Business Case For IT Investment: Micromax’s Lean Six-Sigma Implementation

Purpose of the business case

The business case is about the IT investment of Micromax in terms of increased productivity of their handsets by using Lean six-sigma in the company. The business case will focus on the benefits of the investment done by the company in its different business verticals. The business case will focus on the improvement on waste management, quality management and the waste management of the newly implemented strategy in the whole supply chain management of the company. The business case of Micromax will answer few questions whether they are doing the right things in a right way. Apart from that, the resources and funds required for the implementation of the new strategy are discussed in the business case. The value of the new program will be increased brand image as well as reduced waste and lead times by 80%. It will also lead to savings of cost of almost 15%.

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

The approach of the business case for Micromax is comprehensive in nature that will involve financial benefit analysis, risk analysis, non-financial benefit analysis, alignment analysis, outcomes and documentation of the business case. Apart from that, the fact sheet will be provided that will describe the operational capability, business capability, resource capability, etc. The viable alternatives for solving the decision-making problem of the employees regarding the implementation of the new procedure in the business units are identified. The financial and non-financial analysis will explain about the constraints and benefit of the IT investment of Micromax. However, it is predicted that the company will earn profits and few business units will earn huge income in terms of more production of handsets. It is recommended that the company can provide extensive training to the people who are associated with the supply chain management and the manufacturing units of the company.

Building

Implementation

Operation

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

Retirement

Fact Sheet Item

Best Case

Worst Case

Best Case

Worst Case

Best Case

Worst Case

Best Case

Worst Case

Technical Capability

Outcomes

Available infrastructure is capable of building the proposed changes

Infrastructure is not capable, building the proposed changes will lead to breakdowns

Enough capacity at Micromax to implement Lean Six Sigma to their processes

The capacity is not enough to implement the lean six sigma production process

Reliable infrastructure to operate a Lean Six Sigma as proposed

Unreliable infrastructure, cannot sustained the proposed changes as Micromax

Successful project, that is, successful implementation of Lean Six Sigma

Project failed, the proposal was not implemented at all

Alignment

Micromax uses available infrastructure to build the new proposal

Micromax needs new infrastructure to build the new proposal

Available infrastructure useful at Micromax are useful at implementing LSS

Available infrastructure not used to implement the LSS as they are not in line with the proposals

Output is increased after the proposal is implemented by about 20%

Output does not increase after implementation

No additional infrastructure needed, it uses the available ones

Infrastructure was needed, the available did not match the needs of the proposal

Financial benefits

Cost of acquiringIT needs for LSS is relatively low, saving Micromax huge amounts

Cost of acquiring is high and affects the company’s financial position

Additional costs are needed for the new IT investment are at the very minimum for the company

Additional costs for the new IT investment are high for the company to cover the costs

The new investment to improve the production process at Micromax brings more profit of about 12%

There are only lossesafter the new investment is implemented, Micromax is in a bad financial situation  

The investment can be applied across other aspects of Micromax apart from the production lines

Systems are obsolete and cannot be applied by Micromax to other business lines

Non-financial benefits

Staff atMicromax are motivated and are willing to build the investment

Staffs are demotivated at Micromax and are not willing to work on the new investment

Improvement of company culture at Micromax towards excellence

Corporate culture deteriorates from the current or remains at the initial level

Improved company image in the market from the commitment to excellence

Company image destroyed since the project failed and could not deliver to the customer what they promised

Micromax’s credibility is built and strengthened because of the commitment to quality and excellence   

Credibility destroyed because they failed to commit to quality and excellence

Resources

Company uses available resources to implement the new IT investment

Company needs to acquire more resources to successfully go ahead with the new investment

Resources are not strained when Micromax rolls out the new IT investment

Resources are strained and cannot support the successful implementation of LSS

The use of LSS is resource conscious, hardly impacting the resource balance at the company

Operation of LSS proves to be resource intensive, affecting the resource balance at the company  

The resources needed for maintenance is low, it does not use more than it brings in

Maintenance is high, LSS proves to be unsustainable to the company

Expenditure

Manageable budget needed for building LSS IT requirements and infrastructure

Huge budget needed to implement LSS, the company spends more instead

Micromax spends what was planned initially for the new investment

Micromax spends beyond the planned amount for the implementation of LSS

Micromax spends reasonable amount to maintain the LSS investment

Micromax needs a lot of funds to maintain LSS, raising the spending by over 10% of the planned amount

