Project Charter For Capacity Development Of OXFAM

Introduction to the Capacity Development of OXFAM Project

The following is a project charter document made for analyzing the various project management aspects of the project of Capacity Development for OXFAM. The project is developed for increasing the overall proficiency of OXFAM for carrying out their non-profitable projects and goals. The advancement of the technology would allow OXFAM for carrying out their activities in Global Scale and provide effective development of the operations. The following report would provide an analysis of project background, purpose, description, project team, stakeholder groups, project scope, project deliverables planned, summary level schedule, detailed schedule, project budget, project assumptions, and project risks. The task is produced for expanding the general capability of OXFAM for completing their non-gainful undertakings and objectives. The progression of the innovation would permit OXFAM for doing their exercises in Global Scale and give compelling improvement of the operations. The accompanying report would give an investigation of task foundation, reason, portrayal, project group, partner gatherings, project scope, project expectations arranged, synopsis level calendar, nifty gritty timetable, project spending plan, project suspicions, and undertaking dangers. The project charter document is an initial documentation that is made for developing the improved functional operations. The analysis for the development of the charter document is basic objective and project goal analysis. The charter comprises of the project background, purpose, stakeholders, deliverables, and other crucial factors.

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

OXFAM is a non-profitable organization that supports equality and fight against injustice and poverty. They want to expand their reach among people for gaining more support in their good causes. The development of their organization and increase of their capability can be achieved by imparting the use of project management concepts and deliverables. The implication of the project operations would allow them to make some strategies and develop effective operations and development. They need to extend their scope among individuals for increasing more help in their great aims. The improvement of their association and increment of their capacity can be accomplished by giving the utilization of project administration ideas and expectations. The ramifications of the undertaking operations would enable them to make a few methodologies and create viable operations and advancement. The implication of the improved services would enable the deployment of the operations that are capable for the adjustment of the prior services that would help the organization to form the improved operations. Moreover, it would also provide the scope for the modification of the functions of the organization with the help of technology development so that the organization would get the effective and improved operations for the development of fictions.

Project Objective and Scope

The project is developed for increasing the overall proficiency of OXFAM for carrying out their non-profitable projects and goals.  They want to expand their reach among people for gaining more support in their good causes by the development of their organization and increase of their capability. The task is produced for expanding the general capability of OXFAM for doing their non-gainful activities and objectives. They need to grow their range among individuals for increasing more help in their great purposes by the improvement of their association and increment of their ability. The purposes of the project of Capacity Development for OXFAM are,

  • To increase the operational and human force capacity for the OXAM organization
  • To deploy new strategies and system for managing their increased operational scale
  • To develop effective project plan for implementing the new system for the development of the operations
  • To complete the overall project in the budget of £65000.00 and time duration of four months

The project would comprise of exploiting technology and project management principles for developing improved operations and form the alignment of the system integrated development. The organization of OXFAM would form the system for ensuring their operations and activities are increased. The capability of managing large scale of operations would be increased in OXFAM so that they can expand their area of working and form effective and improved functions. They would consider more non-profitable initiatives and align them to their ongoing agendas. The deployment of the improved system would help in forming the improved services for the people related to OXFAM as the information and data would be managed easily.

The project is carried on by OXFAM for developing more effective and improved operation for the organization. The organization has been planning to expand their operations and form the improved development of operations. However, they require some modification in their existing facility for imparting the improved operations. The project would be carried out in four stages following the Agile Structure. The first stage is initialization that consists of requirement analysis, development of initial documentation, environmental assessment, and SWOT analysis of the capacity development. The second stage is planning that consists of review of the mission statement, strategic issues analysis, plan development, plan review, and plan approval. The third stage is strategy and system development that consists of strategy implementation, conduct external analysis, conduct internal analysis, development of strategies, strategic goals and objectives alignment, action plan development, system implementation, hardware and software consideration, system designing, system prototyping, system development, and system testing. The fourth stage is monitoring, review, and closure that consists of strategy review process, system review process, alterations are done, final documentation, and project is closed.

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

The OXAM follows the UK guidelines for non-profitable organizations and develop strategies by aligning to the norms and rules. UK has set some specific guidelines that would form the operations for both the non profitable and profitable organizations. The guidelines for the development of the analysis would allow the fictional and non-fictional planning activities for the achievement of the real time objectives of the organization. The deployment of the system would allow the formation of the improved services and the development would form the system integration and management. It is also possible for the management of the sustainable system development.

