Progress Report On Management Problem Regarding Complaints Received By Caledonia Scaffolding

Definition and Justification of Management Problem, Statement of Research Question and Research Objective, Identification and Application of Relevant Theory and Secondary Sources, Identification and Justification of Research Methodology, Outline of Data Analysis Plan, Communication and Referencing

The purpose of this project report is to give an overview regarding the progress to date of the management problem regarding the complaints received by Caledonia scaffolding from residents of the locality and regarding utilisation of resources due to construction of scaffolding (Kumar et al. 2013). This project will address the progress done so far about analysing the various research objectives and research problem related to the issue. The paper will discuss the various secondary sources of data that have been used so far for this research study that would address the research objectives of the research proposal. The report will analyse the research methodologies used for the research to date and will give a brief outline of the data analysis plan that was used for the research so far.

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

Caledonia, which is a scaffolding company have constructed a staff holding structure .But after few days of work it was observed that the residents of the locality near the newly constructed scaffolding structure is creating a lot of problems for the members of the locality. Caledonia also have analysed that that due to these staff holdings lot of the resources of the company is being utilized due to the construction .It was also observed that the staff holding structure was taking up lot of space nearby and also causing lot of littering which caused issue of concern for the members of locality. This stated issue was a major concern for Caledonia leading to lot of problem of company. Thus, this particular issue is of concern and importance for the Caledonia scaffolding company because the scaffoldings are not only occupying too much space of the construction area but also they are using the vital resources of the company, which could be used for the purpose of construction in some other sites. This management problem required immediate action from Caledonia.

Caledonia scaffolding company should address the issue as if the problem is not mitigated or resolved it will incur loss to the company, which is not desirable. The company can use the resources of the company for construction in other construction purposes. Not only that, due to the activities of the scaffolding construction the residents of the locality were complaining of activities of littering around the area, which was due to the scaffolding construction. If Caledonia does not resolve the problem of the local residents, they may complain about it to the concerned government authorities as a result Caledonia may land in a legal trouble. Thus, this issue is of prime importance for Caledonia and it needs to be addressed immediately.   

 Due to the various issues that were raised related to the construction of scaffolding, Caledonia decided to remove the scaffoldings to mitigate various issues raised due to the construction of the scaffoldings. Caledonia removed the scaffoldings to free up the space that was used due to the construction of the scaffolding and use the company’s resources for other benefits like making constructive activities in some other sites that would bring profit to the company.

This issue of scaffolding construction not only raised complaints from the local residents near the construction site but also occupying lot of space utilizing lot of resources of the company which could be used for other benefits of the company. As a result, this issue of Caledonia is deemed as a major management problem that demands attention.

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper
  • Research question and objectives

The research question that was used for the research was that:

  • What are the Australian best practices or licensing for scaffolding that minimises the disruption to others and still meet safety requirements.

The research objectives used in the research that would address the research question are:

RO1: To find out the loss incurred by the company Caledonia, because of the construction of these scaffoldings.

RO2: To find out the means through which they can be removed without causing any significant problem for the construction workers.

RO3: To find out the manner in which the space and the resources consumed by the construction of the scaffoldings can be used effectively.

The industry, that was discussed in the research was Scaffolding market industry, Scaffolding industry provides work access solutions that includes erecting and disassembling scaffolding, renting of scaffolding and providing services, to oil and petrochemical clients, directly or through general contractors (Reiser and Tabak  2014). The scaffolding industry has been divided based on types, materials, application, and regions.  Based on the type, the scaffolding market has been divided as Supported Scaffolding, Suspended Scaffolding, and Rolling Scaffolding.

The Scaffolding Company discussed in the research is Caledonia, which is a scaffolding company in Australia, which provide wide range of services in Australia related to Scaffolding like scaffold hire, providing scaffold design and project management tasks. Caledonia offers services in Australia and New Zealand; however, the research is related to its services of scaffolding construction work in Australia.

  • Report outline

This progress report gives details of the research topic and studies about the research topic that relates to problems regarding scaffolding, its field of implications and gives a overview of the practices regarding scaffolding that minimises disruption to local residents near the site of scaffolding construction. This report will also try to analyse and address the objectives related to the research topic. The next portion of the progress report will discus and analyse the research methodologies used for this research so far, that includes the research approach and data collection techniques used for the research to date.  The last section of this progress reports gives details of the proposed analysis of the results.