Revenue from implementing the IT investment is higher than spending

Spending on LSS is evidently higher than revenue from the same investment

Risk drivers

Micromax has enough capacity for LSS

Capacity is not enough to build and implement LSS

Skillset is available necessary for LSS implementation at Micromax

Skillset is not available within Micromax for effective implementation of LSS

Micromax makes money after implementing LSS

Micromax incurs losses after the implementation of LSS

Performance is enhanced after Micromax implemented LSS, with efficiency rates of about 6%

Performance does not change after implementation, the efficiency rates are negative  

Assumptions and constraints

Technology needed for LSS to be implemented at Micromaxis not costly

Technology needed is costly for Micromax to implement the new technology

The employees currently working at Micromaxare capable of successfully implementing the new LSS

Employees do not understand or have the capacity to implement LSS

Micromax supports the operations after the implementation of LSS

Operations are not supported because the company is skeptical about the success of the investment

Micromax’s performance is improved after successful implementation of LSS

Micromax’s performance stagnates after all the investment in new technology  

Operational capability

Outcomes

Available skills at Micromax are fully utilized

Skills are not fully utilized, Micromax does not benefit from the internal capacity

Efficient use of Micromax resources to implement the new project (Lean Six Sigma)

The resources are not utilized efficiently, affecting the smooth implementation of LSS at Micromax

Micromax’s brand position improves after the implementation of LSS

Brand position stagnant as compared to the previous times, LSS brings no value to Micromax

Micromax’s brand perception improves as it implements the new strategy

Brand perception declines or stagnates even after all the resources invested on the new IT investment

Alignment

Number of staff needed available within the company, Micromax has sufficient and relevant roles

Need to hire extra staffs because the available ones do not understand the new IT investment

Matches the available skillset, that is, Micromax’s new investment falls in the line of the available staff and matches their skills

Does not match the available skillset, Micromax’s new investment does not align with existing skillset  

The new investment aids achieving Micromax’s vision and goals

The new investment does not help in achieving Micromax’s  goals and visions

After investing,the company strategy is boosted because it is in line with existing strategy

Company strategy receives no boost because the two do not match at all

Financial benefits

Acquiring staff to match the investment is affordable for the company

High cost of acquiring staff for the new investment, affecting the company’s financial performance

Implementation costs for the LSS process improvement are low for Micromax

Implementation costs are high for Micromax and affects the financial position of the company

LSS operation costs are low for Micromax, it leads to huge savings for the company

Operation costs are high after the LSS is implemented, no much savings  

Increased revenues of about 8% for Micromax because LSS reduces wastes, improves quality, and reduces lead time

Reduced or plateaued revenues for the company because the implementation of the new project was not successful

Non-financial benefits

Good reception by Micromaxemployees because they own the investment

Employees do not appreciate or own the project, which can affect its implementation  

Micromax employee are motivate to work their best because the new IT investment makes work easier  

Demotivated employees because they do not understand the changes and do not own the project

Micromax’s corporate image is improved because it is implementing industry standard technology

Micromax’s corporate image does not change, it risks to deteriorate

Corporate culture changes because of the new operation standards

Corporate culture does not change because the investment does not change the operation standards

Resources

No training is needed for the implementation of LSS, saving resource needed

Training is necessary, which means the company will spend more on new resource

Micromax does not need extra systems to implement LSS, which means less resource will be used

Micromax has to develop or acquire extra systems meaning that they will spend more

Micromax has enough internal capacity to run LSS successfully, saving the company resource to be used to acquire capacity  

Micromax has to outsource services hence more resource to acquire outside capacity

Micromax has developed in-house capacity which is a positive asset to the company and an addition to available resources

In-house capacity is not strong and the company is deficient in resources like that

Expenditure

Micromax saves on costs related to previous production techniques by about 13%

Micromax spends more than it planned leading to extra expense to the company

Additional costs are on the minimum, the planned amount is sufficient to build capacity, implement, and run the LSS

Additional costs are high and exorbitant, increasing the company’s spending

Wages are manageable, the company will reduce the workforce, saving a lot in wages paid to duplicated jobs

Wages are crippling the company because the workforce is ballooning

Marginal spending is low because the new investment reduces wastes by about 80%  

Marginal spending is high as the waste in the production process remains high

Risk drivers

Enough resources for the company to build the infrastructure and systems for Lean Six Sigma

