Business Analysis And Process For Tesco: Supporting Operations And Customer Service Policies

Project Information

Describe business analysis and process to support the operations and customer service policies of Tesco, a major retail business entity.

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

For the purpose of the study, the establishment of business analytics and processes to support the operational and customer service policies of Tesco, a major retail business entity.

Kerzner (2013) stated that the IT project management primarily focuses to work on applications and analytical projects to serve customers better. This includes implementing advanced technology mechanisms to collect customer data track consumer data accordingly. Burke (2013) mentioned that in addition, it would assist the management of the organization to record customer preferences and frame the marketing as well as the operational policies accordingly. It is expected that this would assist the daily business functionalities in a more effective manner. The operational process of the business entity would be more effective in offering superior customer services to the employees. These technologies are expected to assist any retail business entity to enhance their production rate with requiring minimum amount of time and resources (Walker 2015). 

Various internal and external factors can affect the development of such technologies. These include the market demand and general consumer choices and preferences.  The response of customer towards such changes in the operational processes of a business enterprise is one factor that should be considered here (Leach 2014).In addition, the intensity of market completion is another essential attribute affecting the implementation of IT projects in the organization.

The internal factors include the cost incurred in implementing such a project. The project should be commercially viable from the point of view of the investors in a business enterprise. In other words the IT project would be able to add to the profitability of the firm.  Besides this, the financial state of the business enterprise is other essential criteria that can have an impact towards adopting such technology relating to applications and analytics (Phillips 2013) The retail brand should have the necessary financial strength to incur considerable expenditure without affecting the revenue inflow of the firm. Another internal factor is the training and aptitude of the employees working in the firm. The employees should posses the necessary skills to make optimum utilization of such advanced technology mechanisms that shall reduce the operational expenses of a business enterprise. (Turner 2014).  However, the quality of such IT projects is an essential factor in determining the financial position of the organization. The risks associated with such a project relates to the financial expenditures and negative consumer perception. In addition, it can be said that there shall be some amount of resistance from within the organization (Marchewka 2014). The project management procedure would be able to overcome such constraints in helping the organization to achieve business sustainability.  

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

Assumptions

The following are the limitations and constraints of the project management process ‘

  1. Budget – To implement an IT project shall require considerable expenditure. Therefore, such expenditures shall be considered when adopting such procedures. As per the budget decided by the management of the organization, the management must introduce such IT projects. However, this can lead to high expenses, which the business enterprise   should be able to bear. According to Heagney (2012), it should be critically analyzed to prevent such expenses form adversely influencing the financial stability of the business enterprise.  
  2. Time – Limitation of time is one of the pertinent limitations that can affect the stability of a business organization .  As such , constraints of time is one of the essential attribute that the  business organization has to consider before introducing such IT project in the organization .Therefore, the procedure of implementing such processes in the organization should be done in minimum period to assist the organization in its growth. Mir and Pinnington (2014)   noted that a lengthy procedure would not be beneficial for the firm in the end. 
  3.  Training – The staff has to be adequately trained to adapt to such changes. It can be stated that lack of training in technology requirements shall harm the growth of the business enterprise. Effective training has been a pertinent limitation towards imposing such changes in the operational processes of a retail business entity (Crawford 2014).  This would have a negative influence on the quality of customer services offered by the entity.

The business approach should be an in-depth covering a range of activities that has to be influenced when implementing the business applications and analytical procedures of a business enterprise.  Firstly, the necessary discrepancies and the weaknesses in the organization shall be implemented.  The business approach is mainly based on the following requirements – Effective operational as well as customer service policies to the management (Unab and Kundi 2014).   Therefore, these two processes shall be adequately considered when building analytics and business application to keep track of consumer demand and preferences as well as the effectiveness of the operational policies of the business enterprise.  

According to Teller et al. (2014), establishment of applications and business analytics should follow a systematic procedure. Therefore, it should involve minimum amount of time and resources.  In addition, it s shall be effective enough to serve the purpose of the business organization.

The following are the requirements of the project as per the MOSCOW analysis

Must have – The must have requirements are critical to the success of the project these include – essential details related to the development of the applications. The application is constituted of the variable and the fixed factors that are vital to the functionalities of these applications in the context of developing of smoother operational processes of the business enterprise.  According to Meng (2012), the variable factors like consumer demand, the economic conditions of a particular place and the market conditions are subjected to frequent changes.  Therefore, the business applications and analytics must consider all these elements when developing advanced technological processes to assist a business enterprise.