Scaffolding work includes erection, alteration or disassembling of a temporary structure that is constructed to support a platform .The scaffolding work is associated with risks and accidents so a person who is engaged in scaffolding work should have a high-risk work licence. The person who is undertaking the work of scaffolding should hold a relevant class of work licence that is approved by the WHS regulations. Many accidents occur every year related to scaffolding work, which includes injuries as well as death cases. Scaffolding work demands a proper safety management that would support prevention and safety mitigation (Hou et al. 2016). There have been research works that assessed the safety risk factors related to scaffolding construction (Collins et al 2014).In the article the authors developed a approach to integrate a safety risk factors with BIM  for safety management using 4 dimensional (4D) BIM which is a tool for safety management. The scaffolding work, when a construction project is underway, often leads to problems like waste of managerial material and resources (Chen and Luo 2014) .There was a research that was done, where the authors from premier technical institutes of USA developed a rule-based system that plans automatically scaffold system. It would be utilized for various purposes related to  scaffolding work (Kim and Teizer 2014). The paper discussed the leading industry practices regarding scaffolding system management and planning. The article also highlighted the automated design and planning system that can be used in communication, billing of materials and scheduled simulation.

There have been some research works done previously that defines scaffolding work in construction in true terms and also highlighted the risks associated with it .Scaffolding work should only engage people who are competent and posses a relevant work licence issued and approved by WHS regulations (Schofield, Reeve and McCallum 2014). There were also some research works, which highlighted the importance of using automated scaffold system and stated its implications and usability. However, there are certain topics that are needed to be addressed related to scaffolding work

Scaffolds are temporary frameworks that are constructed to support working platforms. Scaffolds are used in the work of construction so that the workers get a safe and fixed platform when the work is done above ground level or on a constructed floor. Scaffolding includes use of components such as frames and tubes which when assembled can form a scaffold.  Scaffolding work includes structuring, altering and dismantling of a temporary structure that are erected to support a particular platform.

Lot of risk is associated with scaffolding work so it is regarded as the high-risk job (Sousa, Almeida and Dias 2014). In a scaffolding ,work there is a risk of people or object  falling from a height of more than four metres(Zhou  Goh and Li 2015) .There are three classes of high risk work licence that comes under the guidelines of model WHS regulation that is followed in Australia. The three classes of licences are –basic, intermediate and advanced. The details of the scaffolding licensing are mentioned below:

Figure 1List of licensing related to scaffold work

(Source: Schofield, Reeve and McCallum 2014)

  • Types of Scaffold and Scaffolding

Birdcage Scaffold – A birdcage scaffold is a scaffold that is not dependent, it has more than two rows of standards in two directions, which are connected to each other with the help of Transoms and ledgers. It is used mostly for carrying out work in a single level.

Figure 2Birdcage Scaffold

(Source: Chi,  Lin and Dewi  2014)

Trestle Scaffold – The trestle scaffold is constructed from already fabricated braces and other accessories .the Trestle scaffolds are generally used by bricklayers and painters .These type of scaffolds does not require licensed scaffolder to dismantle or erect .

Figure 3Trestle Scaffold

(Source : Zhang  Boukamp and Teizer 2015)

Hung scaffold – The hung scaffold is an independent scaffold ,it cannot be elevated or lowered when it is being used .The hung scaffold generally hangs from another structure.

Figure 4Hung Scaffold

(Source: Chi,  Lin and Dewi  2014)

  • Issues that can damage scaffolds

There are certain issues that can damage the scaffold equipment leaving it vulnerable (Chi,  Lin and Dewi  2014).

