Air Deployable Amphibious Vehicle With Fire Fighting Module

Design and Deployment of ADAV

Discuss about the Elevated Platform Firefighting Truck.

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

There has been a request by the authorities of the Australia to have in the existence a design and the implementation of those fast response multiagency systems. This system has come to be known as the Air Deployable Amphibious Vehicle, ADAV. This vehicle is designed in such away that it can operate both on the land and in the water. It is usually introduced into the field through the crafts and the preferred craft has been 22 RAAF airbases that is in the Australia. The deployment of the ADAV is done through the delivery system that is called a sled. The sled can be from the cargo, truck or the helicopter. The agencies have modules each attached to the ADAV using the mounting system. This mounting system allows the government agencies to respond with necessary equipment’s and tools during the emergencies.

The document focuses on the investigation of the Fire Fighting Module that can be effectively be fitted into the ADAV.In the past the system requirements had been made for the similar system but to ensure that the clarity purposes within the documents are achieved, there will be second mentioning the lists.

There will be the development of the system verification plan

There will be the development of the system validation covered in the same document.

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

The firefighting module of the Advowsons requirements have been developed in the assignment two documents and required one is as shown below.

It must be able to withstand the forces that are encountered during the deployment using the aircraft. This is per the documentation of the assignment two.

The vehicle is expected to operate on the land, water and this includes the adaptability to the variation of the land and water terrain while making the reference to the assignment two. All the ADAV connecting systems and the modules have IP66 ratings. The other characteristic considered here is the durability of the ADAV systems to MIL-STD-810 while concentrating on the vibration and shock profiles which are deemed fit for the terrain movement.

The desired features included the systems with the mating faces or the points. The mounting and the quick release systems in the ADAV are very important. This is a self-contained module. The system also functions in such a way that it can accept firefighting module and the other three personals.

The team Woking on the system will ensure that the design procedures and the methods of the manufacturing exceeds the normal duty cycle for this particular class of the few appliances with at least twenty years of the expectations. The warranty conditions should be submitted to meet the particular demands or the requirements.

Fast Response Multiagency System

The pump is expected to have a working flowrate of 600 litres for every one minute with a pressure of 1180 cap WU, P.P., SHI, P.F. and XIAO, J., 2013

The voltage of the pump shall be equal to the voltage of the vehicle and this will make the connections of the electrical system easier. Proper lagging of the fuel line system will be achieved especially the lines to the pump and those around the pump engine. The power unit is to be covered by the acoustic pane system in order to reduce the level of the sound to the acceptable standards which is normally 86dB.Producing the output that will operate the pump at the rating of 4.2.1 during all the entire working conditions

The stainless-steel materials shall be used to achieve the plumbing operations and in the valve installations which are resistant to the corrosions. The leakages will be prevented by sealing the joints. This should take into consideration the ease of maintenance that will definitely be a crucial stage WU, P.P., 2013. The warranty duration will extend to five years against the corrosion effects

The plumbing lines are also expected to have the least number of bends or the elbows .The brackets shall be used to support all the operations of the pipe work. The appropriate sizes in the fittings and the pipework will be used to the creation of the restrictions, turbulence and the destructions that results from the internally developed forces Nengqiang, Z., Lei, Z., Jiaxin, L. and Lihua, Z., 2015. This will definitely make the pump to work with its specified parameters and deliver the expected performance.

The Will be accommodation of the backflow in the water mains in accordance to the state regulation while submitting the final drawing proposal to the officers.

The valves will have permanent labels so make their identification easier. There will be provisions of the ball valves to isolate the system from the failure whenever there is pressure loss especially when the flexible hose pipes are used. Pump inlet plumbing will have at least one 65 mm inlet that is fitted with the coupling of starts that has the flow ball valve.

The delivery manifold shall be put at an angle of 30 degrees that will help in the prevention of the kinking of the pipes under the normal operation of the valves. The assembly of the hose reel will be done using a corrosion resistant material. The hose reel will also be made of the material that has high resistant to radiant hiatus light and with the safe working temperatures.

Air and Water Operations

A water tank whose capacity is at 1800 litres and very light besides being resistant to corrosion was used. The single cab appliance was made using an Aluminium material. The inspection hatch of an average diameter of 400mm will be used to fit the tank.

The underground tank will be provided to ensure the provision of the low centre of gravity that is needed. In order to prevent the water surge from adversely affecting the performance of the vehicle, suitable baffling systems shall be provided. The water tank will have the overflow pipe of an average diameter 100mm that will discharge to the ground level only.

The overflow mechanism is designed in such a way that there is no building of the pressure within the tank when the filling is being done. A separate electronic tank with the water at a lower level will be fitted with the warning devices that will give the alert when there is a system failure. The warning system is located on the top of the tank where they can easily be seen.

