Boston Big Dig Project: Challenges, Factors And Risk Management Strategies

Background

Discuss about the Risk Analysis and Mitigation Project.

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

Boston Big Dig Project was one of the learning projects based on which various learnings can be gained and practiced in the present and future project as a learning. The project was highlighted globally because of complexity, technical challenges, and other factors those lead the project delivery delayed by almost 8 years with the enhancement of budget from 2 million to 15 billion that was more than the seven times estimations (Shenhar and Holzmann 2017). The estimated budget of the project was $ 2 billion during the estimation and planning phase and the project was closed at $ 15 billion.

The project was initiated in the 1984 and was expected to be delivered by 1998 however; due to uncountable uncertainties, the project was delivered successfully in 2007. With the passage of the time, many complications and challenges were faced for the successful accomplishment of the project (Flybjerg 2017). The major factor for the escalation in the budget and schedule that was reported was the failure in the identification of the underground surfaces, mitigation costs, and enhancement in the scope of the project. The estimated time was six years however; the project was delivered in fourteen years that was way away from the estimation and hence, the project cannot be expected to be delivered within the scope.

The project was initiated considering the intention of reducing the flow of the traffic by the Boston’s city through depressing portion of the I-93 highway other than construction of the harbor tunnel (Pinto 214). The sense behind this project was to introduce a new gateway towards the city in addition with the improvement in the infrastructure through establishing new civic spaces and adding parks.

Many difficulties were faced during the development of the project that includes the following:

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

Cost escalation: due to failure in the identification of the past constructions, under surface conditions, design and construction, schedule enhancement, reconstructions, politics, delayed integrated project management, improper communication with the stakeholders and many more (scheduInvernizzin et al. 2017).

Schedule escalation: same elements had been resulted in the enhancement of the schedule of the project including the improper planning and underestimating many factors. It should be made sure that every stakeholder attends the meeting and everyone put his or her perspective and thoughts related to the project execution for the effective and efficient execution of the communication related to the aspects of the project.

Lack in management skills was another major factor that leads the project to be delayed so much and escalated the cost (Verwij 2015). Complex processes, and resources displacement was another major lagging factor for the delivery of the project.

Common People: the citizens of Boston and the America were the key stakeholders in manner to utilize the services being offered to them related to the delivery of the project.

Project Manager: Project manager would be responsible for the management of the project constraints and due to the vast size of the project; there were project t managers who were handling the growth and development of the project.

Challenges faced during the project development

Suppliers: The resources are the most crucial factor for the development of any project and suppliers are the key stakeholders responsible for managing the resources (Flvberg and Budzier 2018).

Government: The funds, budget, and allowance of the construction was the responsibility of the government.

Contractors: Contractors are responsible for managing the labors and accomplishment of the activities under their sections.

Sl. No.

Risk/Vulnerabilities

Description

Likelihood

Impact

1

Schedule Escalation

Case study states how such a mega project can result in the increment of the schedule of the project

3

5

2

Budget Escalation

Boston Big Dig is the current example that states that the budget might be increased drastically

4

5

3

Design Risk

Construction project always face such risks that might affect the whole project constraint (Davies et al. 2017)

3

4

4

Underground Surface

Digging and highway construction needs proper evaluation of the underground surface as this might affect the overall development and growth of the project

2

4

5

Resource jump

Resource lacking was not the cause in this project however, estimated budget was increased due to the wastage of the resource that was due to underestimation of the underground surface (Erikson and Kadefors 2017)

4

4

6

Improper communication

Executing the project without any proper communication plan could result in the conflicts that will affect the project negatively

3

5

7

Stakeholder Conflicts

Conflicts can be arise during the development of the project and hence, the project might deviates from the scope and objective (Boateng, Cheng, and Ogunlana 2015)

2

2

8

Resource displacements

Distance of the resources such as fuels, gas and others could alternatively affect the schedule and budget of the project

3

3

9

Improper estimation

If the manger lacks in making the estimation of the resources and other constraints would affect the execution phase of the project

2

5

10

Transportation

|Construction areas need proper and effective transport facility for ensuring the displace of the objectives (Rolstadas et al. 2014)