  • Environmental condition- Extremities of weather can attribute to damage of scaffold. Extreme conditions of rainfall, heat and cold causes rusting of the scaffold equipments (Fischer  and Knutti 2015).
  • Improper work protocols – If the workers do not maintain proper working protocols or guidelines, it leads to damage of scaffold equipments (Hsiao,  2014).
  • Overloading – Overloading is a major concern in working of scaffold. If the load bearing capacity of scaffolds are breached it can lead to severe accidents causing injuries and deaths (Kazmi,  Qasim and Kazmi).
  • Absence of qualified personnel- Works related to scaffold requires high competency so it is essential to engage properly trained and licensed personnel in this work activity. They can use their knowledge and guidance to make the scaffolds safer.
  • Implications – the research gap

There had been many researches that studied analysed the hazards and risks, related to scaffolding works (Zhang  Boukamp and Teizer 2015). The previous works related to scaffolding underlines and highlights the issues that lead to damage of scaffolds .It discusses the vulnerability of scaffolds and problems related to it. However, the researches done on scaffolding fails to address the issues of combating the safety issues of scaffolding .The also fails to address what measures should be taken to utilize the resources  used by scaffolding work for other benefits. . Further research should be done that would work on measures to ensure safe scaffolding system and use of software for scaffolding system.

Figure 5Conceptual model

(Source: created by author)

Research methodology is the method that helps a researcher to design their research in an appropriate manner (Flick, 2015). The research methodology deals with the various methods that   the researcher has adopted to conduct the study (Taylor, Bogdan and DeVault 2015.). It is important to select proper methodology, as proper selection of the research methodology will help the researcher to deduce his finding in a suitable way.

  • Research approach and justification

Data collection methodologies are the procedure of collection of data, which can be classified as primary data and secondary data (Rhodes et al.,2014). Data collection methodologies are done over the targeted variables in a systematic and organized manner. Primary Data Collection method involves raw data collection like conducting of questionnaires, interviews or surveys with a small group of individuals. On the other hand, Secondary Data Collection methods involve use of the previous researches to collect data from various sources such as reliable articles, reviewed journals and other sources (Clark 2013). For this research proposal, both primary and secondary data is to be collected. For  the collection of primary data both quantitative and qualitative methods will be used it will as it make the research much reliable and justifies as in qualitative method of primary data collection interaction will be much more and wherever much interaction is not required quantitative method would be used that would save time. In collection of primary data, 10 managers of Caledonia scaffolding company and 50 employees of Caledonia would be interviewed and a survey would be done with the employees of Caledonia with questionnaires (Rowley 2014). These surveys would be sufficient to gather information and analyse the research question and objectives as they are direct stake holders of the organization concerned with the research .Thus no other further primary data collection would be required. Secondary data will be used which will give a brief idea about the researches done previously on the concerned topic that addresses the research objectives and the research questions.

For the accomplishment of this research proposal for primary and secondary data would be used. Use of both the primary and secondary data would strengthen the research work and help to analyse the research question and objectives in much better way. For the primary data collection, both quantitative and qualitative methods would be used. The qualitative method is necessary for the research, as in qualitative method 10 managers of the Caledonia scaffolding company would be interviewed (Miles, Huberman and Saldana 2013). The interview would be face to face that would provide lot of interactions .This interaction would be beneficial as the managers are fully aware of the problems faced by Caledonia and what are the concerning issues. For quantitative method approach, 50 employees of Caledonia would be surveyed with open-ended questionnaires. This would address the research question giving us a general opinion from them in less time. There are secondary sources of data that address the research questions detailing the practices and licensing of the scaffolding works. The research works on scaffolding works also states how these scaffolding structures can be dismantled and removed without disrupting others. The details of the data collection techniques have been provided in the form of table.

Research Objective

Data Collection Methods/Techniques

(secondary and/or primary)

Data Analysis Plan

R01: To find out the loss incurred by the company because of the construction of these scaffoldings

Primary

Surveys conducted with the other construction companies

R02: To find out the means through they can be removed without causing any significant problem for the construction workers

Primary

Interviews with the members of the other construction companies

R03: To find out the manner in which the space and the resources consumed by the construction of the scaffoldings can be effectively used.

Primary

Interviews will be conducted with the members of the concerned company

R04: To find out a suitable location near the construction area where the workers can reside during the construction of the building with the company having to incur any significant amount of capital.