The lockers will be located at the same height as the tank of the water with the single cab and with the dual cab appliances. The doors for making the lockers will be made of the material that is light weight but of very heavy duty. The self-latching locks will be used with the doors. The ease of the operation of the doors will be achieved by providing lockers with the counter balancing systems

The officials of the fire agencies will be expected to provide the approval before any meaningful construction is done. The shutters will be provided with a perfect finish of the aluminium which is anodized. The shatter slats that will be used will not exceed 50mm wide and preferably 30 mm will be used. There will be a provision of the means of holding the doors together with the shutters. Each shutter will be having an easily operated bar that is also lockable.

The handle of the locker shall not protrude beyond the width of the appliance .The blocker drums will be located high so as to allow the easy opening of the door GAO et al 2012.The bump stop will be fitted with the shutter to prevent possible destruction in the shutter as the door opens. The nitrol chemical rubber that is also fuel resistant will be incorporated in the locker and any other opening will be sealed so as to limit the vapour from interfering with the clean lockers. The shelves will be made of the robust material that is known to be light. The parameters of the lockers must be given to the concerned authorities.

Fire Fighting Module for ADAV

The N/S locker will be made of a light weight that can easily be carried, plugging bar and two Scotty backpack that are purchased while they are empty. N/s rear tray for the storage purposes. A drum of capacity 20 litres and the access point with the fold out ladder.

O/S locker that will keep safely fifty litres fuel. It will be used together with the adjustable light mast assembly, a fire extinguisher, drip torches and the brackets. And finally, a proper Jerry can.

There will be provisions of the fuel container capacity 10 litres. The container will be located a few metres high to provide the security to the tank itself.

The best location for the chain will be provided for the chain saw including the relevant fuel and oil The lockers will be properly sealed to prevent the like hood of the cross contamination.

There will be a provision of very safe and secure storage points. Any alternative must be submitted to the authorities with immediate effect. The storage facility will be completely sealed on the two ends so as to ensure there is enough protection of the couplings for the washers.

The electrical system will be connected in such a way that prevents the malfunction and even the manual operation of the breaking parts. All the electrical circuits will be properly labelled to avoid confuse during the use of them. All the wires for the electrical systems will be whipped in looms and even protected from the moisture. The RED will indicate the positive terminal while the BLACK will indicate the negative terminal.

During the assignment two, the specification of the components that were required to meet the criteria of the design were discussed. The verification in the third assignment of the firefighting module for the machine is done in details. The verification of the performance was done using different methods that included Inspection, Testing, Analysis and finally Certification.

The inspection method will be used to check if the pump shall have the equal voltage compared to the vehicle and to ensure that it is properly connected to the electrical system. This inspection exercise will be achieved using the multimeter.

This is a very important stage since it will determine the viability of the project. The testing method of verification will be used to find out if all the shutters will incorporate counter balancing that makes the operation easy.

Features and Specifications of Fire Fighting Module

The analysis technique will be obtained from used to find out the location of the tank with the aim of creating a very low centre of the gravity. The information will be obtained from the mechanical handbook.

The systems used must be able to meet the standards that have already been laid down. The certification technique will help to check if the water level in the low pressure tank is maintained. This will be done in reference to the assignment two that had been previously done.

The main aim of the validation plan is to that the ADAV meets the conditions that had been set as described as the concept of the operation.

The scope of the study takes into account properties of the components of the firefighting and the subject them to test to determine their functionality.

The validation will be required to conform with the components that have already been illustrated as the requirements of the ADAV.All the subsystems to be of the requirement of the ADAV design. The system testing can be used to confirm the testing of the ADAV while exploring different environment. The service documentation is also evaluated.

The country is known to be sparsely populated and posses a variation in the nature of its landscape. In order to help the government in the quick responds during their service deliveries, the system can be but everywhere within the country. Since the stakeholders have varied demands with some of them suggesting water as a means of travel while others use land. The vehicle must therefore be able to carry the load as required.

The methods of achieving deployments may be through road transport, air using helicopters or the parachute. The firefighting module will be effectively fitted to the ADAV band will be designed as required by the authorities. The system will be used on the current with the light duty to reduce the cost.

The effective engineering and even scientific tools will have to be used together with well defined steps. The assumptions that are accepted must be proven.

All the parts or the procedures that not successful and their subsequent ratification must be corrected. The plans of the test must be a reflection of the environmental concern.

References

Yuan, D.P., Jin, X.S., Zhang, X.L., Wang, C.J., Jiang, L.R., Wang, X.B. and Shen, J.Y., 2012. Design and implementation of immersive environment for firefighting tactical training. Xiaofang Kexue yu Jishu, 31(2), pp.162-165.

Bird, S.N., Ruikar, K., Bosher, L., Glockling, J. and Bouchlaghem, N.M., 2014. Decision structuring method for the selection of fixed firefighting systems: development and lessons learned from case studies. Risk Analysis, 9, p.263.

JIANG, A.L. and XU, G.R., 2013. Research on the Structure Design of the Elevated Platform Firefighting Truck. Machinery Design & Manufacture, 5, p.068.

