Cost estimation is very crucial in all construction projects as it provides vital information to the client and contractor regarding financial requirements of the project (Chan, 2012); (Elfaki, Alatawi, & Abushandi, 2014). The cost estimation in this task is for the following rooms: powder room, laundry, ensuite and bathroom of the two story brick veneer building at Penrith in Project 1. The dimensions of these rooms are as follows:

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

Powder room: 1800 mm by 1900 mm

Laundry: 2090mm by 3010mm

Ensuite: 3400mm by 1500mm + 900mm by 1520mm

Bathroom: 3260mm by 3030mm

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

It is important to note that the project is at lock up stage and therefore most of the trades in this task are finishing and appliance or fixture installation works.

The following are the key trades included in the bill of quantities:

This involves supply and installation of tiles on floors and walls of the rooms. Specifications of tiles to be installed are provided in the contract documents

Ceramic floor tiles:

Entire floor area of these rooms is covered with ceramic tiles

Total floor area = (1.8m x 1.9m) + (2.09m x 3.01m) + [(3.4m x 1.5m) + (0.9m x 1.52m)] + (3.26m x 3.03m)

= 3.42m2 + 6.2909m2 + 5.1m2 + 1.368m2 + 9.8778m2 = 26.0567m2 = 26.06m2

Plus 10% wastage =

Ceramic wall tiles:

Half the height of wall in these rooms is covered with ceramic tiles

Total wall height = 2.45m; half the wall height = 0.5 x 2.45m = 1.225m

Total wall length: [1.8m + (2 x 1.9m) + 0.9m] + [(2 x 2.09m) + (2 x 3.01m)] + [(2 x 3.4m) + 2.4m + 1.73m] + [(2 x 3.03m) + 3.26m + 2.44m]

= 6.5m + 10.2m + 10.93m + 11.76m = 39.39m

Total wall area = 39.39m x 1.225m = 48.25m2

Plus 10% wastage =

This involves supply and installation of toilet suites, shower bases, vanities, tub, bath, tap ware and fittings in the rooms. Specifications of each of the above mentioned items are provided in the contract documents.

This involves supply and installation of electrical fixtures, such as lighting fittings, switches and lighting points, SWA/PVC copper cables, meter board and earthing. It also includes electrical wiring. Specifications of the electrical works are provided in the contract documents.

This involves supply and installation of shelves and joineries, and plasterboard cornices. Specifications of the woodwork products and installation requirements are provided in the contract documents.  

This involves supply and installation of ceiling in the rooms. Specifications of the ceilings are provided in the contract documents.

Entire roof area of the rooms on the first floor is covered with gypsum plasterboard ceilings

Total roof area on first floor = [(3.4m x 1.5m) + (0.9m x 1.52m)] + (3.26m x 3.03m)

= 5.1m2 + 1.368m2 + 9.8778m2 = 16.3458m2 = 16.352

Plus 10% wastage =

This involves painting specific areas of the rooms. Specifications of the paints and painting procedures are provided in the contract documents.

The untiled walls and roof of the ground floor shall be painted.

Total wall and roof area to be painted (including 10% waste) = 53m2 + 18m2 = 71m2

The bill of quantities for the above trades is provided in Table 1 below

Table 1: Bill of quantities

Item

Description

Qty

Unit

Rate ($)

Amount ($)

1

Tiling

1.1

Ceramic floor tiles

22mm thick cement and sand (1:4) screed/mortar to receive ceramic floor tiles

29

M2

5

145

300x300x8mm thick approved non-slip ceramic tiles fixed using adhesive on prepared screed on floors

29

M2

40

1,160

100mm high skirting

44

M

4

176

Labour

10

Hours

50

500

1.2

Ceramic wall tiles

12mm thick cement and sand (1:4) backing to receive ceramic wall tiles

53

M2

5

265

300x300x8mm thick approved non-slip ceramic tiles fixed using adhesive on prepared screed on floors