Project Stages and Guidelines

The PMBOK and Prince2 project management documents serve the purpose of strategy development documents. The Prince2 strategy is aligned for the management of the activities. The Prince2 strategy would be aligned with the development of the improved project management principles and operations. The management of the profound development would integration of the activities. The PMBOK also comprises of many improved and effective operational development methods. The plan development methodology, system deployment alignment, operational management, and risk management planning are all a part of the PMBOK. The Initiation documentation, charter documentation, and risk management documents are all a part of the project documentation.

Information system development and Strategy deployment projects can be useful for forming this project. The development of thee information system would comprise of specific use of the information system development life cycle. The activities of the project would align to the modification of the operations. It is very important for the alignment of the specific modification and alignment of the operations. The information system development and alignment would help in forming the improved functional development. The information system development would help in overcoming the implementation of the activities so that improved operations would be aligned. The implementation of the information system would allow the formation of the improved system development.

Various Principles and Strategies of Project management can be understood by this project completion. The principles and strategies are helpful for overcoming the activities and the formation of the improved functional development. The implication of the strategies would allow the deployment of the operations. The principle alignment and development has been carried on for forming the specific operational development of the activities. The formation of the activities would also allow the integration of the smart operations. The alignment of the activities would help the business organization for aligning the system deployment and management. The modification of the activities would also allow the formation of the support for the strategy deployment.

Role

Name

Title

Phone

Requirement analysis, SWOT analysis of the capacity development, strategic issues analysis, conduct external analysis, and conduct internal analysis

Katherine Joseph

Analyst

+44-XXXX-XXXX

Development of initial documentation and final documentation

John Kent

Documenter

+44-XXXX-XXXX

Environmental Assessment

Amanda Lee

Environmentalist

+44-XXXX-XXXX

Review of the mission statement, plan approval, and project is closed

<<name of the student>>

Project Manager

+44-XXXX-XXXX

Plan development and plan review

Katie McCoy

Planner

+44-XXXX-XXXX

Development of strategies, strategic goals and objectives alignment, action plan development, strategy review process, and alterations are done

Leonard Jones

Strategist

+44-XXXX-XXXX

Hardware and software consideration, system prototyping, system development, system review process, and alterations are done

Rey Dawson

IT Engineer

+44-XXXX-XXXX

System Designing

Luke Oley

Designer

+44-XXXX-XXXX

System Testing

Jack Mitch

Tester

+44-XXXX-XXXX

Group Name

Expectations

Specific Requirements

Communication Method

Sponsor

The project would be formed for the benefit of the people in needs and their support

Have worth of their money

Board Meetings

Approval Committee

Government would support the causes initiated by the organization

Alignment of all laws and norms

Reports

Project team

The complete project would be completed in the speculated time and budget

Completion of the project in the estimated time and budget

Emails, chats, and other means of verbal communication

Users

The users would be able to form the development of the operations and align their operations successfully

Get the benefit of the new strategies and system

Documents

The types of deliverables that are in scope and out of scope (business requirements, current state assessment)

The major life-cycle processes that are in scope and out of scope (analysis, design, testing)

The types of data that are in scope and out of scope (financial, sales, employee)

The data sources (or databases) that are in scope and out of scope (billing, general ledger, payroll)

The organizations that are in scope and out of scope (human resources, manufacturing, vendors)

PM Strategies and Deliverables

The major functionality and processes that are in scope and out of scope (decision support, data entry, management reporting)

The scope of this project includes and excludes the following items:

Objective

Success Criteria

Judge

Completion of the project is the primary in scope item for the project. The completion of the project in terms of the development and improvement of the operations and alignment of the activities.

Meeting the expected scheduled project duration

Project Manager

Exhaustion of the resources is another in scope item for the project. The project activities would involve the depletion of some specific resources and the deployment of the improved functional development. The system integration would form the morph of the objectives of the organization with that of their activities

Utilization of the available resources for successful completion of the project

Project Budgeter

Benefit to the organization members can be achieved by the deployment of the system. The system would comprise of the development methods. The alignment of the activities would allow the users to the development of the improved functional development

System and Strategies of the organization would be completed successfully

Client

The following items are out of scope for the project,

  • Transportation cost of the materials is not included in this project as the transportation of the materials has been outsourced to an external contractor. The budgeting of the activities has not considered the cost of the transportation. However, the contractor would have the contractor’s expense has been considered in the budget
  • Activities of the external contractors are aligned for ensuring that the overall project is completed successfully. The contractors provide external support for project. However, the activities of the project schedule would not consider the development of the operations.
  • Communication plan for the project team members is implied for effective and improved functional development. However, initially no project plan is considered and the alignment of the activities is formed for the deployment of the improved functional development.