WU, P.P., SHI, P.F. and XIAO, J., 2013. The optimization and simulation on the boom hinge mechanism of fire hydraulic platform. Fire Science and Technology, 3, p.024.

GAO, T., QIN, X.S., ZHANG, F.Y. and ZHAO, W.T., 2012. Structure Design and Finite Element Analysis for an X-type Stabilizer of 20t Rescue Machinery. Manufacture Information Engineering of China, 13, p.010.

Nengqiang, Z., Lei, Z., Jiaxin, L. and Lihua, Z., 2015. Design of Feed Fermentation Machine with Turning Over and Mixing Mechanism. Agricultural Engineering, 5, p.044.

What Will You Get?

We provide professional writing services to help you score straight A’s by submitting custom written assignments that mirror your guidelines.

Premium Quality

Get result-oriented writing and never worry about grades anymore. We follow the highest quality standards to make sure that you get perfect assignments.

Experienced Writers

Our writers have experience in dealing with papers of every educational level. You can surely rely on the expertise of our qualified professionals.

On-Time Delivery

Your deadline is our threshold for success and we take it very seriously. We make sure you receive your papers before your predefined time.

24/7 Customer Support

Someone from our customer support team is always here to respond to your questions. So, hit us up if you have got any ambiguity or concern.

Complete Confidentiality

Sit back and relax while we help you out with writing your papers. We have an ultimate policy for keeping your personal and order-related details a secret.

Authentic Sources

We assure you that your document will be thoroughly checked for plagiarism and grammatical errors as we use highly authentic and licit sources.

Moneyback Guarantee

Still reluctant about placing an order? Our 100% Moneyback Guarantee backs you up on rare occasions where you aren’t satisfied with the writing.

Order Tracking

You don’t have to wait for an update for hours; you can track the progress of your order any time you want. We share the status after each step.

image

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

image

Trusted Partner of 9650+ Students for Writing

From brainstorming your paper's outline to perfecting its grammar, we perform every step carefully to make your paper worthy of A grade.

Preferred Writer

Hire your preferred writer anytime. Simply specify if you want your preferred expert to write your paper and we’ll make that happen.

Grammar Check Report

Get an elaborate and authentic grammar check report with your work to have the grammar goodness sealed in your document.

One Page Summary

You can purchase this feature if you want our writers to sum up your paper in the form of a concise and well-articulated summary.

Plagiarism Report

You don’t have to worry about plagiarism anymore. Get a plagiarism report to certify the uniqueness of your work.

Free Features $66FREE

  • Most Qualified Writer $10FREE
  • Plagiarism Scan Report $10FREE
  • Unlimited Revisions $08FREE
  • Paper Formatting $05FREE
  • Cover Page $05FREE
  • Referencing & Bibliography $10FREE
  • Dedicated User Area $08FREE
  • 24/7 Order Tracking $05FREE
  • Periodic Email Alerts $05FREE
image

Services offered

Join us for the best experience while seeking writing assistance in your college life. A good grade is all you need to boost up your academic excellence and we are all about it.

  • On-time Delivery
  • 24/7 Order Tracking
  • Access to Authentic Sources
Academic Writing

We create perfect papers according to the guidelines.

Professional Editing

We seamlessly edit out errors from your papers.

Thorough Proofreading

We thoroughly read your final draft to identify errors.

image

Delegate Your Challenging Writing Tasks to Experienced Professionals

Work with ultimate peace of mind because we ensure that your academic work is our responsibility and your grades are a top concern for us!

Check Out Our Sample Work

Dedication. Quality. Commitment. Punctuality

Categories
All samples
Essay (any type)
Essay (any type)
The Value of a Nursing Degree
Undergrad. (yrs 3-4)
Nursing
2
View this sample

It May Not Be Much, but It’s Honest Work!

Here is what we have achieved so far. These numbers are evidence that we go the extra mile to make your college journey successful.

0+

Happy Clients

0+

Words Written This Week

0+

Ongoing Orders

0%

Customer Satisfaction Rate
image

Process as Fine as Brewed Coffee

We have the most intuitive and minimalistic process so that you can easily place an order. Just follow a few steps to unlock success.

See How We Helped 9000+ Students Achieve Success

image

We Analyze Your Problem and Offer Customized Writing

We understand your guidelines first before delivering any writing service. You can discuss your writing needs and we will have them evaluated by our dedicated team.

  • Clear elicitation of your requirements.
  • Customized writing as per your needs.

We Mirror Your Guidelines to Deliver Quality Services

We write your papers in a standardized way. We complete your work in such a way that it turns out to be a perfect description of your guidelines.

  • Proactive analysis of your writing.
  • Active communication to understand requirements.
image
image

We Handle Your Writing Tasks to Ensure Excellent Grades

We promise you excellent grades and academic excellence that you always longed for. Our writers stay in touch with you via email.

  • Thorough research and analysis for every order.
  • Deliverance of reliable writing service to improve your grades.
Place an Order Start Chat Now
image

Order your essay today and save 30% with the discount code ESSAYHELP