1

3

11

Technical risk

Lifting of the loads and other technical appliances utilized for the accomplishment of the construction

3

3

12

Environmental risk

Natural calamities can affect the overall growth of the project

1

3

13

Dust and Dirt

These are the risks that can result in health and medical issues including the vision problem at the sites (Dimitriou, Ward and Wright 2016)

4

4

Likelihood

5

4

R 5

R 13

R 2

3

R 8

R 11

R 3

R. 1

R 6

2

R 7

R 4

R 9

1

R 10

R 12

1

2

3

4

5

Impact

 

The above mentioned risks can be eliminated through following steps and procedures:

Risk identification: this is the first phase of the risk management strategy that emphasizes on the identification of the risks those might affect the overall growth and development of the project through affecting the project constraints (Pinto and Winch 2016). It includes the consideration of every phase involved in the project development ensuring the identification of the actions and sections those might affect the project development or any one phase of the project.

Risk Prioritization: Prioritizing the risk is the second major phase for the listing of the risks those need higher concentration than others as these risks are capable of influencing the project at the maximum level (Cole 2017).

Risk handling: Risk handling is another major factor that includes the management of the risks that whether risks needs to be eliminated, mitigated, transferred or ignored. There are many course of actions and identification of the proper action is the crucial part for the successful execution of this phase (Winch 2017).

Monitoring and controlling: This phase should concern the project at the same level as the changes needs to be applied accordingly in the project and proper evaluation should be done in manner to identify whether the imposed strategy is capable of minimizing the impact of the risk or not (Kerzner and Kerzner 2017).

Following are the techniques and processes those are capable of eliminating the risks from the project:

Proper communication: This strategy can be utilized for the effective and efficient growth and development of the project considering that every involved stakeholder is well aware of the constraints of the project including the scope, objective and aims for delivering the project. Regular meeting can be held, video conferencing can be arranged of some stakeholders cannot attend the meeting physically, questionnaires, surveys, and many more are some of the techniques for communicating with every stakeholder.

Proper Planning: the planning was made poorly in the condition of the case study as it lags in identifying the age of the buildings, pipes, and conditions of the underground surface those can be considered as the vital factor for such a big loss. Planning includes the consideration of every aspect of the project and that is what the project managers fail in the case of the Boston Big Dig (Winch 2017). Planning should also focus on the estimation of the risks those are capable of affecting the project. Leaving behind the aspects of the project during the planning phase results in the biggest risk for the project during the execution as identified in the case study and hence, all the corners should be evaluated while planning the project.  

Key stakeholders involved in the project

Estimation of Every Aspect: As explained earlier underestimating the aspects of the project results in the evolvement of the risks and those risks could affect the project severely and hence, will be affecting the overall growth of the project (Shenhar and Holzmann 2017). It includes the consideration of the causes and their relative causes on other phase and being prepared to tackle them in future without any hesitation. Being prepared for the future consequences is better strategy for the mitigation of the identified risks and uncertainties resulting in the effective and efficient delivery of the project with high quality. It also emphasize on the estimation of the risk impact on the project and if the mitigation strategy is not capable of eliminating the risks to the extent level, risk handling should be executed again in an efficient and effective manner.

Stakeholder identification: It includes engaging the stakeholders as per their capability and assigning them proper role and responsibilities throughout the whole project. It will be helpful in making sure that the individual performance is being increased and thus, resulting in the enhancement of the overall growth of the project with high standard. Stakeholder identification also emphasizes on the selection of the stakeholders capable of delivering objectives and responsibilities being assigned to them (Flyvberj 2017). It assures the efficiency of the project as every individual would be contributing his or her part and hence, the whole project will be delivered in an efficient and effective manner.

Proper managerial and leadership: this was another major factor for the failure of the Boston Big Dig project as the experienced managerial and leadership can be experienced considering the slow growth and large investment on the project. Manager should must be experienced and the project manager including the tough decisions those are capable of managing the scope and delivery of the project should do better decision-making (Pinto 2014). A proper leadership quality is the most crucial key for the delivery of the successful project ensuring that the project is being delivered in an efficient and effective manner.