Deliverable

Duration

Start

Finish

Approver

Development of initial documentation

5 days

Thu 1/4/18

Wed 1/10/18

Documenter

SWOT analysis of the capacity development

3 days

Wed 1/17/18

Fri 1/19/18

Analyst

Review of the mission statement

2 days

Mon 1/22/18

Tue 1/23/18

Project Manager

Plan Development

4 days

Fri 1/26/18

Wed 1/31/18

Planner

   Conduct External Analysis

2 days

Tue 2/6/18

Wed 2/7/18

Analyst

   Conduct Internal Analysis

2 days

Thu 2/8/18

Fri 2/9/18

Analyst

   Development of Strategies

3 days

Mon 2/12/18

Wed 2/14/18

Strategist

   Strategic Goals and Objectives Alignment

4 days

Thu 2/15/18

Tue 2/20/18

Strategist

   Action Plan development

4 days

Wed 2/21/18

Mon 2/26/18

Strategist

Deliverable

Duration

Start

Finish

Approver

Hardware and Software Consideration

3 days

Tue 2/27/18

Thu 3/1/18

IT Engineer

System Designing

5 days

Fri 3/2/18

Thu 3/8/18

Designer

System Prototyping

4 days

Fri 3/9/18

Wed 3/14/18

IT Engineer

System Development

7 days

Thu 3/15/18

Fri 3/23/18

IT Engineer

System Testing

4 days

Mon 3/26/18

Thu 3/29/18

Tester

WBS

High Level Milestones

Why Does it Matter?

Finish

0

Capacity Development for OXFAM

Completion of the project

Fri 4/20/18

1

   Initialization

Initialization of the project

Fri 1/19/18

2

   Planning

Planning is completed

Mon 2/5/18

3

   Strategy and System Development

Strategy and System development

Thu 3/29/18

3.1

      Strategy Implementation

Strategy is implemented successfully

Mon 2/26/18

3.2

      System Implementation

System is implemented successfully

Thu 3/29/18

4

   Monitoring, Review, and Closure

Project is Closed

Fri 4/20/18

The association has been intending to extend their operations and frame the enhanced improvement of operations. Be that as it may, they require some change in their current office for bestowing the enhanced operations. The project would be completed in four phases following the Agile Structure. The main stage is instatement that comprises of necessity examination, advancement of starting documentation, natural appraisal, and SWOT investigation of the limit improvement. The second stage is arranging that comprises of audit of the statement of purpose, key issues investigation, design improvement, design survey, and plan endorsement. The third stage is technique and framework improvement that comprises of procedure usage, lead outer examination, direct inward investigation, advancement of methodologies, key objectives and destinations arrangement, activity design improvement, framework execution, equipment and programming thought, framework planning, framework prototyping, framework advancement, and framework testing. The fourth stage is observing, audit, and conclusion that comprises of methodology survey process, framework audit process, adjustments are done, last documentation, and project is shut.