The Moscow analysis presents a vital emphasis on the constituents that can be labeled as essential items on the establishment of IT project management procedures. Young (2013) mentioned that these elements bring added benefits. In the context of the study, these elements relate to adoption of essential technological requirements that enables a entity to offer superior customer service.  

 The certain technological requirements that can be labeled as could have and therefore not necessary to the achievement of primary objectives to the business enterprise. These relate to implementing processes to achieve greater sales revenue in the market.

These relate to the establishment of procedure that are not necessary, in the context of the present business position of the retail entity.  In this regard, it can be said that these procedure shall have an adverse influence to the business sustainability of a retail business enterprise. These would also lead to unnecessary expenses, thereby, affecting the productivity of a firm. In these regard , it  can be said that items labeled as won’t have should be strictly  avoided to prevent any undue threat or obstacle that can affect the IT project management procedure

Constraints

The project deliverable consists of the following three stages

Conceptualization – In this stage, there shall be two constituents that are- business transformation, technical solutions as well architecture. The Conceptualization stage is the initial stage where the IT project   management is fully planned   and the necessary   steps are taken for its implementation. 

Development – The development process   relates to the process where customized Apps as well as analytics are established   to enhance the current business processes.  This relates to the improving the existing operational polices, and offering customer services to the buyers. 

Operations – This is the final stage of the project deliverable processes. The  operations stage  can be  classified  into  three stages which are –  Infra and Network , Operations as well as the  support  towards  the applications of a business enterprise. The Infra and Network relates to improving the existing   technicalities currently followed in the organization (Holzmann 2013). The Applications  support relate to  consolidating  the  newly  developed  applications  as well as the  business  analytics  procedures   that  are  being  followed in the business  enterprise.    The operational stage facilities   the support functions of   a retail entity.  The support functions can be subdivided into Finance, L&D, HR and operations (Caniëls and Bakens 2012).  The  Project  management office  as well as integrated  portfolio management   are   the  functions   that shall  be supported by  IT   project  management   procedure        

From the  above  diagram  it    can  be  said  that  the  development  of business apps and analytics  shall assist a retail entity  to provided  support to a  range  of   business functionalities .    

The governing structure shall determine the implementation of the IT project management in the business enterprise (Lock 2014).  Therefore, the   authority and the direction would come from the top management of the organization.  In this  regard , it can be said that the  nature of structural policies followed  in the organization shall determine the  success of  the  business to  large  extent . Therefore, it is upto the management of the organization to make necessary planning relating the implementation of the project management activities in an organization.  The engineers of the organization shall handle the technical issues.    Any  technical issues shall be  handled  by  people  having qualified expertise  in the  field  of IT project management (Tong  and Thomson 2015).  In regarding implementing the changes within every layer in the organization, the human resources department shall be responsible. The project team and the top management or the leadership group shall have a very important relationship. There should be a clear flow of communication between these two parties, to avoid any misrepresentation of data. It can be said that both parties are co-dependent on each other (Besner, and Hobbs 2013).  The project team is dependent on the governance entities for adequate resources as well as the direction that the implementation of business applications and other analytics that the business organization would be required to be followed. On the other hand, the management is dependent on the project team to determine consistent delivery of IT solutions to a business enterprise .This shall enable the business entity to authenticate the use of business applications and analytics for the betterment and growth of the organization.  

Outline Number

Task Name

Duration

Start

Finish

Evaluation stage

0

 TESCO Business applications

86 days

Mon 03-05-16

Mon 02-05-16

 

1

 Project start

0 days

Mon 04-05-16

Mon 04-05-16

 

2

 Phase 1: Requirement specification

18 days

Mon 04-05-16

Wed 28-05-16

 

2.1

 Meeting fixed with the director

0.5 days

Mon 04-05-16

Mon 04-01-16

1

2.2

 Assessing the present situation of the school

1 day

Mon 03-05-16

Tue 05-0516

3

2.3

Assessing the requirements of the system

0.5 days

Tue 05-05-16

Tue 05-01-16

4

2.4

Collecting information about the methods currently being used

1 day

Wed 06-05-16

Wed 06-01-16

5

2.5

Client meetings

1 day

Thu 07-05-16

Thu 07-01-16

6

2.6

Documentation procedure 1

14 days

Fri 08-05-16

Wed 27-05-16

 

2.6.1

 Establishing the scope statement

1 day

Fri 08-05-16

Fri 08-05-16

7

2.6.2

 Functional requirements

0.5 days

Mon 11-05-16

Mon 11-01-16

9

2.6.3

Non functional necessaities  

0.6 days

Mon 11-05-16

Mon 11-01-16

10

2.6.4

Establishing the  documents  to  establish  the  non-functional documents of  the  organization

