Project Management On RALS Rostering Project For Globex B T And Sons

MOV (Measurable Organizational Value) of the Development Project

Discuss about the Project Management on RALS Rostering Project for Globex B T and Sons.

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

Prior to the establishment of the Globex B T and Sons started the Annual Riverina Agricultural and Lifestyle show in the year of 2000. The entire set up of the show was dependent on the volunteers of the show, this was making the entire system less effective and the popularity of the show was getting diminished. The show presented the local products of the farmers, various life styles of the local business holders as well as promotes the agricultural equipments in front of their concerned customers and audiences. The volunteers of the show maintain the entire management system of the show: sales of the ticket, cleanliness of the platform of performance, information collection, collection of sponsors etc.

This report is proposing a Rostering project for RALS in order to resolve the problems raised due to the dependency on the volunteers within RALS. This rostering system was able to manage all the specific tasks that were performed by a group of volunteer within RALS. Selling of tickets, arrangement of the sponsors, managing individual events can be easily managed by the RALS. This project needs a structured plan with a proper scope related to it. All technological resources and equipments required for this project are being elaborate in this project. In addition to this risk assessment is also being discussed with a proper risk resolving technique.

The specific aim of this project is to provide a Rostering system to RALS for avoiding the dependency on the volunteers. This aspect involves so many measurable organizational values within this project. These measurable organizational values are customer, Financial details, Operational Performance, Social aspect and strategies applied in this project. in addition to this the stakeholder also add great value to this project as the measurable organizational value. Following tables elaborates the details of these MOVs in RALS.

The MOV process within RALS involves the following steps to be followed:

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

Steps

Detailed Process

Step 1

Recognition of the areas that provides more impact in the project

Step 2

Analysis of the expenditure

Step 3

Proper metric development for Rostering system 

Step 4

Estimation of the time schedule

Step 5

Authentication of the agreements by involvement of the stakeholders

Step 6

Evaluation of the  valuable core areas of the project

According to the above mentioned process RALS has to consider several impactful areas that will be beneficial for their rostering system.

Areas to be focused

Impact of the focused areas

Rating of focused areas

Time required

Metrics

Visitor

Visitors are the main part of the show and they will be served well by the volunteers according to their demands

1

3 months

Visitors are the core attribute of the show, therefore proper training of the volunteer will results into the availability of the visitors

Strategies

Strategic plan involved in the rostering system allows the management system of RALS to capture more revenues from the market

2

4 months

Strategic plan will help to develop the efficiency of the RALS by 14%

Operations

Operations should be developed in order to maintain the development of RALS.

3

2months

This aspect leads to the time saving and cost effectiveness of the system

Social

The communication between the clients and authority of RALS create a good social structure of the system.

4

5 months

Reduce the inefficient nature of the manual system while considering the delivery of the service

Financial Impact

People with right skills will increase the cost saving.

5

7 months

Development of the system will reduce extra expense by 40%

Value delivered by the system is considered by evaluating the impact of the stakeholders with respect to the ranking of the measureable organizational values. Measurable Organizational Value of the stakeholders can be elaborated with the help of the stakeholder matrix. In addition to this ranking of the valuable areas of the system can be described by focusing on the impacts of these valuable areas.

Stakeholders

Interest

Domain of Interest

Higher Management Team of Globex

This team is always active to deliver the efficient and proper service to the clients of RALS

Superior system, cost estimation

Management authority of RALS

Risk management and providing efficient service to the clients

Cost effectiveness and superior system

Volunteers of RALS

Provide guidance to the clients and manages all events

Improvement in service and fast service

Employees of RALS

Maintenance of the platform of RALS and keeps the efficiency high of RALS.

Fast service and superior performance

Valuable areas

Rating according to measurable organizational value

Visitors

Superior, Cheaper , faster service should be provided

Financial

Superior and cost effective features should be adopted

Operational

Superior, faster and improvement should be there in operational aspect

Social

Superior and improvement should be followed by RALS

Strategy

Improvement should be there in strategic thinking

Values Delivered by the Proposed System

The scope of the project is to capture the information from the volunteers and improvise the system management of RALS. Security of this information should be a matter of concern. All the information shared between the management and clients of RALS should be kept private. In addition to this all the manual transaction and other detailed information system should be replaced by cloud base or any kind of web based applications in order to resolve the inefficient nature of the conventional system. Interfaces should be there in between the management and clients in order to avoid conflicts. The entire system must be designed in the manner that the all the requirements from the clients can be resolved. Technological development requires the configured devices in the project. System documentation and training are two other important scope of this project that will provide the effective feature to the project.