WBS

Task Name

Duration

Start

Finish

Predecessors

0

Capacity Development for OXFAM

80 days

Mon 1/1/18

Fri 4/20/18

1

   Initialization

15 days

Mon 1/1/18

Fri 1/19/18

1.1

      Requirement Analysis

3 days

Mon 1/1/18

Wed 1/3/18

1.2

      Development of initial documentation

5 days

Thu 1/4/18

Wed 1/10/18

2

1.3

      Environmental Assessment

4 days

Thu 1/11/18

Tue 1/16/18

3

1.4

      SWOT analysis of the capacity development

3 days

Wed 1/17/18

Fri 1/19/18

4

2

   Planning

11 days

Mon 1/22/18

Mon 2/5/18

2.1

      Review of the mission statement

2 days

Mon 1/22/18

Tue 1/23/18

5

2.2

      Strategic Issues Analysis

2 days

Wed 1/24/18

Thu 1/25/18

7

2.3

      Plan Development

4 days

Fri 1/26/18

Wed 1/31/18

8

2.4

      Plan Review

2 days

Thu 2/1/18

Fri 2/2/18

9

2.5

      Plan Approval

1 day

Mon 2/5/18

Mon 2/5/18

10

3

   Strategy and System Development

38 days

Tue 2/6/18

Thu 3/29/18

3.1

      Strategy Implementation

15 days

Tue 2/6/18

Mon 2/26/18

3.1.1

         Conduct External Analysis

2 days

Tue 2/6/18

Wed 2/7/18

11

3.1.2

         Conduct Internal Analysis

2 days

Thu 2/8/18

Fri 2/9/18

14

3.1.3

         Development of Strategies

3 days

Mon 2/12/18

Wed 2/14/18

15

3.1.4

         Strategic Goals and Objectives Alignment

4 days

Thu 2/15/18

Tue 2/20/18

16

3.1.5

         Action Plan development

4 days

Wed 2/21/18

Mon 2/26/18

17

3.2

      System Implementation

23 days

Tue 2/27/18

Thu 3/29/18

3.2.1

         Hardware and Software Consideration

3 days

Tue 2/27/18

Thu 3/1/18

18

3.2.2

         System Designing

5 days

Fri 3/2/18

Thu 3/8/18

20

3.2.3

         System Prototyping

4 days

Fri 3/9/18

Wed 3/14/18

21

3.2.4

         System Development

7 days

Thu 3/15/18

Fri 3/23/18

22

3.2.5

         System Testing

4 days

Mon 3/26/18

Thu 3/29/18

23

4

   Monitoring, Review, and Closure

16 days

Fri 3/30/18

Fri 4/20/18

4.1

      Strategy Review Process

3 days

Fri 3/30/18

Tue 4/3/18

24

4.2

      System Review Process

3 days

Wed 4/4/18

Fri 4/6/18

26

4.3

      Alterations are done

5 days

Mon 4/9/18

Fri 4/13/18

27

4.4

      Final Documentation

4 days

Mon 4/16/18

Thu 4/19/18

28

4.5

      Project is Closed

1 day

Fri 4/20/18

Fri 4/20/18

29

WBS

Task Name

Duration

0

Capacity Development for OXFAM

80 days

1

   Initialization

15 days

1.1

      Requirement Analysis

3 days

1.2

      Development of initial documentation

5 days

1.3

      Environmental Assessment

4 days

1.4

      SWOT analysis of the capacity development

3 days

2

   Planning

11 days

2.1

      Review of the mission statement

2 days

2.2

      Strategic Issues Analysis

2 days

2.3

      Plan Development

4 days

2.4

      Plan Review

2 days

2.5

      Plan Approval

1 day

3

   Strategy and System Development

38 days

3.1

      Strategy Implementation

15 days

3.1.1

         Conduct External Analysis

2 days

3.1.2

         Conduct Internal Analysis

2 days

3.1.3

         Development of Strategies

3 days

3.1.4

         Strategic Goals and Objectives Alignment

4 days

3.1.5

         Action Plan development

4 days

3.2

      System Implementation

23 days

3.2.1

         Hardware and Software Consideration

3 days

3.2.2

         System Designing

5 days

3.2.3

         System Prototyping

4 days

3.2.4

         System Development

7 days

3.2.5

         System Testing

4 days

4

   Monitoring, Review, and Closure

16 days

4.1

      Strategy Review Process

3 days

4.2

      System Review Process

3 days

4.3

      Alterations are done

5 days

4.4

      Final Documentation

4 days

4.5

      Project is Closed

1 day

 

WBS

Task Name

Resource Names

Cost

0

Capacity Development for OXFAM

£65,000.00

1

   Initialization

£8,440.00

1.1

      Requirement Analysis

Analyst

£1,440.00

1.2

      Development of initial documentation

Documenter

£3,000.00

1.3

      Environmental Assessment

Environmentalist

£2,560.00

1.4

      SWOT analysis of the capacity development

Analyst

£1,440.00

2

   Planning

£8,040.00

2.1

      Review of the mission statement

Project Manager

£2,000.00

2.2

      Strategic Issues Analysis

Analyst

£960.00

2.3

      Plan Development

Planner

£2,720.00

2.4

      Plan Review

Planner

£1,360.00

2.5

      Plan Approval

Project Manager

£1,000.00

3

   Strategy and System Development

£31,200.00

3.1

      Strategy Implementation

£10,280.00

3.1.1

         Conduct External Analysis

Analyst

£960.00

3.1.2

         Conduct Internal Analysis

Analyst

£960.00

3.1.3

         Development of Strategies

Strategist

£2,280.00

3.1.4

         Strategic Goals and Objectives Alignment

Strategist

£3,040.00

3.1.5

         Action Plan development

Strategist

£3,040.00

3.2

      System Implementation

£20,920.00

3.2.1

         Hardware and Software Consideration

IT Engineer, Hardware[1], Software[1]