2 days

Pplications Tue 12-05-16

Wed 12-05-16

11

2.6.5

Document submission 

1 day

Thu 14-05-16

Thu 14-05-16

12

2.6.6

  Acceptance of proposal

1 day

Fri 15-05-16

Fri 15-05-16

13

2.6.7

Changes reflected by the client

2 days

Mon 18-05-16

Tue 19-05-16

14

2.6.8

Assessing  of project

2 days

Wed 20-05-16

Thu 21-05-16

15

2.6.9

 Budget estimation of project

2 days

Fri 22-05-16

Mon 25-05  -16

16

2.6.10

Budgetory necessities  regarding the  client

1 day

Tue 26-05-16

Tue 26-05-16

17

2.6.11

Establishment o of budget and schedule

1 day

Wed 27-05-16

Wed 27-05-16

18

2.7

Approval  of proposals

0 days

Wed 27-05-16

Wed 27-05-16

19

3

 Step 2: Establishing  the entire  project team

8 days

Thu 28-05-16

Mon 08-02-16

 

3.1

Deciding on the team

3.5 days

Thu 28-05-16

Tue 02-02-16

 

3.1.1

The selection of  Project team   procedure

0.5 days

Thu 28-05-16

Thu 28-05-16

20

3.1.2

 Project leader  choosing procedure

1 day

Thu 28-05-16

Fri 29-05-16

23

3.2

Deciding on the training needs of the resources.

4.5 days

Tue 02-02-16

Mon 08-02-16

 

4.1.1

Designs of the system

2 days

Tue 09-05-16

Wed 10-02-16

31

4.1.2

 Developing the prototype based on the primary designs

7 days

Thu 11-05-16

Fri 19-02-16

34

4.1.3

 Allowing the client to test the prototype

4 days

Mon 22-05-16

Thu 25-02-16

35

4.1.4

 Considering changes requested by the client

7 days

Fri 26-05-16

Mon 07-03-16

36

4.1.5

The procedure of approve of new design

1 day

Tue 08-05-16

Tue 08-03-16

37

4.2

Prototype approved by client

0 days

Tue 08-05-16

Tue 08-03-16

38

4.3

Establsihing  the working model

23 days

Wed 09-05-16

Fri 08-04-16

 

4.3.1

 Final design

4 days

Wed 09-05-16

Mon 14-03-16

39

4.3.2

 Coding the ICT system

12 days

Tue 15-05-16

Wed 30-03-16

41

4.3.3

 Test phase

2 days

Thu 31-05-16

Fri 01-04-16

42

4.3.4

 System installation

3 days

Mon 04-05-16

Wed 06-04-16

43

4.3.5

 Integration test (after the system has been installed in the school)

2 days

Thu 07-05-16

Fri 08-04-16

44

4.4

 system commissioned

0 days

Fri 08-05-16

Fri 08-04-16

45

5

 Phase 4: Employee Training  procedure

13 days

Mon 11-04-16

Wed 27-04-16

 

5.1

Improving  the  documenatation of  the User manuals and  other necessary requirements

3 days

Mon 11-04-16

Wed 13-04-16

46

5.2

Training  methods and techniques 

4 days

Thu 14-04-16

Tue 19-04-16

48

5.3

  Training program implemented for the  employees

6 days

Wed 20-04-16

Wed 27-04-16

4

ACTIVITY

Project Manager

Systems Analyst

 SMEF

SMEA

Application Programm

Information System procedure

Program Team member

Quality Assuranc e   procedure e

Phase 1: Stating the requiremnts

XXXX

XXXXX

XXXXX

XXXXX

XXXXXXXXX

XXXXXXXX

XXXXXXX

XXXXXXX

   Director meeting

R

   Measuring the present situtauon

C

R

   system requirements

C

R

   Data collection procedure  

I

R

Management decision  .

I

R

   Documentation phase 1

XXXXXXXX

XXXXX

XXXXX

XXXXX

XXXXXXXXX

XXXXXXXX

XXXXXXX

XXXXXXX

      Developing the scope statement

I

R

      Deciding on the functional requirements of the ICT system

I

R

      Deciding on the non functional requirements of the ICT system

I

R

      Identifying the necessary requirements about the IT project implemantation 

I

R

       Submission  of  documenst

d

      Proposal accepted

XXXXXXXX

XXXX

XXXXX

XXXXX

XXXXXX

XXXXXXXX

XXXXXXX

XXXXXXX

      Accence of changes indicated by client

I

R

      Predictiing  tiem estimation

R

      Budget estimation of project

R

      Informig the client about the schedule .