Primary

Interviews will be conducted with the members of the concerned company

Table 1Data collection method and techniques

(Source: Created by the author)

Research Activities

Week 1

Week 2

Week 3

Week 4

Week 5

Selection  of Research topic

Introduction and Literature Review

Data collection

method

Data analysis

Method

Expected Outcome

Table 2 Gantt Chart

(Source: Created by the author)

Data Analysis method is the process of inspecting and transforming data that will help to make decision and help in suggesting conclusions. There are two major categories of Data Analysis methodology; they are Qualitative and Quantitative Data Analysis techniques (Miles, Huberman & Saldana, 2013). In this   research proposal, the researcher shall conduct quantitative data analysis where the researcher would conducts surveys of employees in Caledonia and other scaffolding companies to almost 50 employees. A qualitative analysis was also done which included interviews to 10 managers of Caledonia and other construction companies in Australia. The data collected in survey will be transformed into numerical bar charts and percentages, in order to obtain a reliable outcome from the collected data.

References

Chen, L. and Luo, H., 2014. A BIM-based construction quality management model and its applications. Automation in construction, 46, pp.64-73.

Chi, C.F., Lin, S.Z. and Dewi, R.S., 2014. Graphical fault tree analysis for fatal falls in the construction industry. Accident Analysis & Prevention, 72, pp.359-369.

Clark, G., 2013. 5 Secondary data. Methods in Human Geography, p.57.

Collins, R., Zhang, S., Kim, K. and Teizer, J., 2014. Integration of safety risk factors in BIM for scaffolding construction. In Computing in Civil and Building Engineering (2014) (pp. 307-314).

Fischer, E.M. and Knutti, R., 2015. Anthropogenic contribution to global occurrence of heavy-precipitation and high-temperature extremes. Nature Climate Change, 5(6), p.560.

Flick, U., 2015. Introducing research methodology: A beginner’s guide to doing a research project. Sage.

Hou, L., Zhao, C., Wu, C., Moon, S. and Wang, X., 2016. Discrete firefly algorithm for scaffolding construction scheduling. Journal of Computing in Civil Engineering, 31(3), p.04016064.

Hsiao, H., 2014. Fall prevention research and practice: a total worker safety approach. Industrial health, 52(5), pp.381-392.

Kazmi, Z., Qasim, S. and Kazmi, D., An Assessment of Risk Management Practices in the Logistics and Construction Industry.

Kim, K. and Teizer, J., 2014. Automatic design and planning of scaffolding systems using building information modeling. Advanced Engineering Informatics, 28(1), pp.66-80.

Kumar, C., AbouRizk, S.M., Mohamed, Y., Taghaddos, H. and Hermann, U., 2013. Estimation and planning tool for industrial construction scaffolding. In ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction (Vol. 30, p. 1). Vilnius Gediminas Technical University, Department of Construction Economics & Property.

Miles, M.B., Huberman, A.M. and Saldana, J., 2013. Qualitative data analysis. Sage.

Reiser, B.J. and Tabak, I., 2014. Scaffolding. In The Cambridge Handbook of the Learning Sciences, Second Edition. Cambridge University Press.

Rhodes, J.D., Upshaw, C.R., Harris, C.B., Meehan, C.M., Walling, D.A., Navrátil, P.A., Beck, A.L., Nagasawa, K., Fares, R.L., Cole, W.J. and Kumar, H., 2014. Experimental and data collection methods for a large-scale smart grid deployment: Methods and first results. Energy, 65, pp.462-471.

Rowley, J., 2014. Designing and using research questionnaires. Management Research Review, 37(3), pp.308-330.

Schofield, T., Reeve, B. and McCallum, R., 2014. Australian workplace health and safety regulatory approaches to prosecution: Hegemonising compliance. Journal of Industrial Relations, 56(5), pp.709-729.

Sousa, V., Almeida, N.M. and Dias, L.A., 2014. Risk-based management of occupational safety and health in the construction industry–Part 1: Background knowledge. Safety science, 66, pp.75-86.

Taylor, S.J., Bogdan, R. and DeVault, M., 2015. Introduction to qualitative research methods: A guidebook and resource. John Wiley & Sons.

Zhang, S., Boukamp, F. and Teizer, J., 2015. Ontology-based semantic modeling of construction safety knowledge: Towards automated safety planning for job hazard analysis (JHA). Automation in Construction, 52, pp.29-41.

Zhou, Z., Goh, Y.M. and Li, Q., 2015. Overview and analysis of safety management studies in the construction industry. Safety science, 72, pp.337-350.

What Will You Get?

We provide professional writing services to help you score straight A’s by submitting custom written assignments that mirror your guidelines.