Inadequate resources for Micromax to invest in the new production strategy

Micromax has enough capacity to implement LSS without outside help

Micromax lacks required capacity, which necessitates outsourcing of services

Resources are enough to sustain the implementation and operation of LSS

Resources are not enough to sustain the implementation and consequently operations of LSS

Micromax sees value in investing on LSS for improved production process

Micromax does not see any value in implementing LSS as it appears as a loss to the company

Assumptions and constraints

There is a need within Micromax to improve the production process and reduce wastes

There is no need within the company, the current production techniques meet the company strategy plans and goals

Micromax has the will to implement LSS and sees value in implementing

Micromax does not see the need to implement as it does not see any value to their strategic goals  

Micromax dedicates resources to the implementation of LSS

Micromax has no resources set aside for the new investment

The company assigns some staff to manage the changes in the company streamlining operations

The company does not assign any staff to manage change, which maintain the confusion it existed before

Business capability

Outcomes

Less production times and reduced waste by about 80%

Production times do not change, remains as it was before

Micromax produces quality products after implementing LSS

The products do not show much quality improvement after the investment

Market for company products increased  because of improved production techniques and outstanding quality products

Market does not record any significant changes, quality of products is mediocre

Increased revenues for Micromaxfrom waste, cost, and lead time reduction

Revenues do not increase significantly, no increase directly connected to new investment by the company   

Alignment

The LSS investment falls under existing business units

New investment does not fall under existing business units, needs establishing a new business unit

Uses available labor, reducing the needed labor and keeping it at the optimum level

Needs extra labor for the company to efficiently implement the IT investment  

Strengthens available business units within Micromax as it streamlines the production process and reduces wastes

Disrupts available business units, increases costs, and wastes remain as they were

Business strategy strengthened by the investment, it improves on quality, waste management, and process improvement   

Business strategy does not improve, no notable changes in business processes

Financial benefits

Huge cost savings of almost 15% from implementing LSS in the company

Costs are high, Micromax spends more that the planned amount to implement the project

Expanded income streams as Micromax cuts on waste and improves the production process, enabling the company to focus on other revenue streams

Income streams remain the same, no additional revenue streams or notable cost savings

Profits increase from business units, the new investment reduces costs and wastes while improving the manufacturing process in the company  

Profits do not increase or Micromax runs into losses, the investment needs more money than the revenue it brings

Business units earn more income because operations are streamlined

Business units run into losses because the investment brings little change or no change at all  

Non-financial benefits

Improve employees skillset because they are trained on new skills for the implementation of LSS

Employees’ skillset does not change because the LSS investment does not add value to the company

Morale within the company boosted because the investment encourages them towards quality delivery and better production processes

Morale deteriorates because the new investment does not motivate the employee in the company  

Streamlines operations between units, LSS ensures that the operations are free of waste and quality production is the focus  

Operations have problems coordinating because of too much waste and unclear production processes

Strong business units producing quality products at Micromax, which improves customer satisfaction   

Business units are not stable, customer satisfaction is non-existent

Resources

Business units not affected, the new investment does not affect normal operations in the company

Cripples business units because it disrupts normal operations in the company

Micromax sources from within, it does not need to procure extra resource for the implementation of LSS

Micromax needs to outsource and procure extra resource, which can be costly to the company

Existing structures at Micromaxenough to run LSS successfully, and if necessary the structures can be reduced

Existing structures are not enough, more are needed which is an additional cost to the company

Resources sufficient for successful implementation, Micromax’sperformance remains steady

Strained resources which eventually affect the company performance

Expenditure

Micromax spends on necessary items only for LSS

Micromax is out of capacity and needs to spend more to have LSS on its legs

Implementing LSS does not dent company budget, the spending is kept on the minimum

Implementing LSS destabilizes company budget, which can be a disaster to the company

Additional spending manageable with the existing company resource

Additional spending very high which the company cannot afford at its current situation  

Maintenance costs are very low, the investment operates smoothly with less hiccups   

Maintenance is high, needs a lot of money to have it continue past its useful life

Risk drivers

Business units flexible to allow easy integration of the new IT investment

Business units rigid, cannot allow integration of new investment at Micromax

Micromax supports operations of the new investment

Micromax does not support operations because it does not have the financial muscle to sustain it  