R

A

A

      Client approves budget and schedule

I

   All proposals approved

XXXXXXXX

XXXXX

XXXXX

XXXXX

XXXXXXXXX

XXXXXXXX

XXXXXXX

XXXXXX

Phase 2: Defining the entire project team

XXXXXXXX

XXXXX

XXXXX

XXXXX

XXXXXXXXX

XXXXXXXX

XXXXXXX

XXXXXXX

   Deciding on the team

XXXXXXXX

XXXXX

XXXXX

XXXXX

XXXXXX

XXXXXXX

XXXXXX

XXXXXXX

      Selection of project team

R

      Selection of project leader

R

      Deciding about the vision and mission about the project

A

I

I

I

I

I

R

I

      Documenting team rules

R

C

C

C

C

C

C

C

      Skill determination

C

R

   Implementing the trainung needs of the resource

XXXXXXXX

XXXX

XXXXX

XXXXX

XXXXXXX

XXXXXXX

XXXXX

XXXXXX

       Collecting information regarding the skill sets of the resources

R

      Documenting the roles and responsibilities of the project team

R

      Training of  resources

A

R

Phase 3 : Establsihment phase  of the organizatin

XXXXXXXX

XXXXX

XXXXX

XXXXX

XXXXXXX

XXXXXXX

XXXXXX

XXXXXX

   The nature of  prototype

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXX

XXXXXXX

XXXXXX

XXXXXXX

       The inherentdesign of  the system

A

I

I

I

I

R

I

I

      Developing the prototype based on the primary designs

A

I

I

I

I

I

R

I

      Designing the prototype

A

R

I

I

I

I

I

I

      Taking into  account the  changes

A

I

I

I

I

R

I

I

      Requesting the client to approve the new design

R

I

I

I

I

I

I

   Prototype approved by client

XXXXX

XXXXX

XXXXXXXX

XXXXXXXX

XXXXXXXX

XXXXXXXX

XXXXXXXXXX

XXXXXXXXXX

   Establishing the working model of  the

XXXXXXXX

XXXXXXXX

XXXXXXXX

XXXXXXXX

XXXXXXXX

XXXXXXXX

XXXXXXXXXX

XXXXXXXXXX

      Design of  the  system

A

I

I

I

I

R

I

I

      Development of Coding procedures

A

I

I

I

I

I

R

I

      Test procedure

A

I

I

I

I

I

I

R

      Implementation of  newer system  and proceses

A

I

I

I

I

I

R

I

      Evaluating the  Test

A

I

I

I

I

I

I

R

   Isystem commissioned

R

I

I

I

I

I

I

I

Phase 4: Employee Training  procedure

XXXXXX

XXXXXX

XXXXXX

XXXXXX

XXXXXXX

XXXXXXX

XXXXXX

XXXXXXX

    Documentaion of user manuals

A

R

Training materials docmentation

A

R

   Desiging  the training program

A

R

Phase 5: Project closure phase

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXX

XXXXX

XXXXXX

XXXXXX

   Conducting the post implementation review

A

C

R

C

C

C

C

CI

   Client  sign off

R

Resarching   the documents

R

I

I

I

I

I

I

I

Terminatin of the project

R

Project Approach

Work Schedule

Project Milestone

Date of Completion

Stakeholder Judge

Acceptance Criteria

Preliminary survey of organizational requirements

4 days

Investors

  Authentic presentation of the project  requirements

Gathering I T resources

 7days

IT Manager

 Relevant  resources

Assembling the machines

32  days

IT Manager

  Offering effective assistance  to   the project

 Purchase of raw  materials

 25  days

Operations  Manager

   Relevant to  the project requirements

Order requirements

 10 days

Project Manager

  Efficient usage

Preparation of retail constituents

 5 days

   IT Manager

 Retail assessment

  Facilitating the preparation of  foundation base

 60 months

 IT Manager  Engineer

Strong  foundation

Development of   product  plan

28 days

Project Manager 

Enhanced utilization of resources

Estimation of Total time period

35   dayd

Operation Manager

  Time limit or deadline

Implementing the business  analytics

 14  days

 IT  Manager

 Effective business operations

Executing  project requirement

 12  days

Project  Manger

Determining  the  project constituents

Evaluating  the results

 15 days

 Achieving the objectives set at the outset

Make required alteration

5  days

Sponsor

 Strong  business operations

Project Risk

Risk Owner

Raw material  quality 

IT manager

Cost of  production

 Finance  Manager

Wrong assessment of  raw materials

Civil Engineer

  Lack of sponsorship

Project Manager

Equipment   support procedure

Procurement Manager

 Wrong preliminary design

IT manager

Insufficient use of resources

    Project  manager