Premium Quality

Get result-oriented writing and never worry about grades anymore. We follow the highest quality standards to make sure that you get perfect assignments.

Experienced Writers

Our writers have experience in dealing with papers of every educational level. You can surely rely on the expertise of our qualified professionals.

On-Time Delivery

Your deadline is our threshold for success and we take it very seriously. We make sure you receive your papers before your predefined time.

24/7 Customer Support

Someone from our customer support team is always here to respond to your questions. So, hit us up if you have got any ambiguity or concern.

Complete Confidentiality

Sit back and relax while we help you out with writing your papers. We have an ultimate policy for keeping your personal and order-related details a secret.

Authentic Sources

We assure you that your document will be thoroughly checked for plagiarism and grammatical errors as we use highly authentic and licit sources.

Moneyback Guarantee

Still reluctant about placing an order? Our 100% Moneyback Guarantee backs you up on rare occasions where you aren’t satisfied with the writing.

Order Tracking

You don’t have to wait for an update for hours; you can track the progress of your order any time you want. We share the status after each step.

image

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

image

Trusted Partner of 9650+ Students for Writing

From brainstorming your paper's outline to perfecting its grammar, we perform every step carefully to make your paper worthy of A grade.

Preferred Writer

Hire your preferred writer anytime. Simply specify if you want your preferred expert to write your paper and we’ll make that happen.

Grammar Check Report

Get an elaborate and authentic grammar check report with your work to have the grammar goodness sealed in your document.

One Page Summary

You can purchase this feature if you want our writers to sum up your paper in the form of a concise and well-articulated summary.

Plagiarism Report

You don’t have to worry about plagiarism anymore. Get a plagiarism report to certify the uniqueness of your work.

Free Features $66FREE

  • Most Qualified Writer $10FREE
  • Plagiarism Scan Report $10FREE
  • Unlimited Revisions $08FREE
  • Paper Formatting $05FREE
  • Cover Page $05FREE
  • Referencing & Bibliography $10FREE
  • Dedicated User Area $08FREE
  • 24/7 Order Tracking $05FREE
  • Periodic Email Alerts $05FREE
image

Services offered

Join us for the best experience while seeking writing assistance in your college life. A good grade is all you need to boost up your academic excellence and we are all about it.

  • On-time Delivery
  • 24/7 Order Tracking
  • Access to Authentic Sources
Academic Writing

We create perfect papers according to the guidelines.

Professional Editing

We seamlessly edit out errors from your papers.

Thorough Proofreading

We thoroughly read your final draft to identify errors.

image

Delegate Your Challenging Writing Tasks to Experienced Professionals

Work with ultimate peace of mind because we ensure that your academic work is our responsibility and your grades are a top concern for us!

Check Out Our Sample Work

Dedication. Quality. Commitment. Punctuality

Categories
All samples
Essay (any type)
Essay (any type)
The Value of a Nursing Degree
Undergrad. (yrs 3-4)
Nursing
2
View this sample

It May Not Be Much, but It’s Honest Work!

Here is what we have achieved so far. These numbers are evidence that we go the extra mile to make your college journey successful.

0+

Happy Clients

0+

Words Written This Week

0+

Ongoing Orders

0%

Customer Satisfaction Rate
image

Process as Fine as Brewed Coffee

We have the most intuitive and minimalistic process so that you can easily place an order. Just follow a few steps to unlock success.

See How We Helped 9000+ Students Achieve Success

image

We Analyze Your Problem and Offer Customized Writing

We understand your guidelines first before delivering any writing service. You can discuss your writing needs and we will have them evaluated by our dedicated team.

  • Clear elicitation of your requirements.
  • Customized writing as per your needs.

We Mirror Your Guidelines to Deliver Quality Services

We write your papers in a standardized way. We complete your work in such a way that it turns out to be a perfect description of your guidelines.

  • Proactive analysis of your writing.
  • Active communication to understand requirements.
image
image

We Handle Your Writing Tasks to Ensure Excellent Grades

We promise you excellent grades and academic excellence that you always longed for. Our writers stay in touch with you via email.

  • Thorough research and analysis for every order.
  • Deliverance of reliable writing service to improve your grades.
Place an Order Start Chat Now
image

Order your essay today and save 30% with the discount code ESSAYHELP