Adds competitive advantage to the company products and processes, increasing revenue

Does not add any competitive advantage, the company revenue is affected

There is a continuity plan for the LSS, which ensures that the investment does not go to waste

No continuity plan for the investment

Assumptions and constraints

Micromax has extra resources to invest in a new IT investment/program

Micromax is working on strict budget and do not have any additional funds to implement the proposed investment

Available business units accommodate change in the company, allowing the company to implement LSS

Business units are rigid and does not allow new investments to be introduced

Funds are available for new investments within the company as long as they are justified investments

Funds are limited, no room for new investments as far as funds are concerned  

Micromax has a continuity plan for the new investment and will ensure that it is operational

Micromax does not have a continuity plan for the new investment at all

In terms of technical capability, the alignment analysis portrays that Micromax will use the available infrastructure for the implementing the new proposal. Alignment in the operational capability includes the number of experienced staffs required for the maintenance of new implemented lean six-sigma processes in the supply chain management processes. The IT investment will strengthen the business capability of the company along with improved production rate in the handsets in all of the strategic business units. The company has talented and experienced employees that will handle the rate of production and its distribution to the retailers and distributors. However, it is to be assumed that the IT investment will utilize the resources available to the company at its maximum level in order to achieve the business goals. The company has enough resource so that they can successfully start the manufacturing process of Lean six-sigma while reducing the lead times and waste management.

Approach of the business case

Alternative:

Option #1 Non-Implementation of Lean Six-Sigma is continuing with current operation process.

Option #2 Implementation of Lean Six-Sigma is initiating new infrastructure technique for improving operational activities.

Alternative

Advantages

Disadvantages

Impact on Stakeholders

Option #1 Non-Implementation of Lean Six-Sigma

· High Strategic Alignment

· Best NPV

· High project risk

· High manufacturing cost

· The stakeholders would be disappointed with outdated supply chain management system

Option #2 Implementation of Lean Six-Sigma

· High Strategic Alignment

· Expected Benefits are with waste management and manufacturing cost saving

· Minimum project risk

· High Cost option

· Improved business process

· Improved supply chain management system

Financial Benefit Analysis – Option #1

1st Year ($K)

2nd Year ($K)

3rd Year ($K)

4th Year ($K)

5th Year ($K)

6th Year ($K)

Total ($K)

Benefits:

Cost Savings

0

0

0

0

0

0

0

Cost Avoidance

0

0

0

0

0

0

0

Revenue

0

0

0

0

0

0

0

Other

0

0

0

0

0

0

0

TOTAL BENEFITS

0

0

0

0

0

0

0

Costs:

Non-Recurring

0

0

0

0

0

0

0

Recurring

$120

$131

$128

$138

$149

$152

$818

TOTAL COSTS

$120

$131

$128

$138

$149

$152

$818

Net Benefit / Cost of Alternative 1

-120

-131

-128

-138

-149

-152

-818

Present Value of Benefits

0

Present Value of Costs

-712

NPV for Option #1

-712

Discount Rate

4%

Financial Benefit Analysis – Option #2

1st Year ($K)

2nd Year ($K)

3rd Year ($K)

4th Year ($K)

5th Year ($K)

6th Year ($K)

Total ($K)

Benefits:

Cost Savings

0

0

0

$21

$25

$31

$77

Cost Avoidance

0

0

0

$14

$17

$18

$49

Revenue

0

0

0

0

0

0

0

Other

0

0

0

0

0

0

$48

TOTAL BENEFITS

0

0

0

$35

$42

$49

$126

Costs:

Non-Recurring

$219

$24

$23

$172

$19

$52

$509

Recurring

$52

$54

$53

$56

$57

$58

$330

TOTAL COSTS

$271

$78

$76

$228

$76

$110

$839

Net Benefit / Cost of Alternative 2

-52

-54

-53

-21

-15

-9

-$202

Present Value of Benefits

119

Present Value of Costs

723

NPV for Option #2

-604

Discount Rate

4%

Financial Summary ($1,000’s)

Non-Implementation Option #1

Implementation Option #2

Present value of Total Benefits:

0

119

Present value of Total Costs:

-712

723

Net Present Value of the Project:

-712

-604

Option #1

Non-financial Summary

Description

Impacted Stakeholders

Ranking

Benefits:

Low change to current process

Cost avoidance at every levels

All

L

Costs:

Waste Management

The organization would be affected from poor waste management

All

M

Brand Image Enhancement

The reduced brand image would affect the sales of company

All staff

M

Option #2

Non-financial Summary

Description

Impacted Stakeholders

Ranking

Benefits:

Improved supply chain management

Logistics would be enhanced

All

L

Enhanced Waste management

Effective waste management would save resource and enhance brand image

All

M

Costs:

Initiation Cost

The initiation cost is greater

All

L

Transition

The organization need to undertake complex and stressful change management

All staff

L

Non-Financial Summary

Non-Implementation Option #1

Implementation Option #2

Summary of Total Benefits:

L

M

Summary of Total Costs:

L

L

Overall non-financial value of the Project:

L

M

Project Risk Assessment

Non-Implementation Option #1

Implementation Option #2

Probability

Impact

Risk Factor

Probability

Impact

Risk Factor

Risk 1: Customer Loyalty

5

4

20

1

4

5

Risk 2: Time Management

4

4

16

3

4

12

Risk 3: Cycle Time

4

5

20

2

4

8

Risk 4: Supply Chain Management

4

5

20

1

4

5

Risk 5: Cost of Lean Six Sigma

5

1

5

5

4

20

Risk 6: Necessity of Talented Employees

5

3

15

5

5

25

Summary Risk factor

96

75

The outcomes of the IT investment of Micromax resulted in the deployment of the resources (tangible and intangible resources) in many layers. The outcomes can be can be categorized into operational layers, functional layers. The business units of Micromax will earn huge income regarding the increased production of the different handsets of Micromax. However, the risks related to the flexibility related to the IT investment of the company will be mitigated. It will add a competitive advantage to the company that will affect the profitability of the company. The continuity of the plan regarding the different new investment must be operational in nature. In terms of capabilities of the employees, it is to be seen that the morale of the employees regarding using new systems in operations are high as the profitability increases while increasing the quality of the handsets.

If the IT investment of Micromax will run in a proper way, then the company will en sure a very less percentage in the waste management and lead times in the manufacturing process of the business units. The business units thereby improve customer satisfaction by providing them quality products to them. Performance of Micromax will remain steady if the resources of the company are successfully implemented in the required areas. The IT investment will improve process improvement, quality management and waste management.

Albliwi, S. A., Antony, J., & Lim, S. A. H. (2015). A systematic review of Lean Six Sigma for the manufacturing industry. Business Process Management Journal, 21(3), 665-691.

Callahan, C. D., & Roberts, T. S. (2017). Performance Measurement and Operations Improvement Using Lean Six Sigma. In Practical Psychology in Medical Rehabilitation (pp. 569-573). Springer International Publishing.

De Koeijer, R. J., Paauwe, J., & Huijsman, R. (2014). Toward a conceptual framework for exploring multilevel relationships between Lean Management and Six Sigma, enabling HRM, strategic climate and outcomes in healthcare. The International Journal of Human Resource Management, 25(21), 2911-2925.

Furterer, S. L. (Ed.). (2016). Lean Six Sigma in service: applications and case studies. CRC Press.

Goetsch, D. L., & Davis, S. B. (2014). Quality management for organizational excellence. Upper Saddle River, NJ: pearson.

Goffnett, S. P., Lepisto, L., & Hayes, R. (2016). Using the socio-economic approach to management to augment Lean Six Sigma. International Journal of Productivity and Performance Management, 65(1), 80-97.

Lameijer, B. A., Lameijer, B. A., Does, R. J., Does, R. J., De Mast, J., & De Mast, J. (2016). Inter-industry generic Lean Six Sigma project definitions. International Journal of Lean Six Sigma, 7(4), 369-393.

McAdam, R., Antony, J., Kumar, M., & Hazlett, S. A. (2014). Absorbing new knowledge in small and medium-sized enterprises: A multiple case analysis of Six Sigma. International Small Business Journal, 32(1), 81-109.

Pyzdek, T., & Keller, P. A. (2014). The six sigma handbook (p. 25). McGraw-Hill Education.

Ratnayake, R. C., Ratnayake, R. C., Chaudry, O., & Chaudry, O. (2017). Maintaining sustainable performance in operating petroleum assets via a lean-six-sigma approach: A case study from engineering support services. International Journal of Lean Six Sigma, 8(1), 33-52.

What Will You Get?