The IT project shall have an important effect on the stakeholders of a business enterprise. The cost incurred in these projects would add to the production expenses of the firm.  In this regard,   it can be said that this would enable the stakeholders to judge the existing condition of the business enterprise. Also the  benefits  related to the   adoption  of   IT project management   would  be explained to  the shareholders of the  management  to assist them to make important financial decisions of the business enterprise (Kaiser et al. 2015). The stakeholder management is a pertinent issue that can have an important effect on the implementation of   IT project management. As such, these factors must be considered when building business applications and analytics in an organization.

The communications management have an essential influence on  the relationship between   the stakeholders of the  management and  the project  management team.  Regular reports are provided to the stakeholders regarding  the progress of  IT  project management procedure and its implications on the current business processes,  in the context  of  the  retail market  (Müller et al. 2013).

Gantt chart  

Outline Number

Task Name

Duration

Start

Finish

Predecessors

Resource Names

0

 IT project management

86 days

Mon 05-05-16

Mon 05-05-16

   

1

   Project start date

0 days

Mon 05-05-16

Mon 05-05-16

 

Project Manager

2

   Phase 1: Requirement specification

18 days

Mon 05-05-16

Wed 27-05-16

   

2.1

       Meeting with key personells

0.5 days

Mon 05-05-16

Mon 05-05-16

1

Project Manager

2.2

       Assessing the present situation of the school

1 day

Mon 05-05-16

Tue 05-05-16

3

Information System  

2.3

      Assessing the requirements of the system

0.5 days

Tue 05-05-16

Tue 05-05-16

4

Information System  

2.4

      Collecting information about the methods currently being used

1 day

Wed 06-05-16

Wed 06-05-16

5

Systems Analyst

2.5

     Client meetings to decide on the design the system.

1 day

Thu 07-05-16

Thu 07-05-16

6

Information System

2.6

      Documentation phase 1

14 days

Fri 08-05-16

Wed 27-05-16

   

2.6.1

         Developing the scope statement

1 day

Fri 08-05-16

Fri 08-05-16

7

Subject Matter Expert

2.6.2

         The requirement  of the IT project management

0.5 days

Mon 11-05-16

Mon 11-05-16

9

Subject Matter Expert tasks (SMEA)

2.6.3

Emphasizing  on functional requirements of the business applications and analytics processes

0.5 days

Mon 11-05-16

Mon 11-05-16

10

Subject Matter Expert

2.6.4

         Developing the documents to be used for identifying the functional and non-functional requirements of the Gantt chart

2 days

Tue 12-05-16

Wed 13-05-16

11

Subject Matter Expert

2.6.5

Presentation of documents

1 day

Thu 14-05-16

Thu 14-05-16

12

Project Manager

2.6.6

 Acceptance  of proposal

1 day

Fri 15-05-16

Fri 15-05-16

13

 

2.6.7

         Acceptance of changes indicated by client

2 days

Mon 18-05-16

Tue 19-05-16

14

Systems Analyst

2.6.8

         Time estimation of project

2 days

Wed 20-05-16

Thu 21-05-16

15

Subject Matter Expert

2.6.9

Project budget estimation

2 days

Fri 22-05-16

Mon 25-05-16

16

Subject Matter Expert

2.6.10

 Schedule and budgetary requirements to the client.

1 day

Tue 26-05-16

Tue 26-05-16

17

Project Manager

2.6.11

   The procedure approval of  budget and schedule

1 day

Wed 27-05-16

Wed 27-05-16

18

 

2.7

      Approval of proposals

0 days

Wed 27-05-16

Wed 27-05-16

19

 

3

   Phase 2: Defining the entire project team

8 days

Thu 28-05-16

Mon 08-05-16

   

3.1

Approval of the team

3.5 days

Thu 28-05-16

Tue 05-05-16

   

3.1.1

         Selection of project team

0.5 days

Thu 28-05-16

Thu 28-05-16

20

Project Manager

3.1.2

         Selection of project leader

1 day

Thu 28-05-16

Fri 29-05-16

23

Project Manager

3.1.3

         Discussion on the mission and vision of the project undertaken

1 day

Fri 29-05-16

Mon 05-05-16

24

Program Team member

3.1.4

         Documenting team rules

0.5 days

Mon 05-05-16

Mon 05-05-16

25

Project Manager

3.1.5

         Skill determination

0.5 days

Tue 05-05-16

Tue 05-05-16

26

Information System

3.2

      Deciding on the training needs of the resources.