£4,360.00

3.2.2

         System Designing

Designer

£4,000.00

3.2.3

         System Prototyping

IT Engineer

£3,520.00

3.2.4

         System Development

IT Engineer

£6,160.00

3.2.5

         System Testing

Tester

£2,880.00

4

   Monitoring, Review, and Closure

£17,320.00

4.1

      Strategy Review Process

Strategist

£2,280.00

4.2

      System Review Process

IT Engineer

£2,640.00

4.3

      Alterations are done

IT Engineer, Strategist

£8,200.00

4.4

      Final Documentation

Designer

£3,200.00

4.5

      Project is Closed

Project Manager

£1,000.00

Resource Name

Work

Cost

Analyst

96 hrs

£5,760.00

Documenter

72 hrs

£5,400.00

Environmentalist

32 hrs

£2,560.00

Project Manager

32 hrs

£4,000.00

Planner

48 hrs

£4,080.00

Strategist

152 hrs

£14,440.00

IT Engineer

176 hrs

£19,360.00

Designer

40 hrs

£4,000.00

Tester

32 hrs

£2,880.00

Hardware

1

£1,200.00

Software

1

£1,320.00

The assumptions of the project are,

  • Project would be completed successfully: The implication of the project operations would allow them to make some strategies and develop effective operations and development. They need to extend their scope among individuals for increasing more help in their great aims. The improvement of their association and increment of their capacity can be accomplished by giving the utilization of project administration ideas and expectations. The ramifications of the undertaking operations would enable them to make a few methodologies and create viable operations and advancement.
  • Resources would be available for successful completion of the project: The principle alignment and development has been carried on for forming the specific operational development of the activities. The formation of the activities would also allow the integration of the smart operations. The alignment of the activities would help the business organization for aligning the system deployment and management. The modification of the activities would also allow the formation of the support for the strategy deployment.
  • Risk Management would be done profitably: The capability of managing large scale of operations would be increased in OXFAM so that they can expand their area of working and form effective and improved functions. They would consider more non-profitable initiatives and align them to their ongoing agendas. The deployment of the improved system would help in forming the improved services for the people related to OXFAM as the information and data would be managed easily.

Risk area

Level (H/M/L)

Risk plan

Technical

H

Advanced Technology should be used

Financial

M

Provisional Budgeting should be implied

Operational

L

Surrogate Planning should be developed

The Project Manager has the following authority with respect to:

  • Hiring & Firing (staff acceptance) – Operations
  • Budgetary Decisions – Managerial Level
  • Technical Decisions – In support with IT head
  • Conflict Resolution – Team Leader

Beyond these levels of authority, the path of escalation is defined as follows:  

  • Hiring & Firing (staff acceptance) – Owner
  • Budgetary Decisions – Budgeter
  • Technical Decisions – IT Engineer
  • Conflict Resolution – HR Manager

References

Abell, C.E., Dekkers, J.C., Mabry, J.W., Stalder, K.J. and Rothschild, M.F., 2014. Total cost estimation for implementing genome-enabled selection in a multi-level swine production system. Genetics Selection Evolution, 46(1), p.32.

Alshmemri, M., Shahwan-Akl, L. and Maude, P., 2017. Herzberg’s Two-Factor Theory. Life Science Journal, 14(5).

Alzahrani, J.I. and Emsley, M.W., 2013. The impact of contractors’ attributes on construction project success: A post construction evaluation. International Journal of Project Management, 31(2), pp.313-322.

Anra, Y. and Yamin, M., 2017. Relationships between Lecturer Performance, Organizational Culture, Leadership, and Achievement Motivation. ???????, 11(2 (eng)).