Monitoring and Controlling the Project: Regular audit and monitoring helps in managing and manipulating the activities and schedule of the project sub activities in manner to make sure that the ultimate delivery is within the estimated time and cost. It focuses on identifying whether the milestones are being delivered within the expected schedule or not and if not additional resource or human power can be adjusted within the project for the delivery of the project within the estimated time and budget (Dimitriou et al. 2017). This was one of the lagging factor in the Boston big dig project, which resulted in the many drawbacks including the escalation of the budget and the cost.

Guidance from an experience player: Experienced managers who have handled similar types of project can be communicated for the guidance and acquiring their learning for the enhancement in the performance and output of the project. It results in gathering their knowledge that can be helpful in identifying the opportunities among the risks and utilize them within the project for enhancing the quality of the project. The above risk matrix can be prepared from the experienced player, it is one of the tool for prioritizing the risks, and the risks identified in the red section are capable if influencing the project in negative manner and stopping the growth and development of the project.

References

Boateng, P., Chen, Z. and Ogunlana, S.O., 2015. An Analytical Network Process model for risks prioritisation in megaprojects. International Journal of Project Management, 33(8), pp.1795-1811.

Cole, C., 2017. Project Management Evolution to Improve Economic Success of Infrastructure Projects. In Proceedings of the International Conference Theory and Applications in the Knowledge Economy (pp. 483-497).

Davies, A., Dodgson, M., Gann, D. and MacAulay, S., 2017. Five rules for managing large, complex projects. MIT Sloan Management Review, 59(1), p.73.

Dimitriou, H.T., Ward, E.J. and Wright, P.G., 2016. 3 Megaprojects and mega risks: Lessons for decision-makers of large-scale transport projects. Socioeconomic Evaluation of Megaprojects: Dealing with Uncertainties, p.44.

Dimitriou, H.T., Ward, E.J. and Wright, P.G., 2016. Megaprojects and mega risks: lessons for decision-makers of large-scale transport projects: OMEGA Centre lessons derived from European, US and Asia-Pacific case studies. In Socioeconomic Evaluation of Megaprojects (pp. 62-79). Routledge.

Eriksson, T. and Kadefors, A., 2017. Organisational design and development in a large rail tunnel project—Influence of heuristics and mantras. International Journal of Project Management, 35(3), pp.492-503.

Flyvbjerg, B. and Budzier, A., 2018. Report for the Edinburgh Tram Inquiry.

Flyvbjerg, B., 2014. What you should know about megaprojects and why: An overview. Project management journal, 45(2), pp.6-19.

Flyvbjerg, B., 2017. Introduction: The iron law of megaproject management.

Invernizzi, D.C., Locatelli, G. and Brookes, N.J., 2017. Managing social challenges in the nuclear decommissioning industry: A responsible approach towards better performance. International Journal of Project Management, 35(7), pp.1350-1364.

Pinto, J.K. and Winch, G., 2016. The unsettling of “settled science:” The past and future of the management of projects. International Journal of Project Management, 34(2), pp.237-245.

Pinto, J.K., 2014. Project management, governance, and the normalization of deviance. International Journal of Project Management, 32(3), pp.376-387.

Rolstadås, A., Tommelein, I., Morten Schiefloe, P. and Ballard, G., 2014. Understanding project success through analysis of project management approach. International journal of managing projects in business, 7(4), pp.638-660.

Shenhar, A. and Holzmann, V., 2017. The Three Secrets of Megaproject Success: Clear Strategic Vision, Total Alignment, and Adapting to Complexity. Project Management Journal, 48(6), pp.29-46.

Verweij, S., 2015. Once the shovel hits the ground: Evaluating the management of complex implementation processes of public-private partnership infrastructure projects with qualitative comparative analysis.

Winch, G., 2017. Megaproject Stakeholder Management. The Oxford Handbook of Mega-project Management. Oxford University Press, Oxford, UK, pp.339-361.

What Will You Get?

We provide professional writing services to help you score straight A’s by submitting custom written assignments that mirror your guidelines.

Premium Quality

Get result-oriented writing and never worry about grades anymore. We follow the highest quality standards to make sure that you get perfect assignments.