We provide professional writing services to help you score straight A’s by submitting custom written assignments that mirror your guidelines.

Premium Quality

Get result-oriented writing and never worry about grades anymore. We follow the highest quality standards to make sure that you get perfect assignments.

Experienced Writers

Our writers have experience in dealing with papers of every educational level. You can surely rely on the expertise of our qualified professionals.

On-Time Delivery

Your deadline is our threshold for success and we take it very seriously. We make sure you receive your papers before your predefined time.

24/7 Customer Support

Someone from our customer support team is always here to respond to your questions. So, hit us up if you have got any ambiguity or concern.

Complete Confidentiality

Sit back and relax while we help you out with writing your papers. We have an ultimate policy for keeping your personal and order-related details a secret.

Authentic Sources

We assure you that your document will be thoroughly checked for plagiarism and grammatical errors as we use highly authentic and licit sources.

Moneyback Guarantee

Still reluctant about placing an order? Our 100% Moneyback Guarantee backs you up on rare occasions where you aren’t satisfied with the writing.

Order Tracking

You don’t have to wait for an update for hours; you can track the progress of your order any time you want. We share the status after each step.

image

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

image

Trusted Partner of 9650+ Students for Writing

From brainstorming your paper's outline to perfecting its grammar, we perform every step carefully to make your paper worthy of A grade.

Preferred Writer

Hire your preferred writer anytime. Simply specify if you want your preferred expert to write your paper and we’ll make that happen.

Grammar Check Report

Get an elaborate and authentic grammar check report with your work to have the grammar goodness sealed in your document.

One Page Summary

You can purchase this feature if you want our writers to sum up your paper in the form of a concise and well-articulated summary.

Plagiarism Report

You don’t have to worry about plagiarism anymore. Get a plagiarism report to certify the uniqueness of your work.

Free Features $66FREE

  • Most Qualified Writer $10FREE
  • Plagiarism Scan Report $10FREE
  • Unlimited Revisions $08FREE
  • Paper Formatting $05FREE
  • Cover Page $05FREE
  • Referencing & Bibliography $10FREE
  • Dedicated User Area $08FREE
  • 24/7 Order Tracking $05FREE
  • Periodic Email Alerts $05FREE
image

Services offered

Join us for the best experience while seeking writing assistance in your college life. A good grade is all you need to boost up your academic excellence and we are all about it.

  • On-time Delivery
  • 24/7 Order Tracking
  • Access to Authentic Sources
Academic Writing

We create perfect papers according to the guidelines.

Professional Editing

We seamlessly edit out errors from your papers.

Thorough Proofreading

We thoroughly read your final draft to identify errors.

image

Delegate Your Challenging Writing Tasks to Experienced Professionals

Work with ultimate peace of mind because we ensure that your academic work is our responsibility and your grades are a top concern for us!

Check Out Our Sample Work

Dedication. Quality. Commitment. Punctuality

Categories
All samples
Essay (any type)
Essay (any type)
The Value of a Nursing Degree
Undergrad. (yrs 3-4)
Nursing
2
View this sample

It May Not Be Much, but It’s Honest Work!

Here is what we have achieved so far. These numbers are evidence that we go the extra mile to make your college journey successful.

0+

Happy Clients

0+

Words Written This Week

0+

Ongoing Orders

0%

Customer Satisfaction Rate
image

Process as Fine as Brewed Coffee

We have the most intuitive and minimalistic process so that you can easily place an order. Just follow a few steps to unlock success.

See How We Helped 9000+ Students Achieve Success

image

We Analyze Your Problem and Offer Customized Writing

We understand your guidelines first before delivering any writing service. You can discuss your writing needs and we will have them evaluated by our dedicated team.

  • Clear elicitation of your requirements.
  • Customized writing as per your needs.

We Mirror Your Guidelines to Deliver Quality Services

We write your papers in a standardized way. We complete your work in such a way that it turns out to be a perfect description of your guidelines.

  • Proactive analysis of your writing.
  • Active communication to understand requirements.
image
image

We Handle Your Writing Tasks to Ensure Excellent Grades

We promise you excellent grades and academic excellence that you always longed for. Our writers stay in touch with you via email.

  • Thorough research and analysis for every order.
  • Deliverance of reliable writing service to improve your grades.
Place an Order Start Chat Now
image

Order your essay today and save 30% with the discount code ESSAYHELP