Rostering system proposed for RALS is on web based or more specifically a cloud based system. Therefore any kind of cloud or web based system requires proper software and hardware set up to be present within the project in order to have a structured way of managing the project. Generally, for the project management purpose there are several specific technologies available, these technologies are UML project, Database tools for arranging the project elements in a integrative way and innovative programming languages. All of these above-mentioned technological tools should be present in the project in order to have accurate results. In addition to this, Grant chart, Pert charts are another important aspects that are helpful in developing the project. Networking devices are also helpful while considering the improvised system set up of the system.

Roles and responsibilities of the developers in this project are explained as follows:

Roles of the Developers

Responsibilities of the Developers

Project Manager

The duty or responsibility of the project manager is to maintain the entire project in a structured way and obtained desired results with the help of the strategic planning for a rostering system.

Project Sponsor

Sponsors of the project are responsible for generating and collecting funds for the development of the project.

Project Scheduler

Project scheduler is one of the most important parts of any project. They generate the entire plan for the project in order to have the structured performance.

Risk Manager

Risk manager play the role of identifying the risk factors involved in the project and finds the mitigating process concerned with that particular risk.

Designer

Designers arrange all the tasks in a scheduled way so that the arrangement of the task will attract the customers and will result into a high quality of performance.

Analyst

The duty of the analyst is to collect the available resources in the project while considering the project resources. They arrange the resources according to the raised demands of the project.

Business Consultant

The core responsibility of the business consultant is to provide advice to the management authority of RALS in order to resolve the functional disorder within RALS as well as to find mitigating techniques of the Concerned risk factors.

Financial Manager

Financial manager of the concerned RALS arranges all the detailed information about the expenses involved within the project and also try to reduce the extra expenses involved within the project.

Rostering system is one automated and web based application. This aspect introduces the fact that users of this system as well as the operating heads of this system needs proper and effective training in order to have clear point of view about the system base and structure. Web based applications involves so many networking, technical elements within the project. The functionality of each element should be clear to the each member of RALS. The entire system should not involve more than 30 user as this will introduce more queries from each users and will increase the time span of the processing. Clients will get delayed results due to this structure. Therefore, less number of members in the group will result into effective training process.  

Task Name

Duration

Start

Finish

Predecessors

Resource Names

Rostering Systemm for RALS

445 days

Fri 9/23/16

Thu 6/7/18

   

   Determination of Specification

52 days

Fri 9/23/16

Mon 12/5/16

   

      Feasibility Study of the Conventional System

20 days

Fri 9/23/16

Thu 10/20/16

 

Project manager,Requirement analyst,Developer,Risk manager

      Business Requirements Identification

15 days

Fri 10/21/16

Thu 11/10/16

2

Requirement analyst,Executive sponsor

      SRS Documentation

9 days

Fri 11/11/16

Wed 11/23/16

2,3

Project manager,Requirement analyst,Developer,Risk manager

      Arrangement of Meeting with Visitors and Members

8 days

Thu 11/24/16

Mon 12/5/16

4

Project manager,Developer

   Development and Selection Team

78 days

Tue 12/6/16

Thu 3/23/17

   

      Vendor Selection for Development

30 days

Tue 12/6/16

Mon 1/16/17

5

Accountant,Project manager,Executive sponsor,Requirement analyst,Risk manager

      Analysis of the Development History of the Vendors

20 days

Tue 1/17/17

Mon 2/13/17

5,7

Executive sponsor,Requirement analyst,Risk manager

      Development Task Scheduling

8 days

Tue 2/14/17

Thu 2/23/17

8

Developer,Project manager,System analyst

      Budget Plan for Development

20 days

Fri 2/24/17

Thu 3/23/17

7,9

Accountant,Executive sponsor,Project manager,Requirement analyst,Risk manager

   Phase of the Design

195 days

Fri 9/23/16

Thu 6/22/17

   

      Improvement of Voluteer Management Module

50 days

Fri 3/24/17

Thu 6/1/17

10

Developer,Project manager,Executive sponsor,Requirement analyst,Risk manager

      Developing the First Prototype

30 days

Fri 3/24/17

Thu 5/4/17

9,10

Developer,System analyst

      Improving the Installation of the New System

20 days

Fri 9/23/16

Thu 10/20/16

 

Developer,Project manager,Risk manager,System analyst

      Setermination of the System Requirements

15 days

Fri 6/2/17

Thu 6/22/17

12,14

Project manager,System analyst,Developer,Requirement analyst

   Milestone: Design Stage Completion

0 days

Fri 9/23/16

Fri 9/23/16

   