Chang, H.K., Yu, W.D. and Cheng, S.T., 2017. A Risk-based Critical Path Scheduling Method (I): Model and Prototype Application System. In ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction (Vol. 34). Vilnius Gediminas Technical University, Department of Construction Economics & Property.

Cohen, Y., Ornoy, H. and Keren, B., 2013. MBTI personality types of project managers and their success: A field survey. Project Management Journal, 44(3), pp.78-87.

Cristofaro, S., 2014. Competing motivation models and diachrony: what evidence for what motivations?. Competing motivations in grammar and usage, pp.282-298.

Data Sources and Functionalities in Scope

Davis, K., 1973. The case for and against business assumption of social responsibilities. Academy of Management journal, 16(2), pp.312-322.

Fu, J., Yuan, Z., Wang, Y., Xu, S., Wei, W. and Luo, Y., 2014, July. Control strategy of system coordination in Nanao multi-terminal VSC-HVDC project for wind integration. In PES General Meeting| Conference & Exposition, 2014 IEEE (pp. 1-5). IEEE.

Goetsch, D.L. and Davis, S.B., 2014. Quality management for organizational excellence. Upper Saddle River, NJ: pearson.

Hammond, J.S., Keeney, R.L. and Raiffa, H., 2015. Smart choices: A practical guide to making better decisions. Harvard Business Review Press.

Kerzner, H., 2013. Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons.

Larson, E.W. and Gray, C., 2013. Project Management: The Managerial Process with MS Project. McGraw-Hill.

Leach, L.P., 2014. Critical chain project management. Artech House.

McCleskey, J.A., 2014. Situational, transformational, and transactional leadership and leadership development. Journal of Business Studies Quarterly, 5(4), p.117.

McNeil, A.J., Frey, R. and Embrechts, P., 2015. Quantitative risk management: Concepts, techniques and tools. Princeton university press.

McNerney, M.J., Marquis, J.P., Zimmerman, S.R. and Klein, A., 2016. SMART Security Cooperation Objectives. Rand Corporation.

Meller, M., 2017, June. Radar time budget optimization subject to angle accuracy constraint via cognitive approach. In Radar Symposium (IRS), 2017 18th International (pp. 1-10). IEEE.

Nooriafshar, M., 2015. A workshop on the use of an interactive multimedia environment for learning the basics of network diagram construction in project management. In Proceedings of the 13th International Conference of the Mathematics Education for the Future Project: Mathematics Education in a Connected World (Vol. 1, No. 1, pp. 275-277). Mathematics Education for the Future Project.

Parker, M. and Welch, E.W., 2013. Professional networks, science ability, and gender determinants of three types of leadership in academic science and engineering. The Leadership Quarterly, 24(2), pp.332-348.

Pritchard, C.L. and PMP, P.R., 2014. Risk management: concepts and guidance. CRC Press.

Schwalbe, K., 2015. Information technology project management. Cengage Learning.

Sharon, A. and Dori, D., 2017. Model?Based Project?Product Lifecycle Management and Gantt Chart Models: A Comparative Study. Systems Engineering.

Siami-Irdemoosa, E., Dindarloo, S.R. and Sharifzadeh, M., 2015. Work breakdown structure (WBS) development for underground construction. Automation in Construction, 58, pp.85-94.

Strachan, D.L., Källander, K., Nakirunda, M., Ndima, S., Muiambo, A. and Hill, Z., 2015. Using theory and formative research to design interventions to improve community health worker motivation, retention and performance in Mozambique and Uganda. Human resources for health, 13(1), p.25.

Tabrizi, M., Torkfar, A. and Jamshidian, L., 2014. Investigating the relationship between Leadership styles of coaches and motivation to participate in women’s sports team of Bandar Abbas.

Vassena, E., Deraeve, J. and Alexander, W.H., 2017. Predicting motivation: computational models of PFC can explain neural coding of motivation and effort-based decision-making in health and disease. Journal of cognitive neuroscience, 29(10), pp.1633-1645.

White, K.R. and FELLOW, P., 2014. Agile project management. The AMA handbook of project management, pp.441-450.

Williams, L., Rasmussen, S., Kleczkowski, A., Maharaj, S. and Cairns, N., 2015. Protection motivation theory and social distancing behaviour in response to a simulated infectious disease epidemic. Psychology, health & medicine, 20(7), pp.832-837.

What Will You Get?