Experienced Writers

Our writers have experience in dealing with papers of every educational level. You can surely rely on the expertise of our qualified professionals.

On-Time Delivery

Your deadline is our threshold for success and we take it very seriously. We make sure you receive your papers before your predefined time.

24/7 Customer Support

Someone from our customer support team is always here to respond to your questions. So, hit us up if you have got any ambiguity or concern.

Complete Confidentiality

Sit back and relax while we help you out with writing your papers. We have an ultimate policy for keeping your personal and order-related details a secret.

Authentic Sources

We assure you that your document will be thoroughly checked for plagiarism and grammatical errors as we use highly authentic and licit sources.

Moneyback Guarantee

Still reluctant about placing an order? Our 100% Moneyback Guarantee backs you up on rare occasions where you aren’t satisfied with the writing.

Order Tracking

You don’t have to wait for an update for hours; you can track the progress of your order any time you want. We share the status after each step.

image

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

image

Trusted Partner of 9650+ Students for Writing

From brainstorming your paper's outline to perfecting its grammar, we perform every step carefully to make your paper worthy of A grade.

Preferred Writer

Hire your preferred writer anytime. Simply specify if you want your preferred expert to write your paper and we’ll make that happen.

Grammar Check Report

Get an elaborate and authentic grammar check report with your work to have the grammar goodness sealed in your document.

One Page Summary

You can purchase this feature if you want our writers to sum up your paper in the form of a concise and well-articulated summary.

Plagiarism Report

You don’t have to worry about plagiarism anymore. Get a plagiarism report to certify the uniqueness of your work.

Free Features $66FREE

  • Most Qualified Writer $10FREE
  • Plagiarism Scan Report $10FREE
  • Unlimited Revisions $08FREE
  • Paper Formatting $05FREE
  • Cover Page $05FREE
  • Referencing & Bibliography $10FREE
  • Dedicated User Area $08FREE
  • 24/7 Order Tracking $05FREE
  • Periodic Email Alerts $05FREE
image

Services offered

Join us for the best experience while seeking writing assistance in your college life. A good grade is all you need to boost up your academic excellence and we are all about it.

  • On-time Delivery
  • 24/7 Order Tracking
  • Access to Authentic Sources
Academic Writing

We create perfect papers according to the guidelines.

Professional Editing

We seamlessly edit out errors from your papers.

Thorough Proofreading

We thoroughly read your final draft to identify errors.

image

Delegate Your Challenging Writing Tasks to Experienced Professionals

Work with ultimate peace of mind because we ensure that your academic work is our responsibility and your grades are a top concern for us!

Check Out Our Sample Work

Dedication. Quality. Commitment. Punctuality

Categories
All samples
Essay (any type)
Essay (any type)
The Value of a Nursing Degree
Undergrad. (yrs 3-4)
Nursing
2
View this sample

It May Not Be Much, but It’s Honest Work!

Here is what we have achieved so far. These numbers are evidence that we go the extra mile to make your college journey successful.

0+

Happy Clients

0+

Words Written This Week

0+

Ongoing Orders

0%

Customer Satisfaction Rate
image

Process as Fine as Brewed Coffee

We have the most intuitive and minimalistic process so that you can easily place an order. Just follow a few steps to unlock success.

See How We Helped 9000+ Students Achieve Success

image

We Analyze Your Problem and Offer Customized Writing

We understand your guidelines first before delivering any writing service. You can discuss your writing needs and we will have them evaluated by our dedicated team.

  • Clear elicitation of your requirements.
  • Customized writing as per your needs.

We Mirror Your Guidelines to Deliver Quality Services

We write your papers in a standardized way. We complete your work in such a way that it turns out to be a perfect description of your guidelines.

  • Proactive analysis of your writing.
  • Active communication to understand requirements.
image
image

We Handle Your Writing Tasks to Ensure Excellent Grades

We promise you excellent grades and academic excellence that you always longed for. Our writers stay in touch with you via email.

  • Thorough research and analysis for every order.
  • Deliverance of reliable writing service to improve your grades.
Place an Order Start Chat Now
image

Order your essay today and save 30% with the discount code ESSAYHELP