4.5 days

Tue 05-05-16

Mon 08-05-16

   

3.2.1

          Collecting information regarding the skill sets of the resources

1 day

Tue 05-05-16

Wed 05-05-16

27

Project Manager

3.2.2

         Documenting the roles and responsibilities of the project team

0.5 days

Wed 05-05-16

Wed 05-05-16

29

Project Manager

3.2.3

Training of resources for development of skills and aptitude

3 days

Thu 05-05-16

Mon 08-05-16

30

Program Team member

4

   Phase 3 : Development phase

44 days

Tue 09-05-16

Fri 08-05-16

   

4.1

      The prototype

21 days

Tue 09-05-16

Tue 08-05-16

   

4.1.1

Design  relating  to the system .

2 days

Tue 09-05-16

Wed 10-05-16

31

Information System Expert

4.1.2

Establishment of  prototype based on the primary designs

7 days

Thu 11-05-16

Fri 19-05-16

34

Program Team member, Software [1]

4.1.3

         Faciliataing  clientTest

4 days

Mon 22-05-16

Thu 25-05-16

35

Systems Analyst

4.1.4

         Considering changes requested by the client

7 days

Fri 26-05-16

Mon 07-05-16

36

System Expert

4.1.5

         The  procedure of  approval of the client

1 day

Tue 08-05-16

Tue 08-05-16

37

Project Manager

4.2

      Prototype approved by client

0 days

Tue 08-05-16

Tue 08-05-16

38

 

4.3

 Establishment of the working model relating to the development of business applications and design

23 days

Wed 09-05-16

Fri 08-05-16

   

4.3.1

         Final design

4 days

Wed 09-05-16

Mon 14-05-16

39

Information System Expert

4.3.2

         Coding

12 days

Tue 15-05-16

Wed 30-05-16

41

Program Team member

4.3.3

         Test phase

2 days

Thu 31-05-16

Fri 05-05-16

42

Quality Assurance Tester

4.3.4

system installation

3 days

Mon 05-05-16

Wed 06-05-16

43

Program Team member

4.3.5

         Integration examination (after the system has been used for a fewdays)

2 days

Thu 07-05-16

Fri 08-05-16

44

Quality Assurance Tester

4.4

      Business application  system procedure

0 days

Fri 08-04-16

Fri 08-05-16

45

Project Manager

5

   Phase 4: Employee Training phase

13 days

Mon 11-04-16

Wed 27-05-16

   

5.1

      Documentation of user manuals and/ or the The IT  project management  system manuals

3 days

Mon 11-04-16

Wed 13-05-16

46

Subject Matter Expert on administrative tasks (SMEA)

5.2

      Documenting training materials

4 days

Thu 14-04-16

Tue 19-05-16

48

Qualified personels    facilaiting administrative tasks (SMEA)

5.3

      Conducting a training program for the employees

6 days

Wed 20-04-16

Wed 27-05-16

49

Information System procedure

6

   Phase 5: Project closure phase

3 days

Thu 28-04-16

Mon 05-05-16

   

6.1

      Conducting the post implementation review

0.5 days

Thu 28-04-16

Thu 28-05-16

50

Subject Matter Expert relating to finance and commerce (SMEF)

6.2

      Role  of client

0.5 days

Thu 28-04-16

Thu 28-05-16

52

Project Manager

6.3

      Documenting the ‘Lessons learnt’

1 day

Fri 29-04-16

Fri 29-05-16

53

Project Manager

6.4

      Release project resources

1 day

Mon 02-05-16

Mon 05-05-16

54

Project Manager

7

   End of project

0 days

Mon 02-05-16

Mon 05-05-16

55

 

As per the goals and objectives of the organization, the following quality management standards have been established.

Functional measurer- As per the objectives of the organization, the functional measures have been decided.  The functional measures relate o the attributes that directly contribute to the goals and objectives of the organization (Bowers and Khorakian 2014).  These relate to pertinent operational policies of the management of the organization.

Non- functional measures – The non-functional measures relates  to the attributes that do not have a significant impact on the business success and failure of a business enterprise .These characteristics relate to the operational as well as financial strategies of a business enterprise

Performance — The performance of a business enterprise is dependent on a number of factors. These relate to favorable market conditions, the current market position of a business enterprise and other external factors that has been affecting the position of business enterprise.  Regular reporting should be done to the stakeholders of the business organization regarding the specific details about the IT project (Joslin. and Müller 2015). The business applications as well as the analytics of the business enterprise shall have a potent effect on the   

Accuracy – The authenticity of the financial statements is an essential factor in determining the financial stability of a business enterprise. Thus, it is an important attribute that the organization has to consider when implementing IT project management procedure in a business enterprise.