We provide professional writing services to help you score straight A’s by submitting custom written assignments that mirror your guidelines.

Premium Quality

Get result-oriented writing and never worry about grades anymore. We follow the highest quality standards to make sure that you get perfect assignments.

Experienced Writers

Our writers have experience in dealing with papers of every educational level. You can surely rely on the expertise of our qualified professionals.

On-Time Delivery

Your deadline is our threshold for success and we take it very seriously. We make sure you receive your papers before your predefined time.

24/7 Customer Support

Someone from our customer support team is always here to respond to your questions. So, hit us up if you have got any ambiguity or concern.

Complete Confidentiality

Sit back and relax while we help you out with writing your papers. We have an ultimate policy for keeping your personal and order-related details a secret.

Authentic Sources

We assure you that your document will be thoroughly checked for plagiarism and grammatical errors as we use highly authentic and licit sources.

Moneyback Guarantee

Still reluctant about placing an order? Our 100% Moneyback Guarantee backs you up on rare occasions where you aren’t satisfied with the writing.

Order Tracking

You don’t have to wait for an update for hours; you can track the progress of your order any time you want. We share the status after each step.

image

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

image

Trusted Partner of 9650+ Students for Writing

From brainstorming your paper's outline to perfecting its grammar, we perform every step carefully to make your paper worthy of A grade.

Preferred Writer

Hire your preferred writer anytime. Simply specify if you want your preferred expert to write your paper and we’ll make that happen.

Grammar Check Report

Get an elaborate and authentic grammar check report with your work to have the grammar goodness sealed in your document.

One Page Summary

You can purchase this feature if you want our writers to sum up your paper in the form of a concise and well-articulated summary.

Plagiarism Report

You don’t have to worry about plagiarism anymore. Get a plagiarism report to certify the uniqueness of your work.

Free Features $66FREE

  • Most Qualified Writer $10FREE
  • Plagiarism Scan Report $10FREE
  • Unlimited Revisions $08FREE
  • Paper Formatting $05FREE
  • Cover Page $05FREE
  • Referencing & Bibliography $10FREE
  • Dedicated User Area $08FREE
  • 24/7 Order Tracking $05FREE
  • Periodic Email Alerts $05FREE
image

Services offered

Join us for the best experience while seeking writing assistance in your college life. A good grade is all you need to boost up your academic excellence and we are all about it.

  • On-time Delivery
  • 24/7 Order Tracking
  • Access to Authentic Sources
Academic Writing

We create perfect papers according to the guidelines.

Professional Editing

We seamlessly edit out errors from your papers.

Thorough Proofreading

We thoroughly read your final draft to identify errors.

image

Delegate Your Challenging Writing Tasks to Experienced Professionals

Work with ultimate peace of mind because we ensure that your academic work is our responsibility and your grades are a top concern for us!

Check Out Our Sample Work

Dedication. Quality. Commitment. Punctuality

Categories
All samples
Essay (any type)
Essay (any type)
The Value of a Nursing Degree
Undergrad. (yrs 3-4)
Nursing
2
View this sample

It May Not Be Much, but It’s Honest Work!

Here is what we have achieved so far. These numbers are evidence that we go the extra mile to make your college journey successful.

0+

Happy Clients

0+

Words Written This Week

0+

Ongoing Orders

0%

Customer Satisfaction Rate
image

Process as Fine as Brewed Coffee

We have the most intuitive and minimalistic process so that you can easily place an order. Just follow a few steps to unlock success.

See How We Helped 9000+ Students Achieve Success

image

We Analyze Your Problem and Offer Customized Writing

We understand your guidelines first before delivering any writing service. You can discuss your writing needs and we will have them evaluated by our dedicated team.

  • Clear elicitation of your requirements.
  • Customized writing as per your needs.

We Mirror Your Guidelines to Deliver Quality Services

We write your papers in a standardized way. We complete your work in such a way that it turns out to be a perfect description of your guidelines.

  • Proactive analysis of your writing.
  • Active communication to understand requirements.
image
image

We Handle Your Writing Tasks to Ensure Excellent Grades

We promise you excellent grades and academic excellence that you always longed for. Our writers stay in touch with you via email.

  • Thorough research and analysis for every order.
  • Deliverance of reliable writing service to improve your grades.
Place an Order Start Chat Now
image

Order your essay today and save 30% with the discount code ESSAYHELP