Report

Get an elaborate and authentic grammar check report with your work to have the grammar goodness sealed in your document.

One Page Summary

You can purchase this feature if you want our writers to sum up your paper in the form of a concise and well-articulated summary.

Plagiarism Report

You don’t have to worry about plagiarism anymore. Get a plagiarism report to certify the uniqueness of your work.

Free Features $66FREE

  • Most Qualified Writer $10FREE
  • Plagiarism Scan Report $10FREE
  • Unlimited Revisions $08FREE
  • Paper Formatting $05FREE
  • Cover Page $05FREE
  • Referencing & Bibliography $10FREE
  • Dedicated User Area $08FREE
  • 24/7 Order Tracking $05FREE
  • Periodic Email Alerts $05FREE
image

Services offered

Join us for the best experience while seeking writing assistance in your college life. A good grade is all you need to boost up your academic excellence and we are all about it.

  • On-time Delivery
  • 24/7 Order Tracking
  • Access to Authentic Sources
Academic Writing

We create perfect papers according to the guidelines.

Professional Editing

We seamlessly edit out errors from your papers.

Thorough Proofreading

We thoroughly read your final draft to identify errors.

image

Delegate Your Challenging Writing Tasks to Experienced Professionals

Work with ultimate peace of mind because we ensure that your academic work is our responsibility and your grades are a top concern for us!

Check Out Our Sample Work

Dedication. Quality. Commitment. Punctuality

Categories
All samples
Essay (any type)
Essay (any type)
The Value of a Nursing Degree
Undergrad. (yrs 3-4)
Nursing
2
View this sample

It May Not Be Much, but It’s Honest Work!

Here is what we have achieved so far. These numbers are evidence that we go the extra mile to make your college journey successful.

0+

Happy Clients

0+

Words Written This Week

0+

Ongoing Orders

0%

Customer Satisfaction Rate
image

Process as Fine as Brewed Coffee

We have the most intuitive and minimalistic process so that you can easily place an order. Just follow a few steps to unlock success.

See How We Helped 9000+ Students Achieve Success

image

We Analyze Your Problem and Offer Customized Writing

We understand your guidelines first before delivering any writing service. You can discuss your writing needs and we will have them evaluated by our dedicated team.

  • Clear elicitation of your requirements.
  • Customized writing as per your needs.

We Mirror Your Guidelines to Deliver Quality Services

We write your papers in a standardized way. We complete your work in such a way that it turns out to be a perfect description of your guidelines.

  • Proactive analysis of your writing.
  • Active communication to understand requirements.
image
image

We Handle Your Writing Tasks to Ensure Excellent Grades

We promise you excellent grades and academic excellence that you always longed for. Our writers stay in touch with you via email.

  • Thorough research and analysis for every order.
  • Deliverance of reliable writing service to improve your grades.
Place an Order Start Chat Now
image

Order your essay today and save 30% with the discount code ESSAYHELP