53

M2

30

1,590

Labour – ceramic tilers

20

Hours

50

1,000

Total for tiling carried to summary

4,836

2

Plumbing

2.1

Toilet suites

Wall faced, ultra-quiet toilet suites

2

No

600

1,200

2.2

Shower bases

Supply 900 x 900mm, 1500 x 920mm and 1200 x 1200mm shower bases

3

No

500

1,500

2.3

Vanity 600 wide

Vanity 600 wide vanity for powder room

1

No

350

350

2.4

Vanity 1200 wide

1200 wide vanity to be installed in ensuite and bathroom

2

No

600

1,200

2.5

Tub

Tub to be installed in laundry

1

No

250

250

2.6

Bath 1675mm

Bath 1675mm to be installed in bathroom

1

No

750

750

2.7

Tap ware

Provide a PC sum of 1000 for supply of tap ware

PC

1,000

1,000

2.8

Fittings

Provide a PC sum of 600 for supply of fittings

PC

600

600

Labour – plumbers

25

Hours

80

2,000

Total for plumbing carried to summary

8,850

3

Electrical works

Provide a PC sum of 500 for supply of electrical works including lighting fittings, switches and lighting points, SWA/PVC copper cables, meter board and earthing

PC

500

500

Labour – electrician

15

Hours

70

1,050

Total for electrical works carried to summary

1,550

4

Woodwork

 

4.1

Shelves and joineries

 

Shelves and joineries in laundry, powder room, ensuite and bath

PC

800

800

Labour – carpenters

18

Hours

45

810

4.2

Plasterboard cornice

 

15mm thick by 75mm high plasterboard cornice installed on walls

44

M

8

352

Labour – wallboard fixers

15

Hours

40

600

Total for woodwork carried to summary

2,562

5

Ceiling

 

15mm thick quality gypsum plasterboard ceiling with taped and filled joint in accordance with manufacturers instructions

18

M2

30

540

Labour – ceiling installers

15

Hours

60

900

Total for ceiling installation carried to summary

1,440

6

Painting

Prepare and apply 1 undercoat and 2 finishing coats of silk vinyl emulsion paint to plasterboard ceilings’ surface

54

M2

4

216

Prepare and apply 1 undercoat and 2 finishing coats exterior quality emulsion paint to plasterboard cornice surface below 100mm girth

44

M

4

176

Prepare and apply 1 undercoat and 3 finishing coats of internal quality emulsion paint to plastered untilled internal walls

212

M2

3

636

Labour – painters

15

Hours

60

900

Total for painting carried to summary

1,928

The summary of bill of quantities is provided in Table 2 below

Table 2: Summary of estimated costs

Item

Description

Amount ($)

1

Tiling

4,836

2

Plumbing

8,850

3

Electrical works

1,550

4

Woodwork

2,562

5

Ceiling

1,440

6

Painting

1,928

Sub Total 1

21,166

Add 12% builders margin

2,540

Sub Total 2

23,706

Add 10% GST

2,371

TOTAL

26,077

Preliminaries are very essential in construction projects because they provide mandatory instructions, general information and running costs for setting up the project. The preliminary costs are usually arbitrary in nature (Abas, Ismail, Ismail, & Arshad, 2017). The estimated cost of preliminaries for the two storey brick veneer building at Penrith in Project 1 is provided in Table 3 below

Table 3: Preliminary Estimate

Item

Description

Quantity

Unit

Rate ($)

Amount ($)

1

Drawings and documentation costs

PC

7,500

2

Site and access

PC

8,200

3

Consultants fees

PC

9,000

4

Authorities fees, including approvals, inspections, LSL (long service levy), DA and CC

11,500

5

Project supervision

6,500

6

Site clearing, demolition and cleaning

3,050

7

Builder’s risk allowance

420,000

%

0.005

2,100

8

Project publicity sign board

PC

1,000

9

Temporary hoardings/site fencing

70

M

20

1,400

10

Scaffolding

140

M2

60

8,400

11

Site accommodation

PC

4,100

12

Site security

PC

2,850

13

Workplace health and safety

PC

3,000

14

Traffic control

PC

2,500

15

Removal of rubbish

PC

2,200

16

Temporary services

PC

6,500

17

Survey/setting out

PC

4,000

18

Direct site labour

420,000

%

0.075

3,150

19

Quality control

PC

3,500

20

Details of bond or guarantee terms and loan interest allowance

PC

4,500

21

Contract conditions and insurances

PC

3,500

22

Homeowners warranty insurance

PC

4,200

Sub Total 1

102,650

Add 12% builder margin

12,318

Sub Total 2

114,968

Add 10% GST

11,497

TOTAL

126,465

References

Abas, A., Ismail, F., Ismail, Z., & Arshad, R. (2017). Cost of Preliminaries of Construction Projects for Civil Infrastructure Works in Malaysia. Sains Humanikaa, 9(2), 9-13.

Chan, C. (2012). The principal factors affecting construction project overhead expenses: an exploratory factor analysis approach. Construction Management and Economics, 30(10), 903-914.