Project Requirements

Security- The quality management of an organization places special emphasis on the protecting the important documents of a business enterprise (Teller 2013). This relates to prevent disclosing of financial and operational data of a business enterprise that can have an adverse impact on the reputation and goodwill of a business enterprise.  

Compatibility – The organization has to make efforts to be compatible to the business organization. In this regard, it can be said that compatible policies shall enable an organization to develop the corporate strategies that shall improve the existing business policies of an organization.

Reliability – The organization policies has to be reliable in order to gain the trust of the shareholders as well as the employees of the organization. The reliable policies of an organization mostly refer to the traditional operational and manufacturing policies of an organization.

Flexibility – The most flexible financial policies of an organization refer to the human resource policies of an organization. It  is expected that the human resource policies of an organization shall be suitable towards the implementation of  IT project management procedures in the organization .This also relates to implementing newer business processes in the organization that shall require the assistance of the management of an organization .

The financial Management of an organization relates to the adopting costing techniques to reduce the business enterprise. This also relates to reducing the production expenses of a business enterprise by adopting efficient financial procedures. The projects finances shall be managed by the fair value method. The fair value method shall represent the authenticate performance of a business enterprise. In this regard, it can be said that it is the most preferred method of preparing the financial statement of a business enterprise as it states the most relevant financial figures of a business enterprise.

Risk Management – The method of risk management assesses the business processes that identify the requirements that pose a threat to the sustainability. The risk management process entails proper coordination of the economic as well as the financial resources of a business enterprise In addition; it evaluates the necessary attributes that are vital to the implementation of business applications and analytics in an organization. 

The project shall be managed through by giving regular reports to the management of a business organization. In addition, the operational department shall evaluate the performance of the newly established business applications and analytics against the standard yardstick set at the outset. In the case of any discrepancies, due measures shall be taken by the project management team to rectify the situation. Implement an in-depth project monitoring procedure would prevent unnecessary wastage of time and resources.

Proposed Deliverable

Lessons learnt 

In the implementation of the newer business applications and analytics, the brand would be able to facilitate its production and customer service policies. However, this shall incur considerable expenditures.  Therefore, the primary responsibility to establish a budget is to cover the requirements of the business organization. In addition , the total work  should be  allocated between  the  teams in the organization to  complete it successfully  requiring  minimum  time  and resources . As 1such, a predetermined plan should be framed to avoid any hassles in the implementation of business applications and analytics to provide support to Tesco.  

References  

Kerzner, H. 2013. Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons.  

Burke, R., 2013. Project management: planning and control techniques. New Jersey, USA.

Walker, A., 2015. Project management in construction. John Wiley & Sons.

Leach, L.P., 2014. Critical chain project management. Artech House.  

Phillips, J., 2013. PMP, Project Management Professional (Certification Study Guides). McGraw-Hill Osborne Media

Turner, J.R. ed., 2014. Gower handbook of project management. Gower Publishing, Ltd..

Marchewka, J.T., 2014. Information technology project management. John Wiley & Sons.

Heagney, J., 2012. Fundamentals of project management. AMACOM Div American Mgmt Assn.

Mir, F.A. and Pinnington, A.H., 2014. Exploring the value of project management: linking project management performance and project success.International Journal of Project Management, 32(2), pp.202-217.

Crawford, J.K., 2014. Project management maturity model. CRC Press.  Unab, W. and Kundi, M.F.A., 2014. Review of Project Management (PM) Practices in Public Infrastructure Development Organizations of Pakistan.Journal of Strategy and Performance Management, 2(4), p.144. 

Teller, J., Kock, A. and Gemünden, H.G., 2014. Risk management in project portfolios is more than managing project risks: a contingency perspective on risk management. Project Management Journal, 45(4), pp.67-80.

Meng, X., 2012. The effect of relationship management on project performance in construction. International journal of project management,30(2), pp.188-198.

Young, T.L., 2013. Successful project management (Vol. 52). Kogan Page Publishers.

Holzmann, V., 2013. A meta-analysis of brokering knowledge in project management. International Journal of Project Management, 31(1), pp.2-13.

Caniëls, M.C. and Bakens, R.J., 2012. The effects of Project Management Information Systems on decision making in a multi project environment. International Journal of Project Management, 30(2), pp.162-175.

Lock, M.D., 2014. The essentials of project management. Ashgate Publishing, Ltd..