   Implementation Phase of the System at Organizational Level

250 days

Fri 6/23/17

Thu 6/7/18

   

      Business Objectives Implementation

30 days

Fri 6/23/17

Thu 8/3/17

15

Developer,Requirement analyst,Executive sponsor,Risk manager

      Requirements for the First Built of the System

20 days

Fri 8/4/17

Thu 8/31/17

14,18

Developer,Project manager,Executive sponsor,Requirement analyst,Risk manager

      Acquisition of the Hardware and Sooftware set ups

200 days

Fri 9/1/17

Thu 6/7/18

19,12

Accountant,Project manager,System analyst,Developer,Executive sponsor

   Testing Stage

39 days

Fri 9/1/17

Wed 10/25/17

   

      Detemination of the Test Plan for the Test Cases

8 days

Fri 9/1/17

Tue 9/12/17

19

Tester,Developer,System analyst

      Testing of the Prototype

20 days

Wed 9/13/17

Tue 10/10/17

22

Developer,Tester,Executive sponsor,Requirement analyst

      Analysis of the Data Collected

7 days

Wed 10/11/17

Thu 10/19/17

18,23

Executive sponsor,Project manager,Requirement analyst,Risk manager

      Result Presentation of the Management of RALS

4 days

Fri 10/20/17

Wed 10/25/17

22,24

Project manager,Developer,Executive sponsor

   Milestone: Accepting the Test Results by Clients

0 days

Fri 9/23/16

Fri 9/23/16

   

   Risk Management Phase

33 days

Thu 10/26/17

Mon 12/11/17

   

      Identification of the Risks in Rostering System

20 days

Thu 10/26/17

Wed 11/22/17

25

Project manager,Risk manager,Developer,Executive sponsor

      Impact Analysis of the Risks

5 days

Thu 11/23/17

Wed 11/29/17

24,28

Risk manager,Project manager,Requirement analyst

      Mitigation Policies of the Risks

9 days

Thu 11/23/17

Tue 12/5/17

28

Project manager,System analyst,Risk manager

      Registration of the Impacts of the Risks

8 days

Thu 11/30/17

Mon 12/11/17

29

Project manager,Risk manager,Executive sponsor,Requirement analyst

   Milestone: Accepetance of risk Document Prsented by Client

0 days

Fri 9/23/16

Fri 9/23/16

   

   Closure of the project

29 days

Tue 12/12/17

Fri 1/19/18

   

       Evaluation of the functionality of the rostering system

9 days

Tue 12/12/17

Fri 12/22/17

31

Executive sponsor,Project manager,Requirement analyst,Risk manager

      Rolling Out of the Final Product

20 days

Mon 12/25/17

Fri 1/19/18

31,34

Project manager,Requirement analyst,Risk manager

Stakeholder Matrix

Figure 1: Work Break Down Structure

(Source: Created by author)

Risk assessment is a crucial aspect involved within a project. There are several aspects that create malfunctioning disorders and hamper the growth of the project. This aspect involves disruptions within the project. Therefore, in order to resolve these risk factors it is important to identify the risks and their associated mitigation techniques.

Indentified risk factors

Members involved in the risks

Details

Measure of Risks

Likelihood (L)

1,2,3

Severity (S)

1,2,3

Ranking (L*S)

Technological Risks

Project Head

There  are some kind of technical failures that leads to network issues and other system errors

2

2

4

Economic Risks

Financial Manager

There are some extra expenses involved within the system that introduces several financial crises within the project.

3

2

6

Lack of Resources

Project Manager

A project requires a list of resources that becomes mandatory to the system set up. If these are not present within the project it blocks the growth of the project.  

3

2

6

Loss of Manpower

Project Manager

Lack of work force reduces the effectiveness of the project.

2

3

6

Risk in Privacy

Project Manger

The data shared between the volunteer and authority should have to be secured enough in order to have an effective result from the project.

2

2

4

Identified Risks

Mitigation techniques of the Risks

Technological Risks

Accurate monitoring system of the servers and other technical tools can easily resolve the risks associated with that. At a regular interval of time proper maintenance system can resolve these issues.

Economic Risks

Some financial back should always be there for adjusting the emergency economic disasters.

Lack of Resources

Identification of the elements not present in the project can mitigate the problems related to lack of resources.

Loss of Manpower

Work force support should always be present in the project management team as it will support the entire system at the time of crisis.