Elfaki, A., Alatawi, S., & Abushandi, E. (2014). Using Intelligent Techniques in Construction Project Cost Estimation: 10-Year Survey. Advances in Civil Engineering, 2014, 1-11.

What Will You Get?

We provide professional writing services to help you score straight A’s by submitting custom written assignments that mirror your guidelines.

Premium Quality

Get result-oriented writing and never worry about grades anymore. We follow the highest quality standards to make sure that you get perfect assignments.

Experienced Writers

Our writers have experience in dealing with papers of every educational level. You can surely rely on the expertise of our qualified professionals.

On-Time Delivery

Your deadline is our threshold for success and we take it very seriously. We make sure you receive your papers before your predefined time.

24/7 Customer Support

Someone from our customer support team is always here to respond to your questions. So, hit us up if you have got any ambiguity or concern.

Complete Confidentiality

Sit back and relax while we help you out with writing your papers. We have an ultimate policy for keeping your personal and order-related details a secret.

Authentic Sources

We assure you that your document will be thoroughly checked for plagiarism and grammatical errors as we use highly authentic and licit sources.

Moneyback Guarantee

Still reluctant about placing an order? Our 100% Moneyback Guarantee backs you up on rare occasions where you aren’t satisfied with the writing.

Order Tracking

You don’t have to wait for an update for hours; you can track the progress of your order any time you want. We share the status after each step.

image

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

image

Trusted Partner of 9650+ Students for Writing

From brainstorming your paper's outline to perfecting its grammar, we perform every step carefully to make your paper worthy of A grade.

Preferred Writer

Hire your preferred writer anytime. Simply specify if you want your preferred expert to write your paper and we’ll make that happen.

Grammar Check Report

Get an elaborate and authentic grammar check report with your work to have the grammar goodness sealed in your document.

One Page Summary

You can purchase this feature if you want our writers to sum up your paper in the form of a concise and well-articulated summary.

Plagiarism Report

You don’t have to worry about plagiarism anymore. Get a plagiarism report to certify the uniqueness of your work.

Free Features $66FREE

  • Most Qualified Writer $10FREE
  • Plagiarism Scan Report $10FREE
  • Unlimited Revisions $08FREE
  • Paper Formatting $05FREE
  • Cover Page $05FREE
  • Referencing & Bibliography $10FREE
  • Dedicated User Area $08FREE
  • 24/7 Order Tracking $05FREE
  • Periodic Email Alerts $05FREE
image

Services offered

Join us for the best experience while seeking writing assistance in your college life. A good grade is all you need to boost up your academic excellence and we are all about it.

  • On-time Delivery
  • 24/7 Order Tracking
  • Access to Authentic Sources
Academic Writing

We create perfect papers according to the guidelines.

Professional Editing

We seamlessly edit out errors from your papers.

Thorough Proofreading

We thoroughly read your final draft to identify errors.

image

Delegate Your Challenging Writing Tasks to Experienced Professionals

Work with ultimate peace of mind because we ensure that your academic work is our responsibility and your grades are a top concern for us!

Check Out Our Sample Work

Dedication. Quality. Commitment. Punctuality

Categories
All samples
Essay (any type)
Essay (any type)
The Value of a Nursing Degree
Undergrad. (yrs 3-4)
Nursing
2
View this sample

It May Not Be Much, but It’s Honest Work!

Here is what we have achieved so far. These numbers are evidence that we go the extra mile to make your college journey successful.

0+

Happy Clients

0+

Words Written This Week

0+

Ongoing Orders

0%

Customer Satisfaction Rate
image

Process as Fine as Brewed Coffee

We have the most intuitive and minimalistic process so that you can easily place an order. Just follow a few steps to unlock success.

See How We Helped 9000+ Students Achieve Success

image

We Analyze Your Problem and Offer Customized Writing

We understand your guidelines first before delivering any writing service. You can discuss your writing needs and we will have them evaluated by our dedicated team.

  • Clear elicitation of your requirements.
  • Customized writing as per your needs.

We Mirror Your Guidelines to Deliver Quality Services

We write your papers in a standardized way. We complete your work in such a way that it turns out to be a perfect description of your guidelines.

  • Proactive analysis of your writing.
  • Active communication to understand requirements.
image
image

We Handle Your Writing Tasks to Ensure Excellent Grades

We promise you excellent grades and academic excellence that you always longed for. Our writers stay in touch with you via email.

  • Thorough research and analysis for every order.
  • Deliverance of reliable writing service to improve your grades.
Place an Order Start Chat Now
image

Order your essay today and save 30% with the discount code ESSAYHELP