Tong, M. and Thomson, C., 2015. Developing a Critical Literature Review for Project Management Research. Designs, Methods and Practices for Research of Project Management, p.153.

Besner, C. and Hobbs, B., 2013. Contextualized project management practice: A cluster analysis of practices and best practices. Project Management Journal, 44(1), pp.17-34.

What Will You Get?

We provide professional writing services to help you score straight A’s by submitting custom written assignments that mirror your guidelines.

Premium Quality

Get result-oriented writing and never worry about grades anymore. We follow the highest quality standards to make sure that you get perfect assignments.

Experienced Writers

Our writers have experience in dealing with papers of every educational level. You can surely rely on the expertise of our qualified professionals.

On-Time Delivery

Your deadline is our threshold for success and we take it very seriously. We make sure you receive your papers before your predefined time.

24/7 Customer Support

Someone from our customer support team is always here to respond to your questions. So, hit us up if you have got any ambiguity or concern.

Complete Confidentiality

Sit back and relax while we help you out with writing your papers. We have an ultimate policy for keeping your personal and order-related details a secret.

Authentic Sources

We assure you that your document will be thoroughly checked for plagiarism and grammatical errors as we use highly authentic and licit sources.

Moneyback Guarantee

Still reluctant about placing an order? Our 100% Moneyback Guarantee backs you up on rare occasions where you aren’t satisfied with the writing.

Order Tracking

You don’t have to wait for an update for hours; you can track the progress of your order any time you want. We share the status after each step.

image

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

image

Trusted Partner of 9650+ Students for Writing

From brainstorming your paper's outline to perfecting its grammar, we perform every step carefully to make your paper worthy of A grade.

Preferred Writer

Hire your preferred writer anytime. Simply specify if you want your preferred expert to write your paper and we’ll make that happen.

Grammar Check Report

Get an elaborate and authentic grammar check report with your work to have the grammar goodness sealed in your document.

One Page Summary

You can purchase this feature if you want our writers to sum up your paper in the form of a concise and well-articulated summary.

Plagiarism Report

You don’t have to worry about plagiarism anymore. Get a plagiarism report to certify the uniqueness of your work.

Free Features $66FREE

  • Most Qualified Writer $10FREE
  • Plagiarism Scan Report $10FREE
  • Unlimited Revisions $08FREE
  • Paper Formatting $05FREE
  • Cover Page $05FREE
  • Referencing & Bibliography $10FREE
  • Dedicated User Area $08FREE
  • 24/7 Order Tracking $05FREE
  • Periodic Email Alerts $05FREE
image

Services offered

Join us for the best experience while seeking writing assistance in your college life. A good grade is all you need to boost up your academic excellence and we are all about it.

  • On-time Delivery
  • 24/7 Order Tracking
  • Access to Authentic Sources
Academic Writing

We create perfect papers according to the guidelines.

Professional Editing

We seamlessly edit out errors from your papers.

Thorough Proofreading

We thoroughly read your final draft to identify errors.

image

Delegate Your Challenging Writing Tasks to Experienced Professionals

Work with ultimate peace of mind because we ensure that your academic work is our responsibility and your grades are a top concern for us!

Check Out Our Sample Work

Dedication. Quality. Commitment. Punctuality

Categories
All samples
Essay (any type)
Essay (any type)
The Value of a Nursing Degree
Undergrad. (yrs 3-4)
Nursing
2
View this sample

It May Not Be Much, but It’s Honest Work!

Here is what we have achieved so far. These numbers are evidence that we go the extra mile to make your college journey successful.

0+

Happy Clients

0+

Words Written This Week

0+

Ongoing Orders

0%

Customer Satisfaction Rate
image

Process as Fine as Brewed Coffee

We have the most intuitive and minimalistic process so that you can easily place an order. Just follow a few steps to unlock success.

See How We Helped 9000+ Students Achieve Success

image

We Analyze Your Problem and Offer Customized Writing

We understand your guidelines first before delivering any writing service. You can discuss your writing needs and we will have them evaluated by our dedicated team.

  • Clear elicitation of your requirements.
  • Customized writing as per your needs.

We Mirror Your Guidelines to Deliver Quality Services

We write your papers in a standardized way. We complete your work in such a way that it turns out to be a perfect description of your guidelines.

  • Proactive analysis of your writing.
  • Active communication to understand requirements.
image
image

We Handle Your Writing Tasks to Ensure Excellent Grades

We promise you excellent grades and academic excellence that you always longed for. Our writers stay in touch with you via email.

  • Thorough research and analysis for every order.
  • Deliverance of reliable writing service to improve your grades.
Place an Order Start Chat Now