Risk in Privacy

Private data collected from the communication measures between the authority, clients and volunteers can be kept private by using proper technological tools.

Project Name:

Project Manager Name:

Type

Reason

Time Taken

Owner

Method

Status

Approval expense

One single source should be there for managing all the expenses related to the project. Otherwise there will be misuse of money.

1 months

Financial manager

Expense involve in the management

Open

Documentation of project

Regular documentation of the project should be there within the project management.

2 months

Project manager

Project growth monitoring

Closed

Work Break Down Structure (WBS)

WBS identifies the individual task to be done and responsible heads for those.

5 months

Project manager

Inspirational guidance to the project development team

Open

Project Planning

According to the demands of the project as well as clients, the plan of project should be scheduled.

3 months

Project manager

Project monitoring

Closed

Plan associated with risk

Risks must be identified at the first stage of the risk assessment and then those must be mitigated.

2 months

Risk manager, project manager

Review of the project details

Open

Measureable Organizational Values

The impacts of the stakeholders are identified with respect to these characteristics.

1 month

Project manager

Observation

Closed

Training Materials 

Training materials identifies the specified details about the training.

3 months

Project manager

Presentations and journals

open

Conclusion

This can be concluded that RALS is developing a project that will help the show for implementing a new rostering system within the system. RALS want to implement a new rostering system that will reduce the dependency on the volunteers. This will make the entire system automated with respect to the conventional rostering system. This system implementation requires the set of project planning with respect to the scope and risk associated measures for the entire system. This report has explained all the scopes and objectives of this project. In addition to this, risk factors associated with this project are elaborated with the resolution techniques of those risks. These risks have involved some responsible individuals. The roles of these individuals are also explained in this report. The WBS structure is explaining the details task structure of the project.

Ahlemann, F., El Arbi, F., Kaiser, M. G., & Heck, A. (2013). A process framework for theoretically grounded prescriptive research in the project management field. International Journal of Project Management, 31(1), 43-56.

Besner, C., & Hobbs, B. (2013). Contextualized project management practice: A cluster analysis of practices and best practices. Project Management Journal, 44(1), 17-34.

Caniëls, M. C., & Bakens, R. J. (2012). The effects of Project Management Information Systems on decision making in a multi project environment.International Journal of Project Management, 30(2), 162-175.

Díez Rodríguez, J. J., Oliver, C., Vicente, L., & Ahumada Cervantes, B. (2015). Addressing strategic environmental assessment of Mexico’s transition towards renewable energy. In AEIPRO 2015: International Congress on Project Engineering (pp. 1121-1132).

Garel, G. (2013). A history of project management models: From pre-models to the standard models. International Journal of Project Management, 31(5), 663-669.

Hornstein, H. A. (2015). The integration of project management and organizational change management is now a necessity. International Journal of Project Management, 33(2), 291-298.

Joslin, R., & Müller, R. (2015). Relationships between a project management methodology and project success in different project governance contexts.International Journal of Project Management, 33(6), 1377-1392.

Marcelino-Sádaba, S., Pérez-Ezcurdia, A., Lazcano, A. M. E., & Villanueva, P. (2014). Project risk management methodology for small firms.International Journal of Project Management, 32(2), 327-340.

Müller, R., Glückler, J., & Aubry, M. (2013). A relational typology of project management offices. Project Management Journal, 44(1), 59-76.

Müller, R., Glückler, J., Aubry, M., & Shao, J. (2013). Project management knowledge flows in networks of project managers and project management offices: A case study in the pharmaceutical industry. Project Management Journal, 44(2), 4-19.

Pitsis, T. S., Sankaran, S., Gudergan, S., & Clegg, S. R. (2014). Governing projects under complexity: theory and practice in project management.International Journal of Project Management, 32(8), 1285-1290.

Rees-Caldwell, K., & Pinnington, A. H. (2013). National culture differences in project management: Comparing British and Arab project managers’ perceptions of different planning areas. International Journal of Project Management, 31(2), 212-227.

Serra, C. E. M., & Kunc, M. (2015). Benefits Realisation Management and its influence on project success and on the execution of business strategies.International Journal of Project Management, 33(1), 53-66.

Svejvig, P., & Andersen, P. (2015). Rethinking project management: A structured literature review with a critical look at the brave new world.International Journal of Project Management, 33(2), 278-290.

Teller, J., & Kock, A. (2013). An empirical investigation on how portfolio risk management influences project portfolio success. International Journal of Project Management, 31(6), 817-829.

Teller, J., Unger, B. N., Kock, A., & Gemünden, H. G. (2012). Formalization of project portfolio management: The moderating role of project portfolio complexity. International Journal of Project Management, 30(5), 596-607.

What Will You Get?

We provide professional writing services to help you score straight A’s by submitting custom written assignments that mirror your guidelines.

Premium Quality

Get result-oriented writing and never worry about grades anymore. We follow the highest quality standards to make sure that you get perfect assignments.

Experienced Writers

Our writers have experience in dealing with papers of every educational level. You can surely rely on the expertise of our qualified professionals.

On-Time Delivery

Your deadline is our threshold for success and we take it very seriously. We make sure you receive your papers before your predefined time.

24/7 Customer Support

Someone from our customer support team is always here to respond to your questions. So, hit us up if you have got any ambiguity or concern.

Complete Confidentiality

Sit back and relax while we help you out with writing your papers. We have an ultimate policy for keeping your personal and order-related details a secret.

Authentic Sources

We assure you that your document will be thoroughly checked for plagiarism and grammatical errors as we use highly authentic and licit sources.

Moneyback Guarantee

Still reluctant about placing an order? Our 100% Moneyback Guarantee backs you up on rare occasions where you aren’t satisfied with the writing.

Order Tracking

You don’t have to wait for an update for hours; you can track the progress of your order any time you want. We share the status after each step.

image

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

image

Trusted Partner of 9650+ Students for Writing

From brainstorming your paper's outline to perfecting its grammar, we perform every step carefully to make your paper worthy of A grade.

Preferred Writer

Hire your preferred writer anytime. Simply specify if you want your preferred expert to write your paper and we’ll make that happen.

Grammar Check Report

Get an elaborate and authentic grammar check report with your work to have the grammar goodness sealed in your document.

One Page Summary

You can purchase this feature if you want our writers to sum up your paper in the form of a concise and well-articulated summary.

Plagiarism Report

You don’t have to worry about plagiarism anymore. Get a plagiarism report to certify the uniqueness of your work.

Free Features $66FREE

  • Most Qualified Writer $10FREE
  • Plagiarism Scan Report $10FREE
  • Unlimited Revisions $08FREE
  • Paper Formatting $05FREE
  • Cover Page $05FREE
  • Referencing & Bibliography $10FREE
  • Dedicated User Area $08FREE
  • 24/7 Order Tracking $05FREE
  • Periodic Email Alerts $05FREE
image

Services offered

Join us for the best experience while seeking writing assistance in your college life. A good grade is all you need to boost up your academic excellence and we are all about it.

  • On-time Delivery
  • 24/7 Order Tracking
  • Access to Authentic Sources
Academic Writing

We create perfect papers according to the guidelines.

Professional Editing

We seamlessly edit out errors from your papers.

Thorough Proofreading

We thoroughly read your final draft to identify errors.

image

Delegate Your Challenging Writing Tasks to Experienced Professionals

Work with ultimate peace of mind because we ensure that your academic work is our responsibility and your grades are a top concern for us!

Check Out Our Sample Work

Dedication. Quality. Commitment. Punctuality

Categories
All samples
Essay (any type)
Essay (any type)
The Value of a Nursing Degree
Undergrad. (yrs 3-4)
Nursing
2
View this sample

It May Not Be Much, but It’s Honest Work!

Here is what we have achieved so far. These numbers are evidence that we go the extra mile to make your college journey successful.

0+

Happy Clients

0+

Words Written This Week

0+

Ongoing Orders

0%

Customer Satisfaction Rate
image

Process as Fine as Brewed Coffee

We have the most intuitive and minimalistic process so that you can easily place an order. Just follow a few steps to unlock success.

See How We Helped 9000+ Students Achieve Success

image

We Analyze Your Problem and Offer Customized Writing

We understand your guidelines first before delivering any writing service. You can discuss your writing needs and we will have them evaluated by our dedicated team.

  • Clear elicitation of your requirements.
  • Customized writing as per your needs.

We Mirror Your Guidelines to Deliver Quality Services

We write your papers in a standardized way. We complete your work in such a way that it turns out to be a perfect description of your guidelines.

  • Proactive analysis of your writing.
  • Active communication to understand requirements.
image
image

We Handle Your Writing Tasks to Ensure Excellent Grades

We promise you excellent grades and academic excellence that you always longed for. Our writers stay in touch with you via email.

  • Thorough research and analysis for every order.
  • Deliverance of reliable writing service to improve your grades.
Place an Order Start Chat Now
image